Regis Resources Limited · ASX:RRL
Regis Resources — Shareholder Meeting (November 2009)
34 slides from Regis Resources's shareholder meeting presentation, Nov 27, 2009
Slide 1: ASX cover letter - Company Presentation
Regis Resources Limited ABN 28 009 174 761 www.regisresources.com Ground Floor, 62 Colin Street West Perth WA 6005 Australia PO Box 810 For personal use only West Perth WA 6872 Australia 27 November 2009 P +61 (0)8 9442 2200 F +61 (0)8 9442 2290 Manager Announcements Company Announcements Office Aus
Slide 2: Regis Resources Limited Annual General Meeting
REGIS RESOURCES LIMITED ANNUAL GENERAL MEETING
Slide 3: Disclaimer
Disclaimer For personal use only This presentation contains only a brief overview of Regis Resources Limited and its associated entities (“Regis or RRL") and their respective activities and operations. The contents of this presentation, including matters relating to the geology of Regis’ projects, m
Slide 4: Board of directors
For personal use only Mark Clark Managing Director Nick Giorgetta Chairman Morgan Hart Operations Director All previously exec directors of Equigold NL Ross Kestel Non Exec Mark Okeby Non Exec
Slide 5: Change of board and mandate
For personal use only Change of board by EGM vote on 4 May 2009 Mandate for election: Proven project development experience. Reduce capital cost of DGP and optimise return. Expedite development of DGP. Create value for shareholders. Overwhelming shareholder support
Slide 6: Capital structure
For personal use only ASX Code RRL FP shares on issue 367m Listed options 16m (RRLO, RRLOA, RRLOB) Warrants ($0.28, Jul 2010) 47m Unlisted options 4m Share price $0.59 Range (1yr) $0.07‐$0.61 Monthly volume (shares) 8m Major shareholders (assuming rights are taken up) Cash $50m Newmont 19% Seamans C
Slide 7: For personal use only
For personal use only
Slide 8: Duketon Gold Project
For personal use only 350 km north – north east of Kalgoorlie 424 granted leases 4,363 km2 of ground Significant gold resources Reserve at Moolart Well
Slide 9: Moolart Well reserve
For personal use only Proven Probable Total MT g/t Koz MT g/t Koz MT g/t Koz Laterite 9.5 1.44 437 0.6 0.98 19 10.1 1.41 456 Oxide 1.2 1.85 71 1.2 2.02 77 2.4 1.94 148 10.7 1.48 508 1.8 1.66 96 12.5 1.50 604 Moolart Well only 0.5 g/t lower cut
Slide 10: Moolart Well — Geology & Mineralisation
WEgls Hesonrees Lit) Moolart Well — Geology & Mineralisation =a 435400 mE 435800 mE = 500m RL Laterite Pit — 455,4000z Au Reserve P \—_ 7 " ‘alaeochanne ys Ses i “a-S @ ; ~ , \ \ OxidePit - — CSER_ SY \ j Saprolite Clay = ‘ » 148,2000z Au \._\ - aS Saprock TOFR AL. ~~ : Diorite Sa) ‘NY \ a Liberator
Slide 11: Mineralisation style
For personal use only Transported cover of approx 5m. Laterite ore zone averages 4m (max 20m). Oxide mineralisation from base of laterite to base of oxidation (averages 70m).
Slide 12: 92% of resource converts to reserve
For personal use only 92% of resource converts to reserve
Slide 13: Ore control
For personal use only Predictable grade change at upper ore boundary Visual control
Slide 14: Laterite ore and palaeochannel section
Soil horizon \(3ppb Au) LORS), ARAM li Sandy Conglomerate (red haematite pisolites) i @Hls Resources Lt Diamond Core Paeleochannel & Laterite Ore
Slide 15: Moolart Well diamond core - Laterite
Moolart Well diamond core - Laterite RRLMWDD132 @ 7.3 m <u Ay "i s/=, Goethite y coatings
Slide 16: Operations
For personal use only Operations Ore tonnes 12.4 MT Grade 1.51 g/t Recovery 92% Gold produced 555,136 oz Open pit mining – truck & shovel Primary crushing, SAG mill & CIL plant. Mill throughput 2.0Mtpa Mine life > 6 years Average production 90koz pa Max production 109koz pa
Slide 17: Metallurgy
For personal use only Metallurgy Bond Work Index ‐ Laterites 16.7 ‐ Oxide 7.1 Cyanide consumption ‐ Laterites 0.28kg/t ‐ Oxide 0.24kg/t Recovery (24 hrs) ‐ Laterites 92.6% ‐ Oxide 93.4%
Slide 18: Capital Costs
For personal use only Capital Costs $M Reduced from $125m Earthworks & concrete 6.7 Manage construction in Transport & craneage 3.3 Tanks contract 5.1 house Off site fabrication 4.4 All new equipment Structural & Mechanical 11.3 2.0 mtpa CIP plant SAG mill 6.2 Single stage crushing Piping 4.2 SAG mi
Slide 19: Operating costs and financials
For personal use only Operating costs $/oz Financial Mining 244 (gold A$1200/oz) Milling 211 Revenue $675m Lab & admin 40 Net cashflow $283m Cash costs 495 NPV @ 6% $201m Rehab 5 IRR 67% Royalties 62 Payback (months) 17 Total opex 562 •Current cost of diesel, cyanide • $110m tax losses & mill balls
Slide 20: For personal use only
For personal use only
Slide 21: Status
For personal use only Status No native title All permits in place Mining contract & power contract awarded Mill ordered Camp under construction Site earthworks nearing completion Major construction contracts awarded Concrete works commenced Î Scheduled start up Sept quarter 2010
Slide 22: For personal use only
For personal use only
Slide 23: Gutnick/Normandy legacy settlement
For personal use only Legacy issue from 1998 – 2004 Normandy / Gutnick arrangement RRL guarantor of Gutnick loan payable to Normandy Liability (March 2010) >$24m Settlement agreed: Convertible note $10m repayable 31 Dec 2012 Convertible at RRL election Interest free 5m options at
Slide 24: Debt Financing and Equity Raising
For personal use only Debt Financing Binding letter of offer received and accepted $45m debt facility Lightly covenanted & competitive terms 150koz of hedging required No options or other equity participation Equity Raising $50m ‐ $25m placement / $25m rights
Slide 25: For personal use only
For personal use only
Slide 26: Goal, Strategy and Delivery
For personal use only Goal Build reserves to 1 million ounces in 15 months Strategy Drilling density in Moolart Well oxides Mining study at Erlistoun Prioritise and drill resources at Petra, Dogbolter, Russells Find Reichelts Find etc Drill Garden Well, new prospects & regional exploration
Slide 27: Deposits in DGP
For personal use only 9 deposits in DGP All on granted mining leases Incremental reserve ounces likely
Slide 28: Moolart Well resource and reserve
For personal use only Current resource 859koz Current reserve 148koz 17% of resource converts to reserve Only 1km of 5km strike drilled 35% of resource in drilled area converts to reserve Further drilling required Incremental reserve ounces likely
Slide 29: Erlistoun resource
For personal use only Resource 270koz. 2.22MT at 3.85g/t 45km from plant site. Close to site access road. Initial reserve expected in Dec 09 quarter. Target 150koz Expedite into mining schedule. Russells Find & Reichelts Find nearby – 73koz resources
Slide 30: Laterite grade map
For personal use only T en No em rt Village ent h Tailings Bou nda ry Ai Mill Site rfi eld Pal aeo Laterite Grade cha nne >16 gm Au l 8 – 16 gm Au 4 – 8 gm Au 1k 2 – 4 gm Au m 1 – 2 gm Au
Slide 31: Moolart Well soil anomalies
For personal use only Moolart Well Gold in soil anomalies sit at the margin of the tertiary palaeochannel Regional application
Slide 32: Regional soil anomaly
For personal use only 40km south of Moolart Well 3 – 25 ppb gold in soil anomaly on edge of palaeochannel Discovery holes at end of traverse Open north & south
Slide 33: Resource 270koz
For personal use only Resource 270koz.
Slide 34: Summary
For personal use only Proven management team Duketon Gold Project Low capex – fully funded Low technical risk Strong cashflows First gold – Sept 2010 quarter Pipeline to 1 million oz reserve Quality Australian gold company Compare: AVO 0.8Moz Cap $545m DOM 0.7Moz Cap $427m TR