Torex Gold Resources Inc. · TSX:TXG

Torex Gold Resources — Investor Presentation (November 2023)

57 slides from Torex Gold Resources's investor presentation, Nov 14, 2023

  1. Slide 1: Corporate Presentation

    TSX | TXG CORPORATE PRESENTATION November 2023 All amounts expressed in U.S. dollars unless otherwise stated

  2. Slide 2: Safe Harbor Statement

    SAFE HARBOR STATEMENT Total cash costs per ounce of gold sold (“TCC”), all-in sustaining costs (“AISC”), sustaining and non-sustaining costs, average realized price, total cash cost margin, AISC margin, AISC margin per ounce of gold sold, adjusted net earnings, adjusted net earnings per share, earni

  3. Slide 3: Torex Overview

    TOREX OVERVIEW Intermediate Gold & Copper Producer C$1.1B 0.50x market value1 P/NAV1 Significant Size & Scale #2 474 koz gold producer in Mexico in 2022 gold produced in 2022 Large & Growing Resource Base ~4.9 Moz ~7.5 Moz ~2.1 Moz AuEq P&P at 3.98 gpt2 AuEq M&I at 4.86 gpt2 AuEq Inf. at 4.15 gpt2 H

  4. Slide 4: Investment Highlights

    INVESTMENT HIGHLIGHTS Future underpinned by solid long-term fundamentals1 Consistent track record of achieving Competitive cost profile providing strong production and cost guidance margins and cash flow generation Strong balance sheet and robust cash flow High-quality management team with supports

  5. Slide 5: ELG – A Foundational Asset

    ELG – A FOUNDATIONAL ASSET Future growth supported by strong cash flow and robust margins from ELG Q4 expected to be the strongest quarter of the year All-in sustaining margins expected to improve in Q4 EBITDA set to rebound in Q4 with strong production Quarterly free cash flow set to turn positive

  6. Slide 6: Five-Year Production Outlook

    FIVE-YEAR PRODUCTION OUTLOOK1,3 Continuously working to optimize future output Production Outlook Outlook Outlook 2022 Technical Actual (koz) 2 2021 2022 2023 Report 2021 (Au) 468.2 430 to 470 2022 (Au) 474.0 430 to 470 430 to 470 2023 (Au) 400 to 450 420 to 460 440 to 470 435.7 2024 (AuEq) 300 to 3

  7. Slide 7: Consistent and Reliable Producer

    CONSISTENT AND RELIABLE PRODUCER On track to deliver production guidance for fifth consecutive year1 In millions of U.S. dollars, unless otherwise noted FY 2023 FY 2023 YTD Q3 2023 Original Guidance Revised Guidance Performance Gold Production oz 440,000 to 470,000 No change 315,785 Total Cash Costs

  8. Slide 8: Strategic Pillars

    STRATEGIC PILLARS Executing on plan expected to significantly enhance shareholder returns1 OPTIMIZE & ADVANCE & DE-RISK GROW RESERVES & EXTEND ELG MEDIA LUNA RESOURCES PRUDENT CAPITAL BUILD ON ESG ALLOCATION EXCELLENCE 1) Please refer to Safe Harbor Statement on slide 2 8

  9. Slide 9: Optimize & Extend ELG

    OPTIMIZE & EXTEND ELG Maximizing potential of ELG Open Pits and ELG Underground1 Feed Source2 2023 2024 2025 2026 2027 2028 2029 2030 2031 2032 2033 ELG Open Pits ELG Underground Media Luna Underground Stockpiles Open pit mine life pushed out to mid-2025 following reserve additions in El Limón and E

  10. Slide 10: Optimize & Extend ELG

    OPTIMIZE & EXTEND ELG Key focus is on increasing mine life and boosting output from ELG Underground1 Cumulative gold mined plus year-end reserves Demonstrated ability to operate at 2,000 tpd with reflect a 400% increase over initial reserves record throughput of 2,321 tpd in Q3 2023 1) Please refer

  11. Slide 11: Advance & De-Risk Media Luna

    ADVANCE & DE-RISK MEDIA LUNA Media Luna solidifies the Morelos Property as our foundational asset1 Replaces production from ELG Open Pits Meaningful exposure to copper with annual and extends mine life out to at least 20332 production of 45 Mlbs per year post-20242 Executable Feasibility Study backe

  12. Slide 12: Advance & De-Risk Media Luna

    ADVANCE & DE-RISK MEDIA LUNA Development activities well advanced at midpoint of build period First concentrate production on track for late 2024 Completion Project To Date Q3 2023 Underground development 50% complete Procurement 52% Engineering 70% Guajes Tunnel breakthrough anticipated by year- Un

  13. Slide 13: Advance & De-Risk Media Luna

    ADVANCE & DE-RISK MEDIA LUNA Breakthrough of tunnel on south side of Balsas River anticipated by year-end1,2 Guajes Tunnel north access advanced ~5,395 m as at the end of October Average daily advance rate of 7.1 m year-to-date Advance from the south was ~2,455 m as at the end of October Average dai

  14. Slide 14: Advance & De-Risk Media Luna

    ADVANCE & DE-RISK MEDIA LUNA Development activities advancing well; concentrate production on track for late 20241 Concrete footings for flotation Water Treatment Plant and Mass fill for Cu concentrate area recently poured 230 kV substation storage area Bridge construction ahead of Installation of c

  15. Slide 15: Grow Reserves & Resources

    GROW RESERVES & RESOURCES Exploration and drilling focused on improving on Feasibility Study mine plan1 (A) Increased production outlook from ELG through 2027 to create overlap with Media Luna ramp-up5 (B) Focus on ELG Underground and EPO deposit as potential feed sources to fill the mill beyond 202

  16. Slide 16: Grow Reserves & Resources

    GROW RESERVES & RESOURCES Key strategic focus and investment in exploration and drilling1 Drilling/exploration budget of $39M in 2023 $20M at Media Luna Cluster (~55,000 m) Infill and expansionary drilling at EPO Inaugural drill program at ML West $6M at ELG Underground (~30,000 m) Infill and expans

  17. Slide 17: Grow Reserves & Resources

    GROW RESERVES & RESOURCES ELG Underground remains a key focus given potential to fill the mill beyond 20261 Initial results from 2023 drilling demonstrated the potential to expand and upgrade resources El Limón Sur Deep: Extended higher-grade mineralization outside of current resource and validated

  18. Slide 18: Grow Reserves & Resources

    GROW RESERVES & RESOURCES Initial results from 2023 drilling at EPO indicate potential to upgrade/expand resources Resource categorization drilling Currently 671 koz AuEq Indicated, 732 koz AuEq Inferred Infill drilling along the southern portion of the deposit returned intercepts with similar grade

  19. Slide 19: Prudent Capital Allocation

    PRUDENT CAPITAL ALLOCATION Well positioned to fund remainder of Media Luna Project1 Estimated internal funding requirement of $106M through year-end 2024 Free cash flow prior to spending on Media Luna Project was $184M over last 12 months2,3 Pro-rated for remaining project period (15 months) is $230

  20. Slide 20: Prudent Capital Allocation

    PRUDENT CAPITAL ALLOCATION Managing gold price and currency risk during build-out of Media Luna1 All amounts in U.S. dollars 2023 2024 Total Q4 Q1 Q2 Q3 Q4 (Average) Gold Forward Contracts Gold Volumes koz 43.5 43.5 43.5 27.0 27.0 184.5 Gold Price $/oz $1,957 $1,966 $1,966 $1,939 $1,939 $1,956 MXN/U

  21. Slide 21: Build on ESG Excellence

    BUILD ON ESG EXCELLENCE Delivering value to shareholders while making a positive difference in society Excellent environmental performance Strong governance & diversity focus Limited air emissions and water discharge operation Women make up 43% of Executive Team and 37% Filtered tailings facility ma

  22. Slide 22: Build on ESG Excellence

    BUILD ON ESG EXCELLENCE Sustained performance & ongoing improvement on ESG disclosure a key focus ESG performance now tied to cost of capital Clear and credible GHG emissions targets set One of the first mid-tier gold producers to enter into Scope 1 and 2 greenhouse gas emission targets 1 a Sustaina

  23. Slide 23: Executing on Long-Term Strategy

    EXECUTING ON LONG-TERM STRATEGY1 Targeting to improve valuation by successfully delivering on our plans WE DID WHAT WE SAID WE WOULD DO OUR GO-FORWARD PLAN IS ON TRACK Pivoted the strategy to focus on mining and Deliver Media Luna on time and on budget exploration Fill the mill beyond 2027 by bringi

  24. Slide 24: Appendix – Corporate Information

    APPENDIX – CORPORATE INFORMATION

  25. Slide 25: Corporate Strategy

    CORPORATE STRATEGY Executing on Strategic Pillars expected to generate long-term value1 OPTIMIZE & ADVANCE & DE-RISK GROW RESERVES & EXTEND ELG MEDIA LUNA RESOURCES Build on culture as key strategic Bring Media Luna into production Robust multi-year drill program at differentiator on time and on bud

  26. Slide 26: Management Team

    MANAGEMENT TEAM Years of Name Experience Experience Joined Torex in 2018 as COO JODY KUZENKO LLB 25+ Appointed CEO in 2020 President and Chief Executive Officer Previously served as Director of Business Strategy at Vale ANDREW SNOWDEN CPA, CA Joined Torex in 2021 20+ Chief Financial Officer Previous

  27. Slide 27: Board of Directors

    BOARD OF DIRECTORS Years of Name Experience Experience Board member since 2020 RICK HOWES P.Eng. 40+ Global technical, operational and management mining expertise Chair of the Board Currently President & CEO of Reunion Gold CEO since June 2020 JODY KUZENKO LLB ICD.D 25+ Joined Torex in 2018 as COO P

  28. Slide 28: Prudent Capital Allocation

    PRUDENT CAPITAL ALLOCATION Well positioned to fund strategic priorities Net cash2 of $188M at quarter-end Available liquidity of $501M as of September 30th $400 $300 $200 Balance (M$) $100 $0 ($100) ($200) Cash & ST Investments ($300) Debt & Lease-Related Obligations ($400) FY/18 FY/19 FY/20 FY/21 F

  29. Slide 29: Corporate Summary

    CORPORATE SUMMARY Share Price Performance1 Shareholder Data2 1.50 Other Resource (Active) 1.25 (Active) 15% (Indexed to January 1, 2021) Price Performance - USD 27% Resource 1.00 (Passive) 13% 0.75 Other Undisclosed/ (Passive) 0.50 Retail 11% 34% 0.25 TXG GDXJ Index Top 10 Shareholders2 0.00 Institu

  30. Slide 30: Gold Production Guidance

    GOLD PRODUCTION GUIDANCE1,2 Consistent track record of delivering on full year production guidance 1) Please refer to Safe Harbor Statement on slide 2. 2) Guidance Notes: * Production guidance in 2018 provided with Q1 financial results in May 2018 with restart of operations following five-month bloc

  31. Slide 31: All-In Sustaining Costs Guidance

    ALL-IN SUSTAINING COSTS GUIDANCE1,2,3 Achieved full year all-in sustaining cost guidance the past several years 1) Please refer to Safe Harbor Statement on slide 2 2) For more information on operational and financial results, including information on non-GAAP measures (such as AISC), please refer to

  32. Slide 32: Robust Cash Flow Generation from ELG

    ROBUST CASH FLOW GENERATION FROM ELG Funding position on solid footing given available liquidity and ongoing cash flow LTM Q4 2022 Q1 2023 Q2 2023 Q3 2023 Q3 2023 Net cash generated from operating activities (M$) $132.1 $47.0 $89.6 $44.2 $312.9 Free cash flow (M$)1 $40.5 ($54.0) ($37.4) ($69.7) ($12

  33. Slide 33: Key Operational Metrics

    KEY OPERATIONAL METRICS1 Consolidated Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 2021 2022 2022 2022 2022 2023 2023 2023 Mining - ELG Open Pit Ore mined (kt) 864 1,061 987 883 959 916 644 1,026 Ore mined (tpd) 9,392 11,789 10,846 9,598 10,420 10,182 7,074 11,153 Waste mined (kt) 8,972 8,958 7,960 9,097 8,546 8,437 11,

  34. Slide 34: Key Financial Metrics

    KEY FINANCIAL METRICS1 Consolidated All amounts in U.S. dollars Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 2021 2022 2022 2022 2022 2023 2023 2023 Key Metrics Gold sold (oz) 109,391 108,012 123,363 119,834 121,913 118,455 105,749 81,752 Realized gold price ($/oz) $1,798 $1,876 $1,865 $1,715 $1,784 $1,899 $1,960 $1,944

  35. Slide 35: Unit Cost Performance

    UNIT COST PERFORMANCE1 Solid cost performance despite ongoing inflationary pressures2 Open pit mining costs tracking higher than budget given additional stockpile rehandling and contractor costs associated with period of higher waste stripping during Q2 and Q3 Economies of scale from higher undergro

  36. Slide 36: Operating Cash Flow Seasonality

    OPERATING CASH FLOW SEASONALITY Operating cash flow tends to be weakest in H1 given timing of tax, royalty and PTU payments Final payments related to royalties, profit sharing, and taxes are subject to movements in the Mexican peso relative to the U.S. dollar Cash flow from operations prior to chang

  37. Slide 37: Cash Flow Seasonality

    CASH FLOW SEASONALITY Timing Differences – Royalties & Profit Sharing Royalty – Mexican Geological Survey Profit Sharing – Employees 2.5% of gross revenue Mandated by Government of Mexico Accrued quarterly and paid the following quarter Accrued quarterly and paid annually in Q2 of the Recognized in

  38. Slide 38: Cash Flow Seasonality

    CASH FLOW SEASONALITY Timing Differences – Mining Royalty & Corporate Income Tax Mining Royalty – Government of Mexico Corporate Income Tax – Government of Mexico 7.5% of mine level EBITDA plus allowable 30% of taxable income in Mexico deductions Accrued quarterly and paid monthly via Accrued quarte

  39. Slide 39: Responsible Gold Mining

    RESPONSIBLE GOLD MINING Key Highlights from 2022 99% operations employees from Mexico; $69M paid in salaries/benefits Industry-leading safety performance 0.28 LTIF – 13x lower than Mexican average1 92% procurement spend in Mexico; $107M paid to companies in Guerrero State 11 unique Community Develop

  40. Slide 40: Leverage Innovation

    LEVERAGE INNOVATION Proven technology to improve safety, minimize emissions, and drive value1 ROPECON FILTERED TAILINGS SART PLANT BEV FLEET2 Innovative 1.3 km conveyor “Dry-stack” filtered tailings Reduces consumption of our Media Luna to utilize a mix of system which transports ore facility best-i

  41. Slide 41: Gold247 Initiative

    GOLD247 INITIATIVE Gold247 The World Gold Council's strategic vision for transforming the global gold market and elevating gold into the mainsiream of financial markets. The initiative aims to enable more participation, Gold has a systemic role in the world's economy. The way ‘gold is traded, and su

  42. Slide 42: Appendix – March 2022 Technical Report

    APPENDIX – MARCH 2022 TECHNICAL REPORT

  43. Slide 43: Media Luna Project

    MEDIA LUNA PROJECT Media Luna solidifies the Morelos Property as our foundational asset1 Life of mine of 11.75 years with Media Luna versus ELG standalone case of 3.5 years2 Annual AuEq sold2 of 374 koz at a mine-site AISC2,3 of $954/oz AuEq 450 koz AuEq at a mine-site AISC of $929/oz AuEq through 2

  44. Slide 44: Media Luna Project – Technical Report Summary

    MEDIA LUNA PROJECT Summary of March 2022 Technical Report1,2 1) Please refer to Safe Harbor Statement on slide 2. 2) As per Technical Report for the Morelos Complex dated March 31, 2022. Gold equivalent sold assumes long-term gold price of $1,600/oz ($1,700/oz in 2022), silver price of $21/oz and co

  45. Slide 45: Media Luna Project – Technical Report Summary

    MEDIA LUNA PROJECT Summary of March 2022 Technical Report1,2 1) Please refer to Safe Harbor Statement on slide 2. 2) As per Technical Report for the Morelos Complex dated March 31, 2022. Gold equivalent sold assumes long-term gold price of $1,600/oz ($1,700/oz in 2022), silver price of $21/oz and co

  46. Slide 46: Upfront cost to develop Media Luna estimated at $848M

    MEDIA LUNA PROJECT Upfront cost to develop Media Luna Project estimated at $848M1,2 Metrics as of April 1, 2022 Total ($M) Excludes $124M of estimated project costs incurred 2,3 Non-Sustaining - Media Luna Project prior to April 1, 2022 Directs Guajes Portal & Tunnel $75.8 South Portals & Tunnels $4

  47. Slide 47: Drilling in 2023 focused on fill the mill initiatives

    MEDIA LUNA PROJECT Drilling in 2023 focused on supporting fill the mill initiatives and mine life extensions1 Mill capacity reduced from 13.0 ktpd to 10.6 ktpd in Q4 2024 Extend mine life and increase mining rates of ELG Underground Add incremental feed from ELG open pits Additional mill feed from M

  48. Slide 48: After-tax NPV (5%) of Morelos Complex and Media Luna

    MEDIA LUNA PROJECT After-tax NPV (5%) of Morelos Complex and Media Luna Project1,2 1) Please refer to Safe Harbor Statement on slide 2. 2) As per Technical Report for the Morelos Complex dated March 31, 2022 (base case economics assume long-term metal prices of $1,600/oz gold ($1,700/oz in 2022), $2

  49. Slide 49: Media Luna Project Schedule

    MEDIA LUNA PROJECT SCHEDULE1,2 1) Please refer to Safe Harbor Statement on slide 2. 2) Updated based on progress and revised schedule as of September 30, 2023 (refer to press release dated October 30, 2023, titled Torex Gold Provides Quarterly Update on Media Luna Project) 49

  50. Slide 50: Appendix – Mineral Reserves & Resources

    APPENDIX – MINERAL RESERVES & RESOURCES

  51. Slide 51: 2022 Mineral Reserve Additions

    2022 MINERAL RESERVE ADDITIONS Drilling successful in replacing a majority of AuEq reserve depletion in 20221,2 Replaced 68% of gold equivalent (“AuEq”) reserves processed in 2022 Replaced mine depletion in ELG Underground Expansion of El Limón pit added 190 koz to reserves and expansion of El Limón

  52. Slide 52: 2022 Mineral Resource Additions

    2022 MINERAL RESOURCE ADDITIONS AuEq resource growth in 2022 driven by EPO, Media Luna, and ELG Underground1,2 Gold equivalent (“AuEq”) M&I resources up 567 koz (+8%) Increase of 1,078 koz (+16%) prior to mine depletion M&I resource growth driven by: Ongoing success in ELG Underground Inaugural Indi

  53. Slide 53: Mineral Reserves

    MINERAL RESERVES1 Morelos Complex Tonnes Au Ag Cu Au Ag Cu AuEq AuEq (kt) (gpt) (gpt) (%) (koz) (koz) (Mlb) (gpt) (koz) Media Luna Underground Proven - - - - - - - - - Probable 23,017 2.81 25.6 0.88 2,077 18,944 444 4.54 3,360 Proven & Probable 23,017 2.81 25.6 0.88 2,077 18,944 444 4.54 3,360 ELG O

  54. Slide 54: Notes to Mineral Reserves

    NOTES TO MINERAL RESERVES Morelos Complex Notes to accompany Mineral Reserve Table 13. ELG Low Grade Mineral Reserves are reported above an in-situ cut-off grade of 0.88 g/t Au. 1. Mineral Reserves were developed in accordance with CIM (2014) guidelines. 14. It is planned that ELG Low Grade Mineral

  55. Slide 55: Mineral Resources

    MINERAL RESOURCES1 Morelos Complex Tonnes Au Ag Cu Au Ag Cu AuEq AuEq (kt) (gpt) (gpt) (%) (koz) (koz) (Mlb) (gpt) (koz) Media Luna Underground Measured 1,823 5.29 42.0 1.38 310 2,460 55 8.06 473 Indicated 25,567 3.02 30.1 1.05 2,486 24,708 589 5.11 4,196 Measured & Indicated 27,390 3.17 30.9 1.07 2

  56. Slide 56: Notes to Mineral Resources

    NOTES TO MINERAL RESOURCES Morelos Complex Notes to accompany the Summary Mineral Resource Table Notes to accompany the ELG Open Pit Mineral Resources 1. CIM (2014) definitions were followed for Mineral Resources. 14. The effective date of the estimate is December 31, 2022. 2. Mineral Resources are

  57. Slide 57: TSX | TXG www.torexgold.com

    TSX | TXG www.torexgold.com Dan Rollins, CFA Senior Vice President, Corporate Development and Investor Relations Email: dan.rollins@torexgold.com | Direct: 1-647-260-1503

Torex Gold Resources — Investor Presentation (November 2023) on 6ix