Altiplano Metals Inc. · TSXV:APN
Altiplano Metals — Investor Presentation (December 2021)
17 slides from Altiplano Metals's investor presentation, December 2021
Slide 1: Mining Revenue & Exploration Growth
Corporate Presentation December 2021 MINING REVENUE & EXPLORATION GROWTH TSX/V: APN | OTCQX: ALTFP | WKN: A2JNFG apnmetals.com | A Metals Group company
Slide 2: Forward Looking Statements
FORWARD LOOKING STATEMENTS Certain information regarding the Company contained herein may constitute forward-looking statements within the meaning of applicable securities laws. Forward-looking statements may include estimates, plans, expectations, opinions, forecasts, projections, guidance or other
Slide 3: About Us
ABOUT US Altiplano Metals is a Canadian mining company targeting the acquisition and development of near- South America term, cash-flowing assets in the Americas. Chile Our mission is to grow into a mid-tier producer by developing a portfolio of near-term production projects, cash-flowing assets, an
Slide 4: Management & Directors
MANAGEMENT & DIRECTORS John Williamson Ian Harris Executive Chairman & Director Chief Engineer 30+ years mining sector, founder of more than 20 25+ years experience as a mining executive and successful companies in Canada and around the globe mining engineer leading projects globally Alastair McInty
Slide 5: A Revenue Generator with Exploration Upside
A REVENUE GENERATOR WITH EXPLORATION UPSIDE Alitoplano's goal is to use cash-generating production assets to invest in new aquisitions, expansion opportunities, mill construction, and advanced exploration projects > In Production Assets | Farellon (Cu-Au) – Chile > In Development Assets | Maria Luis
Slide 6: Value Proposition
VALUE PROPOSITION 01 Leveraging the Copper, Gold, & Iron Markets 02 Focusing on Near-Term Producers Macroeconomic outlook supports higher global prices for all three Actively acquiring, developing, and expanding operations and commondites infrastructure whilst reducing costs and improving grade 03 S
Slide 7: Farellon - Located in Chile's Copper-Rich IOCG Belt
FARELLON - LOCATED IN CHILE'S COPPER-RICH IOCG BELT Peru South America • 30 minutes south of of La Serena, Chile with daily flights from Santiago Bolivia Pacific • High-grade (1.77% Cu) copper mine in a well-established Ocean mining district Chile • Excellent local infrastructure, positive community
Slide 8: Farellon - 6200 m Drill Program
FARELLON - 6200 M DRILL PROGRAM • Potential to outline an exploration target of over 60,000 tonnes of copper-gold and iron oxide mineralization • Exploration drilling to SW tests vein continuity with underground workings expansion opportunity • Potential to recover additional copper, gold and iron o
Slide 9: Farellon - Underground Decline System
FARELLON - UNDERGROUND DECLINE SYSTEM 64 m to surface Mined Drift Planned Drift Extracted Material Hugo De cline Farellon Vein Current Decline Progress Historic Drill Hole 3.36 m @ 1.59% Cu Select pierce points 400 masl from recent expansion Level 395 drilling levels under development Level 389 Leve
Slide 10: Farellon - Comparative Performance
FARELLON - COMPARATIVE PERFORMANCE Mined, Processed & Cu Grade Cost reductions and grade control have generated numerous 14,000 2.5% quarters of consecutive positive cash flow since Q1 2018 2.09% 12,000 1.97% 2.00% 2.0% Improvements observed in grade and total mined material 10,000 1.68% 1.53% 1.49%
Slide 11: Processing Facility
PROCESSING FACILIT Y MILL AND FLOTATION • 5,000 tonnes/month processing facility located 15 km from Farellon • Facility is permitted and under construction – expected completion Q1 2022 Contains two 5’ x 10’ ball mills and a full Cu-Au flotation circuit • Facility is designed to reduce current proce
Slide 12: Processing Facility - Copper-Gold-Iron Concentrate Process
PROCESSING FACILIT Y COPPER-GOLD-IRON CONCENTRATE PROCESS 2. Trucking to Milling Plant (15 km) 1. 5,000 tonnes 6. Decantation Cu/Au/Fe 7. Drying Process with extraction from chamber press filter Farellon Cu concentrate 3. Crushing 4. Milling 5. Flotation Process Process Process Tailings to Iron Conc
Slide 13: Maria Luisa
MARIA LUISA HIGH-GRADE PAST PRODUCER • A high-grade gold copper vein structure 100 km north of La Serena, Chile with historical mining grades of 6.85 g/t gold and 1.9% copper • Potentially two independent vein structures: NS-trending veins with recent underground results of 8.73 g/t Au over 5 m and
Slide 14: Rosario / Laura Expansion
ROSARIO / LAURA EXPANSION • Two additional vein structures located 600 m and 250 m from Farellon • Rosario is accessible by historical underground workings and can restart with minimal capital cost • Rosario is permitted to extract up to 5,000 tonnes/m of mineralized material • Opportunity to restar
Slide 15: Pastillas Project - Atacama Region, Chile
PASTILLAS PROJECT - ATACAMA REGION, CHILE Legend Pastillas Claims La Coipa PROJECT HIGHLIGHTS Au-Ag Epithermal N Major Au +/- Cu 768koz Au P+P reserves • 3,100 ha of exploration concessions in an Mines and Deposits 955koz Au M+I resources Copiapó established jurisdiction Maricunga Gold Belt • The Ma
Slide 16: San Pedro Project
SAN PEDRO Rock Grabs >5.0g/t Au 1.0-5.0g/t Au PROJECT 0.5-1.0g/t Au 0.1-0.5g/t Au <0.1g/t Au • Located in central Nicaragua within an erosional window exposing Tertiary-aged volcanics ; analogous setting to Calibre's 1.9 Mt @ 5.16 g/t Au Pavon Project. • 16,806 hectare concession under application w
Slide 17: Revenue.Growth.Discovery
Shares Outstanding 113,368,007 REVENUE.GROWTH.DISCOVERY (Nov. 24, 2021) Warrants ($0.40) 6,670,260 Warrants ($0.25) 9,473,454 Options (avg $0.20) 9,660,750 Fully Diluted 139,172,471 Cash ~$1.5 M In-the-money options ~ $3.5 M & warrants (if exercised) Head Office Alastair McIntyre 250 Southridge, sui
Altiplano Metals — Investor Presentation (December 2021) on 6ix