Emperor Metals, Inc. · CSE:AUOZ

Emperor Metals — Investor Presentation (March 2024)

28 slides from Emperor Metals's investor presentation, March 2024

  1. Slide 1: Advancing Canada's Next High-Grade Gold Deposit

    March 2024 ADVANCING CANADA’S NEXT HIGH-GRADE GOLD DEPOSIT CSE: AUOZ OTCQB: EMAUF FRA: 9NH

  2. Slide 2: Cautionary Statements

    CAUTIONARY STATEMENTS DISCLAIMER Emperor Metals Inc. is a Canadian mineral exploration company listed on the Canadian Securities Exchange, or CSE, which is operated by CNSX Markets Inc. Neither the CSE nor its Market Regulator (as that term is defined in the Trading Rules and policies of the CSE) ac

  3. Slide 3: About Emperor Metals

    ABOUT EMPEROR METALS High-grade gold - historical inferred Mineral Resource Estimate (MRE) of 727,000 ounces of gold at a grade of 5.42 g/t and an average thickness of 5.71 meters in 4.171 million tonnes* • Flagship Duquesne West Gold Project located in the heart of Rouyn-Noranda, Quebec, one of the

  4. Slide 4: Management and Directors

    MANAGEMENT AND DIRECTORS Management & Advisory of over JOHN FLOREK M.SC., P.GEOL. JOHN WILLIAMSON P.GEOL. 20 Public Mining Companies with President, CEO, and Director Independent Director and Chairman extensive experience in the Public +30 years of technical and senior management Mining Sector & Cap

  5. Slide 5: Capital Structure

    CAPITAL STRUCTURE As of March 2024 SNAPSHOT SHARE OWNERSHIP Shares Outstanding 82,458,324 Working Capital Est. $2.0M 15% 15% Warrants *21,466,292 Options * 4,775,000 70% Fully Diluted 108,699,616 * Avg Warrant price .21 cents and 1.6-years remaining life Management Retail High Net Worth Individuals

  6. Slide 6: 12 Month AUOZ:CSE Stock Chart

    12 MONTH AUOZ:CSE STOCK CHART As of March 11th, 2024 CSE AUOZ 6

  7. Slide 7: Duquesne West Gold Project

    DUQUESNE WEST GOLD PROJECT EXCELLENT ACCESS TO INFRASTRUCTURE AND POWER RICH HISTORY TOP TIER MINING OF PROLIFIC MINING JURISDICTION • The Abitibi Region is one of the world’s most • Located in the Noranda Mining Camp prolific gold producing districts with ~200 surrounded by 50 historical and active

  8. Slide 8: Tier 1 District – Abitibi Greenstone Belt

    TIER 1 DISTRICT – Abitibi Greenstone Belt HISTORIC PROLIFIC AND PRODUCTIVE MINING 8

  9. Slide 9: Tier 1 District – Abitibi Greenstone Belt: Infrastructure

    TIER 1 DISTRICT – Abitibi Greenstone Belt INFRASTRUCTURE 9 9

  10. Slide 10: District Ownership – Neighborhood Deposits

    DISTRICT OWNERSHIP NEIGHBORHOOD DEPOSITS 10

  11. Slide 11: AI Machine Learning at the Duquesne West Gold Project

    AI MACHINE LEARNING AT THE DUQUESNE WEST GOLD PROJECT Advantages of AI ⮚ Increased Efficiency: AI automates data analysis, expediting exploration workflows and optimizing resource allocation ⮚ Improved Accuracy and Precision: Machine N learning minimizes human bias, ensuring accurate identification

  12. Slide 12: Example of Potential Stope Grade and Thickness

    EXAMPLE OF POTENTIAL STOPE GRADE AND THICKNESS GRADE (Au, g/t) STOPE THICKNESS (m) CRITERIA USED 22.043 5.40 • Minable Shape Optimizer (MSO) 16.255 11.11 used Gold Cutoff of 3 g/t Au and Gold 15.860 11.38 15.669 11.37 Cap of 30 g/t Au 15.399 14.68 • Minimum dimensions 2.5 m (width) x 14.249 14.75 8

  13. Slide 13: New Targets from AI Modelling

    NEW TARGETS FROM AI MODELLING Preliminary Model - Grade x Thickness (Looking North) – Long Section 13

  14. Slide 14: 2023 Drilling Highlights

    2023 DRILLING HIGHLIGHTS 8,579 m drilling complete + 3,000 m of historical core sent for assays Emperor Metals pioneering AI/Machine Learning 3D and Geological Models aided our Exploration team in successfully hitting resource expansion drill targets that are adding ounces to this resource. The open

  15. Slide 15: Long Section of DQ-23-05 Intercept

    LONG SECTION OF DQ-23-05 INTERCEPT 10.8 m of 15.8 g/t Au Potential Stopes Figure showing DQ23-05 intercept-expanding ounces +100 meters along plunge of deposit This intercept adds ounces & stopes along this trend Exciting 2024 follow up drilling on this target! CSE AUOZ 15

  16. Slide 16: DQ23-02 Drill Hole Intercept

    DQ23-02 DRILL HOLE INTERCEPT Footwall Zone Minable Stope Optimizer Polygons Criteria: >2.5 m of >3.0 g/t Au 6.2 m of 16.3 g/t Au 8.7 m of 6.5 g/t N Au 17.2 m of 3.5 g/t Au Inset 3.65 m of 6.25 g/t Au Legend 4.1 m of 6.7 g/t DQ23-02 Intercepts Au Stope Model Thickness (m) & Grade (g/t Au) – Historica

  17. Slide 17: AI Geological Model

    AI GEOLOGICAL MODEL • First Ever Geological Model on Property (AI Developed) • Illuminates' competency contrast for previously unrecognized additional mineralized zones/ targets • Enlightens the controls to mineralization, with better targeting • Helps in the understanding to resource expansion • Im

  18. Slide 18: Phase I Assays and Core

    PHASE I ASSAYS AND CORE SUMMER 2023 DRILLING – DQ23-01 & DQ23-05 Representation of mineralized & altered core from Representation of mineralized & altered core from DQ23-05 DQ23-01 (11.7 m of 5.63 g/t Au) core depth of 531.3 m (10.8 m of 15.8 g/t Au (includes 3.4 m of 27.24 g/t Au)) – core depth of

  19. Slide 19: Phase I Assays and Core

    PHASE I ASSAYS AND CORE SUMMER 2023 DRILLING – DQ23-02 Representation of mineralized and altered core from Representation of mineralized and altered porphyry core from DQ23-02 (25.0 m of 1.69 g/t Au); bottom of hole ended in DQ23-02 (10.65 m of 3.97g/t Au (includes 5.0 m of 5.34 mineralization and t

  20. Slide 20: Open Pit Concept

    OPEN PIT CONCEPT SHOWING BOTH PHASE 1 AND ULTIMATE PIT SCENARIO Legend Gold Grades (g/t) Due to multiple zones of mineralization of both high-grade and lower grade bulk tonnage we have focused our remaining drilling towards the open pit concept that has been envisioned over the 2023 summer drilling

  21. Slide 21: Open Pit Conceptual Model

    OPEN PIT CONCEPTUAL MODEL (Location of DQ23-07 in Model) 6.5 m of 6.8 g/t Au 5.3 m of 10.3 g/t Au Phase 1 Pit Shells (in grey) 6.7 m of 10.3 g/t Au DQ23-02 7.4 m of 4.5 g/t Au DQ23-07 15.7 m of 0.82 g/t Au 7.2 m of 2.80 g/t Au 13.4 m of 6.1 g/t 21.5 m of 0.40 g/t Au 5.1 m of 22.7 Au Ultimate Pit g/t

  22. Slide 22: Open Pit Concept: Historical Drillholes in Open Pit

    OPEN PIT CONCEPT HISTORICAL DRILLHOLES (DDH) IN OPEN PIT It is estimated that up around 70% of historical drill core from surface to 500 meters is unsampled/assayed because they overlooked the open pit potential. We plan to send historic core for assays Historical Drillholes (DDH) in Open Pit, showi

  23. Slide 23: 2023 Drilling Program

    2023 DRILLING PROGRAM Arrows indicate where the resource body is still open CSE AUOZ 23

  24. Slide 24: Company Comparable Analysis

    COMPANY COMPARABLE ANALYSIS Updated as of January 12, 2024 CSE AUOZ 24

  25. Slide 25: Option Agreement to Earn 100% Interest

    OPTION AGREEMENT TO EARN 100% INTEREST DUQUESNE WEST GOLD PROJECT Work Work Year Due Date Cash Shares Commitment Commitment Date *Agreement 0 *$500,000 *1,500,000 *$250,000 *Oct 1, 2023 Signing * 1 *Anniversary Date *$500,000 *1,500,000 *$750,000 *Oct 1, 2024 2 Jan 20th, 2025 $500,000 1,500,000 *$1,

  26. Slide 26: Option Agreement Cost/Ounce - CAD

    OPTION AGREEMENT COST/OUNCE - CAD CSE AUOZ 26

  27. Slide 27: Investment Summary

    INVESTMENT SUMMARY ✔ Proven management team with a track record of growing gold deposits and successfully selling them to major gold-producing mining companies. ✔ Exploring in a prime mining jurisdiction, surrounded by 50 active and historical mines. ✔ The flagship Duquesne West Gold Project present

  28. Slide 28: Contact Us

    Contact Us Alex Horsley Corporate Development & Director Head Office alexh@emperormetals.com 10545 45 Avenue, NW 250 Southridge, Suite 300 778.323.3058 Edmonton, Alberta Canada, T6H 4M9 emperormetals.com CSE: AUOZ OTCQB: EMAUF FRA: 9NH CSE: AUOZ 28

Emperor Metals — Investor Presentation (March 2024) on 6ix