Hillgrove Resources Limited · ASX:HGO

Hillgrove Resources — Conference Presentation (December 2023)

35 slides from Hillgrove Resources's conference presentation, December 2023

  1. Slide 1: Australia's Next Copper Mine

    AUSTRALIA’S NEXT COPPER MINE Lachlan Wallace CEO & Managing Director December 2023 1

  2. Slide 2: Transformational Year

    TRANSFORMATIONAL YEAR Dec Dec 2022 2023 2

  3. Slide 3: Corporate Snapshot

    CORPORATE SNAPSHOT Company Overview Investment Highlights • ASX listed (‘HGO’) Australian resources company that owns and ✓ Advanced, fully permitted and funded project with key operates the Kanmantoo Copper Gold Mine in South Australia infrastructure in place • 20 years of strong operating experien

  4. Slide 4: Fully Permitted in Tier 1 Jurisdiction

    FULLY PERMITTED IN TIER 1 JURISDICTION ✓ Tier 1 location ✓ Ready workforce - No FIFO ✓ Close to Port Adelaide Top 10 jurisdiction in world Mining Investment Attractiveness 4

  5. Slide 5: Fully Permitted in Tier 1 Jurisdiction

    FULLY PERMITTED IN TIER 1 JURISDICTION ✓ Community support built over 20 years of genuine engagement 5

  6. Slide 6: Plant and Infrastructure Already in Place

    PLANT AND INFRASTRUCTURE ALREADY IN PLACE ✓ 3.6Mtpa processing plant ✓ All critical spares on site ✓ Maintained for quick, low-cost restart 6

  7. Slide 7: Tailings Storage Facility with Ample Capacity

    TAILINGS STORAGE FACILITY WITH AMPLE CAPACITY ✓ Tailings storage with approved capacity of >7Mt, well above current mine plan of 4.5Mt ✓ Further low-cost capacity available to accommodate growing mine plan ✓ All services connected (power, water). Long term power contract provides low prices until 20

  8. Slide 8: Established Workshop

    ESTABLISHED WORKSHOP NY ALUN UN

  9. Slide 9: Mining Commenced

    MINING COMMENCED Nugent Portal Development decline and Ventilation drive underground drill platform 9

  10. Slide 10: Excellent Conditions Enable Fast Turnover

    EXCELLENT CONDITIONS ENABLE FAST TURNOVER Underground decline commenced 10

  11. Slide 11: Excellent Conditions Enable Fast Turnover

    EXCELLENT CONDITIONS ENABLE FAST TURNOVER 11

  12. Slide 12: Primary Vent Install Increases Production

    PRIMARY VENT INSTALL INCREASES PRODUCTION Primary ventilation enables additional equipment to be deployed underground, increasing mine development rates. 12

  13. Slide 13: Secondary Egress Being Installed to Enable Stoping

    SECONDARY EGRESS BEING INSTALLED TO ENABLE STOPING First stope Secondary egress 13

  14. Slide 14: Underground Drilling Firming Up Initial Stopes

    UNDERGROUND DRILLING FIRMING UP INITIAL STOPES 14

  15. Slide 15: Underground Drilling Firming Up Initial Stopes

    UNDERGROUND DRILLING FIRMING UP INITIAL STOPES 15

  16. Slide 16: Ore Stockpiled

    ORE STOCKPILED ✓ Underground development underway ✓ First copper only 13m from portal 16

  17. Slide 17: Ore Stockpiled

    ORE STOCKPILED High grade ore on the ROM stockpile 17

  18. Slide 18: Mill Refurbishment on Track for First Copper

    MILL REFURBISHMENT ON TRACK FOR FIRST COPPER Pipe welding Float cell refurbishment Mill motor inspection 18

  19. Slide 19: Rotable Containers Arrived to Port Adelaide

    ROTABLE CONTAINERS ARRIVED TO PORT ADELAIDE 19

  20. Slide 20: On Track for First Copper Q1 2024

    ON TRACK FOR FIRST COPPER Q1 2024 20

  21. Slide 21: Exploration Growth

    HILLGROVE resourcrs EXPLORATION GROWTH

  22. Slide 22: 139 Holes, 163 Significant Cu-Au Intercepts, 600% Increase in MRE

    > 100% EXPLORATION STRIKE RATE 139 holes 163 significant Cu-Au intercepts 600% increase in MRE 22

  23. Slide 23: Just Scratching the Surface

    JUST SCRATCHING THE SURFACE Current Mine Plan 23

  24. Slide 24: Spitfire

    SPITFIRE ✓ 45.4m @ 1.19%Cu, 0.12 g/t Au from 428.5m downhole (KTDD243_W1) ✓ Nearest hole > 100m Refer ASX Announcement 28 August 2023 24

  25. Slide 25: Emily

    EMILY ✓ 71.7m @ 0.89%Cu from 132.7m downhole (KTDD239) ✓ 68.7m @ 0.9% Cu from 158.6m downhole (KTDD240), including; ✓ 35m @ 1.29%Cu from 192.2m downhole Refer ASX Announcement 3 July 2023 25

  26. Slide 26: Kanmantoo Deeps

    KANMANTOO DEEPS Exploration Target 50 - 80Mt 0.8 - 1.2%Cu 0.1 - 0.2g/t Au Refer ASX Announcement 11 October 2023 The Exploration Target above is for Kanmantoo Deeps only. The Exploration Target is conceptual in nature as there has been insufficient exploration to define a Mineral Resource. It is unc

  27. Slide 27: Australia's Next Copper Mine

    AUSTRALIA’S NEXT COPPER MINE 27

  28. Slide 28: Appendix

    Appendix 28

  29. Slide 29: Important Notice & Disclaimer

    IMPORTANT NOTICE & DISCLAIMER Summary information This presentation contains summary information about Hillgrove Resources Limited (Hillgrove or the Company) and its activities as at 27 February 2023. The information in this presentation is of a general nature and does not purport to be complete nor

  30. Slide 30: Important Notice & Disclaimer

    IMPORTANT NOTICE & DISCLAIMER Future performance continued The forward looking statements are subject to risks, stakeholder engagement, uncertainties and assumptions which could cause actual results, timing, or events to differ materially from the expectations described in such forward-looking state

  31. Slide 31: Important Notice & Disclaimer

    IMPORTANT NOTICE & DISCLAIMER Mineral Resources and Ore Reserves Estimates continued There is a lower level of geological and grade continuity confidence associated with Inferred Resources and there is no certainty that further exploration work will result in the conversion of Inferred Resource esti

  32. Slide 32: Important Notice & Disclaimer

    IMPORTANT NOTICE & DISCLAIMER Competent Person’s Statement The information in this report that relates to Exploration Target and Exploration Results is based on and fairly represents information and supporting documentation compiled by Peter Rolley, a Competent Person, a full-time employee of Hillgr

  33. Slide 33: Investment Risks

    INVESTMENT RISKS Potential investors should be aware that there are risks associated with investing in Hillgrove. Certain risks are beyond the control of Hillgrove and its Directors and Management and may have a material impact on Hillgrove's future operating and financial performance, and/or the fi

  34. Slide 34: Investment Risks

    INVESTMENT RISKS • The future success of the Company depends, to a significant extent, upon the continued services of the members of the management Key person team of the Company. There can be no assurance that the Company will be able to retain or hire all personnel necessary for the dependence dev

  35. Slide 35: References

    REFERENCES All exploration drill results, exploration information and Mineral Resource Estimates have previously been reported to the ASX by Competent Person at the time. The results reported herein are reported in the form and context of the original ASX releases. Refer http://www.hillgroveresource

Hillgrove Resources — Conference Presentation (December 2023) on 6ix