Centerra Gold Inc. · TSX:CG

Centerra Gold — Mining Forum Americas 2026 Conference

60 slides from Centerra Gold's conference presentation, September 2026

  1. Slide 1: Building a Strong Platform for Future Growth

    TSX CG NYSE CGAU BUILDING A STRONG PLATFORM FOR FUTURE GROWTH Investor Presentation SEPTEMBER 2026

  2. Slide 2: Cautionary Statement on Forward Looking Information

    Cautionary Statement on Forward Looking Information All statements, other than statements of historical fact contained or incorporated by reference in this document, which address events, results, outcomes or developments that the Company expects to occur are, or may be deemed to be, forward-looking

  3. Slide 3: Use of Non-GAAP and Other Specified Financial Measures

    Use of Non-GAAP and Other Specified Financial Measures This document contains “specified financial measures” within the meaning of NI 52-112, specifically the non-GAAP financial measures, non-GAAP ratios and supplementary financial measures described below. Management believes that the use of these

  4. Slide 4: Building a Strong Platform for Future Growth

    Building a Strong Platform for Future Growth CONSOLIDATED 2026 GUIDANCE KEMESS PROJECT | BC, CANADA MOUNT MILLIGAN MINE | BC, CANADA Production(4): 260 – 290Koz Au; 50 – 60Mlbs Cu 2026 Guidance Gold production costs: $1,500 – $1,600/oz 140 – 155Koz Au and 50 – 60Mlbs Cu AISC(1,2): $1,650 – $1,750/oz

  5. Slide 5: Compelling Value Proposition

    Compelling Value Proposition Self-funded organic growth pipeline focused on North America, with polymetallic exposure Attractive Growth in North American Favourable Self-Funded Organic Valuation Gold Production Jurisdictions Growth Pipeline Trading at a discounted P/NAV multiple, Focused on North Am

  6. Slide 6: Attractive Resource-Based Valuation

    Attractive Resource-Based Valuation Centerra’s Canadian and US mineral Centerra has global resources(1) Centerra has an attractive valuation resource base(1,3) is among the largest of 21.4 Moz AuEq, of which 98% compared to peers on an EV/global of its peers, with an attractive valuation is in Canad

  7. Slide 7: Executing on Centerra's Strategic Plan

    Executing on Centerra’s Strategic Plan Focused on maximizing the value for each asset in the portfolio ÖKSÜT MINE MOUNT MILLIGAN US MOLY Generated over $780 million of Since the September 2025 PFS, Restart of Thompson Creek free cash flow(1) since restarting delivered three consecutive quarters mine

  8. Slide 8: Future Growth in Gold

    Future Growth in Gold Advancing a pipeline of organic gold growth opportunities in North America, which can be self-funded from existing liquidity and cash flow from operations GOLDFIELD PROJECT KEMESS PROJECT EXPLORATION Attractive economics with low A strategic opportunity to build a Brownfield ex

  9. Slide 9: Gold Production

    Conceptual Production Growth and Initial Capex Profile(1) Centerra has an organic growth pipeline in gold and copper with a focus in Canada and US, which is expected to be self-funded from existing liquidity and future cash flow from operations 2026-2029 2030’s 2040’s Mount Exploration Milligan Pote

  10. Slide 10: Self-Funded Organic Growth and Shareholder Returns

    Self-Funded Organic Growth and Shareholder Returns Centerra can fund organic growth LIQUIDITY(1) initiatives and $451M Cash and Cash Equivalents shareholder $600M Credit Facility (undrawn) returns from existing Steady Cash Flow From Operations liquidity SHAREHOLDER ORGANIC GROWTH EQUITY RETURNS OPPO

  11. Slide 11: Upcoming Value Drivers

    Upcoming Value Drivers 2026: Focus on execution at Mount Milligan to MOUNT support stronger near-term operational performance MILLIGAN 2028: Process plant expected to increase throughput MINE by 10% and improve recoveries by ~1% 2026: Ongoing exploration and advance KEMESS technical study work PROJE

  12. Slide 12: 2026 Exploration Strategy

    2026 Exploration Strategy Investing in exploration for future growth $20-25M $20-25M Brownfields Exploration Greenfield and Generative Exploration Programs Mount Milligan (British Columbia) Canada • Drilling to upgrade the inferred resources between • British Columbia – JV projects QCM, Cauldron, Go

  13. Slide 13: Equity Investments

    Equity Investments Build a portfolio of equity investments to complement internal exploration programs THESIS GOLD AND SILVER INC. (TSX-V: TAU) ADDITIONAL STRATEGIC Additional Strategic EQUITY INVESTMENTS Equity Investments Equity investment for 9.9% of the outstanding shares(1) Company Ticker Explo

  14. Slide 14: Sustainability Highlights

    Sustainability Highlights Our Vision is to build a team-based culture of excellence that responsibly delivers sustainable value and growth ENVIRONMENTAL SOCIAL GOVERNANCE 0.37 tCO2e/ oz AuEq emissions intensity Local procurement spending increased 5 years of successful independent assurance produced

  15. Slide 15: Asset Portfolio

    centerraGOLD &® @ oa.

  16. Slide 16: Self-Funded Long-Term Gold Growth in North America

    Self-Funded Long-Term Gold Growth in North America Near-Term Free Cash Flow From Longer-Term Growth in Gold From Strategic Minerals Exposure From Producing Assets Development Projects US Moly BC, Canada BC, Canada Idaho, USA Mount Milligan Kemess Thompson Creek Mine life extended to 2045 Pre Feasibi

  17. Slide 17: Mount Milligan Mine | BC, Canada

    Mount Milligan Mine | BC, Canada ASSET DETAILS Central British Columbia, Canada 100% owned 2045 Conventional open pit copper and gold mine; 60ktpd copper flotation plant 35% gold stream, and MINE LIFE Commercial production achieved in February 2014 155km NW of Prince George (Reserves only) 18.75% co

  18. Slide 18: Mount Milligan Life of Mine Extension

    Mount Milligan Life of Mine Extension PFS extends mine life at Mount Milligan by 10 years to 2045, delivering growth with a fully funded, disciplined $186 million growth capital plan PREFEASIBILITY STUDY (“PFS”) HIGHLIGHTS POTENTIAL FUTURE MINE LIFE EXTENSIONS LOM extension by 10 years, to 2045, sup

  19. Slide 19: Gold and Copper Production

    Mount Milligan PFS Summary(1) PFS LOM extension to 2045 is supported by an optimized mine plan, with a low growth capital investment PRODUCTION PROFILE NON-SUSTAINING CAPITAL EXPENDITURES(2) Average annual production from 2026-2042, of approximately 150K Non-Sustaining Capital(2) Breakdown Total ($M

  20. Slide 20: 2026 Exploration at Mount Milligan

    2026 Exploration at Mount Milligan Exploration drilling program aimed at expanding the mineral resource base MOUNT MILLIGAN EXPLORATION PROGRAM Centerra plans to invest $8 – $11 million in exploration at Mount Milligan in 2026. 20% of Centerra’s total 2026 exploration expenditures have been allocate

  21. Slide 21: Mount Milligan Mineralization Cross Section

    Mount Milligan Mineralization Cross Section Actively studying Mineralization the longer-term remains open to thepotential at Mount west of the Milligan current to unlock resource pit additional value beyond 2035 21

  22. Slide 22: Öksüt Mine | Türkiye

    Öksüt Mine | Türkiye ASSET DETAILS Kayseri Province, 100% owned 2029 Open pit heap leach gold mine operation Türkiye Sliding scale NSR MINE LIFE Commercial production achieved in May 2020 295km SE of Ankara royalty to Turkish (Reserves only) Government 2025 OPERATIONAL PERFORMANCE Gold production: 1

  23. Slide 23: Kemess Project | BC, Canada

    Kemess Project | BC, Canada PROJECT DETAILS North Central British 100% owned 15 Year PEA estimates an initial 15-year mine life with annual production of 171k oz of gold Columbia, Canada 100% silver royalty INITIAL MINE LIFE and 61M lbs of copper, at an AISC on a by-product basis(5) of $971/oz 430km

  24. Slide 24: Gold and Copper Production

    Kemess Preliminary Economic Assessment Summary(1) Kemess PEA shows robust economics, including $1.1B after-tax NPV5% and 16% IRR based on $3,000/oz Au and $4.50/lb Cu price(1); At higher commodity prices(3) the after-tax NPV5% increases to $2.8B KEMESS EXPANDED MINERAL RESOURCE STRONG PROJECT ECONOM

  25. Slide 25: Kemess Capital Investment

    Kemess Capital Investment Kemess has a lower execution risk resulting from existing infrastructure and a staged capital investment Site Infrastructure STAGED CAPITAL INVESTMENT AT KEMESS Kemess’s capital profile is structured to reflect the project’s development sequence, with $771M in initial non-s

  26. Slide 26: Kemess Operating Strategy

    Kemess Operating Strategy The Kemess PEA utilizes an integrated open pit and underground mining strategy, with ore from Kemess Main being conveyed to the infrastructure at Kemess South KEMESS INTEGRATED MINING STRATEGY PAG Waste Rock Streamlined project execution through integrated open pit and unde

  27. Slide 27: Kemess Mineralization Cross Section

    Kemess Mineralization Cross Section The Kemess property benefits from significant exploration upside potential in the deep Kemess Offset zone and along the Kemess East trend 27

  28. Slide 28: Goldfield Project | Nevada, USA

    Goldfield Project | Nevada, USA PROJECT DETAILS Esmeralda County, 100% 7 Year Life of mine is expected to be ~7 years with an average annual gold Nevada Owned(2) INITIAL MINE LIFE production of 100koz for the peak years between 2029-2032, at an AISC(1) of 30km south of Tonopah (Reserves only) $1,392

  29. Slide 29: Goldfield Project Summary

    Goldfield Project Summary Proceeding with project development, which is expected to yield $245M after-tax NPV5% and 30% IRR based on $2,500/oz Au price(1,4); At higher gold prices(1,5) the after-tax NPV5% increases to $794M GOLDFIELD PROJECT DETAILS(4) ATTRACTIVE ECONOMICS(5) Near-Term Gold Producti

  30. Slide 30: Goldfield Project Infrastructure

    Goldfield Project Infrastructure Major construction is expected to advance in 2027, with approximately 85% of the initial capital forecast to be evenly weighted across 2027 and 2028. First production is expected by the end of 2028 Open Pits N McMahon Ridge Pit Waste Rock Dump GOLDFIELD PROPERTY Four

  31. Slide 31: Molybdenum Business Unit

    Molybdenum Business Unit US Moly ENDAKO THOMPSON CREEK MINE MINE THOMPSON CREEK LANGELOTH Located in Idaho, among the largest open-pit primary moly mines in the world MINE METALLURGICAL FACILITY 75% Has an existing open pit, on-site mill, established site facilities and equipment fleet 100% 100% own

  32. Slide 32: US Moly Operations Strategy

    US Moly Operations Strategy Unlock significant value through the restart of Thompson Creek Mine and a ramp-up of production at Langeloth. Combined value of $472M after-tax NPV8% and 22% IRR based on $20/lb Mo price(5) ROBUST INTEGRATED ECONOMICS(2,5) THOMPSON CREEK FEASIBILITY STUDY(5) Strong econom

  33. Slide 33: Thompson Creek Restart Highlights

    Thompson Creek Restart Highlights Thompson Creek restart activities on track for first production in mid-2027 THOMPSON CREEK RESTART HIGHLIGHTS Q2 Highlights Q2 2026 non-sustaining capital expenditures(1): $51.6 million By the end of Q2 2026, 52% of the infrastructure refurbishment is complete Achie

  34. Slide 34: Metallurgical Facilities Market

    Metallurgical Facilities Market Langeloth is a strategic asset given its proximity to North American steel manufacturers LANGELOTH IS A UNIQUE AND STRATEGIC ASSET Given proximity to North American steel manufacturers, the business is important for the area Part of “made in America” story for re-onsh

  35. Slide 35: Langeloth Value Drivers: Capacity Utilization

    Langeloth Value Drivers: Capacity Utilization Actively studying Demonstrated the to ability longer-term potential at Mount increase molybdenum Milligan roasting to unlock capacity additional value in a straightforward beyond 2035 manner HISTORICAL PRODUCTION VOLUME PATH TO INCREASING CAPACITY AT LAN

  36. Slide 36: Appendix

    APPENDIX

  37. Slide 37: Capital Markets Information

    Capital Markets Information SHARE PRICE PERFORMANCE 250% 200% 150% 100% 50% 0% -50% Jan-2025 Feb-2025 Mar-2025 Apr-2025 May-2025 Jun-2025 Jul-2025 Aug-2025 Sep-2025 Oct-2025 Nov-2025 Dec-2025 Jan-2026 Feb-2026 Mar-2026 Apr-2026 May-2026 Jun-2026 Jul-2026 Centerra Peer Average S&P/TSX Global Gold Sou

  38. Slide 38: Leadership Team

    Leadership Team Paul Tomory Kelly Strong Ryan Snyder President and Chief Executive Vice President Executive Vice President Executive Officer and Chief Operating Officer and Chief Financial Officer Joined Centerra in May 2023. Joined Centerra in August 2026. Joined Centerra in 2022 as Vice President,

  39. Slide 39: Board of Directors

    Board of Directors Paul N. Wright Karen David-Green Wendy Kei John Kitlen Chair and Director Director Director Director Has been a director of Centerra since May 2020. Has been a director since May 2025. Has been a director since May 2022. Has been a director since May 2026. Appointed Chair in Janua

  40. Slide 40: Highlights of Additional Royal Gold Agreement

    Highlights of Additional Royal Gold Agreement(1) Additional agreement with Royal Gold unlocks incremental mineral reserves & resources at Mount Milligan TRANSACTION HIGHLIGHTS Gold and Copper Payments Received from Royal Gold(3) Centerra will receive increased cash payments for Mount Gold Copper Mil

  41. Slide 41: Molybdenum: What Is It, How Is It Used?

    Molybdenum: What Is It, How Is It Used? Molybdenum (Mo) is mainly a by-product of copper mining, with primary molybdenum mines like Centerra’s Thompson Creek mine yielding high-grade concentrate Concentrates are blended to meet metallurgical or chemical grade specifications and roasted Can be furthe

  42. Slide 42: Molybdenum Demand: Steadily Growing

    Molybdenum Demand: Steadily Growing Molybdenum is a strategic mineral with critical mineral status in several countries 2% ~757 per year Mlbs Forecasted steady demand growth, on Global demand for new par with historical demand growth molybdenum expected by from 1995-2023(1) 2030(1,2) The World Bank

  43. Slide 43: Molybdenum Supply: Potential Challenges Ahead

    Molybdenum Supply: Potential Challenges Ahead Thompson Creek is a unique opportunity for Centerra to have a captive source of high-quality feed, which is becoming increasingly scarce and competitive to source Molybdenum by-product production from existing copper mines, particularly in South Molybden

  44. Slide 44: Molybdenum Price: Strong Fundamentals

    Molybdenum Price: Strong Fundamentals Persistent forecasted supply deficit(1) and sustained robust demand support a strong commodity price in the near-term Average Mo Prices ($/lb) HISTORICAL MOLYBDENUM PRICE(2) 2026 YTD: 28.18 40 2-YR AVG: 23.73 3-YR AVG: 22.84 35 30 25 20 Thompson Creek Feasibilit

  45. Slide 45: Langeloth Commercial Model

    Langeloth Commercial Model Langeloth dampens the volatility in the molybdenum market and remains profitable at lower Mo prices REVIEW OF COMMERCIAL MODEL AT LANGELOTH Langeloth pricing mechanism ILLUSTRATIVE Source concentrate (third-party offtake plus Thompson Creek Spread supply), process concentr

  46. Slide 46: 2026 Production & Cost Guidance

    2026 Production & Cost Guidance 2026 Production Guidance (Koz) Q2 2026 YTD 2026 Guidance Consolidated Gold Production 139 260 – 290 Mount Milligan(1,2,3) 68 140 – 155 Öksüt 71 120 – 135 Total Copper Production(1,2,3) (Mlbs) 27 50 – 60 2026 Cost Guidance(4) ($/oz) Q2 2026 YTD 2026 Guidance Consolidat

  47. Slide 47: 2026 Capital Expenditures and Other Guidance

    2026 Capital Expenditures and Other Guidance 2026 Capital Expenditures Guidance ($M) Q2 2026 YTD 2026 Guidance Consolidated Additions to PP&E(2) 235.2 413 – 490 Mount Milligan 81.4 130 – 150 Öksüt 11.6 10 – 20 Goldfield 18.7 60 – 70 Kemess 4.4 5 – 10 Thompson Creek 118.1 205 – 235 Consolidated Susta

  48. Slide 48: 2026 Exploration and Other Guidance

    2026 Exploration and Other Guidance Global Exploration Costs ($M) Q2 2026 YTD 2026 Guidance Total Exploration Costs(2) 15.1 40 – 50 Brownfield Exploration(2) 5.7 20 – 25 Greenfield and Generative Exploration 9.4 20 – 25 Other Costs ($M) Q2 2026 YTD 2026 Guidance Kemess Project Care & Maintenance 7.2

  49. Slide 49: Consolidated Financial & Operating Highlights

    Consolidated Financial & Operating Highlights Financial Highlights ($M, except as noted) Q2 2026 YTD 2026 2025 2024 Revenue 442.7 927.4 1,384.6 1,214.5 Production costs 251.4 505.6 808.5 710.3 Gold production costs ($/oz) 1,456 1,553 1,297 913 All-in sustaining costs on a by-product basis(1) ($/oz)

  50. Slide 50: Mount Milligan Financial & Operating Highlights

    Mount Milligan Financial & Operating Highlights Financial Highlights ($M, except as noted) Q2 2026 YTD 2026 2025 2024 Gold revenue 106.6 228.9 367.0 299.8 Total revenue 182.0 377.9 581.5 495.8 Production costs 86.6 180.6 300.8 306.3 Gold production costs ($/oz) 1,314 1,522 1,388 1,105 All-in sustain

  51. Slide 51: Öksüt Financial & Operating Highlights

    Öksüt Financial & Operating Highlights Financial Highlights ($M, except as noted) Q2 2026 YTD 2026 2025 2024 Revenue 141.3 325.0 445.0 465.7 Production costs(1) 53.0 112.4 156.5 148.0 Gold production costs ($/oz) 1,628 1,584 1,199 748 All-in sustaining costs on a by-product basis(2) ($/oz) 1,952 1,7

  52. Slide 52: US Moly Financial & Operating Highlights

    US Moly Financial & Operating Highlights US Moly Financial Highlights ($M, except as noted) Q2 2026 YTD 2026 2025 2024 Total revenue 119.4 224.5 358.0 253.0 Production costs 111.9 212.6 351.3 256.0 Earnings (loss) from mine operations 6.3 9.6 2.2 (6.4) Earnings (loss) from operations 0.5 (3.4) (2.9)

  53. Slide 53: Operating Cost Breakdown (by Operating Site)

    Operating Cost Breakdown (by Operating Site) Mount Milligan Q2 2026 YTD 2026 2025 2024 Mining cost per tonne ($/t)(1) 3.43 3.09 2.78 2.68 Processing cost per tonne ($/t)(1) 5.18 6.36 6.08 5.33 Site G&A cost per tonne ($/t)(1) 2.94 2.96 2.79 2.45 On site cost per tonne ($/t)(1) 15.58 16.53 15.17 13.5

  54. Slide 54: 2026 Sensitivities and Material Assumptions

    2026 Sensitivities and Material Assumptions 2026 SENSITIVITIES Impact on Impact on ($M) ($/oz) Production Capital Cash AISC on a by-product Revenues Costs & Taxes Costs Flows basis per ounce(4) Gold price(1) $250/oz 4.0 – 6.5 — 20.5 – 24.0 15.0 – 19.5 15 – 33 Copper price(1) 10% 0.5 – 1.0 — 11.0 – 1

  55. Slide 55: Mineral Reserves and Resources – Gold

    Mineral Reserves and Resources – Gold(1) (as of December 31, 2025) Proven Gold Reserves Probable Gold Reserves Total Proven & Probable Gold Reserves Property Grade Contained Gold Grade Contained Grade Contained Gold Tonnes (kt) Tonnes (kt) Tonnes (kt) (g/t) (koz) (g/t) Gold (koz) (g/t) (koz) Mount M

  56. Slide 56: Mineral Reserves & Resources – Copper

    Mineral Reserves & Resources – Copper(1) (as of December 31, 2025) Proven Copper Reserves Probable Copper Reserves Total Proven & Probable Copper Reserves Property Tonnes Copper Grade Contained Tonnes Copper Grade Contained Tonnes Copper Grade Contained (kt) (%) Copper (Mlbs) (kt) (%) Copper (Mlbs)

  57. Slide 57: Mineral Reserves & Resources – Molybdenum

    Mineral Reserves & Resources – Molybdenum(1) (as of December 31, 2025) Proven & Probable Molybdenum Mineral Reserves Proven Reserves(2) Probable Reserves(2) Total Proven & Probable Reserves Property Tonnes Moly Grade Contained Tonnes Moly Grade Contained Tonnes Moly Grade Contained (kt) (%) Moly (Ml

  58. Slide 58: Mineral Reserves & Resources Additional Footnotes

    Mineral Reserves & Resources Additional Footnotes General Conversion factors used in the mineral resource and reserve estimates: 31.1035 grams per troy ounce; 2204.62 lbs per metric tonne; 0.9072 metric tonnes per short ton. Unless otherwise noted, an exchange rate of 1USD:1.33CAD was used for estim

  59. Slide 59: Mineral Reserves & Resources Additional Footnotes

    Mineral Reserves & Resources Additional Footnotes Goldfield The following formula was used to calculate cut-off grade for each mineralized zone: [Processing cost + G&A cost] / [Recovery * (Gold Price * Payability Factor * (1- Royalty%) – Selling Cost)] where G&A cost is $0.55/t, payability factor is

  60. Slide 60: Thank You!

    TSX CG NYSE CGAU THANK YOU! 1 University Avenue, Suite 1800 phone 416-204-1953 Toronto, Ontario M5J 2P1 fax 416-204-1954 email investor@centerragold.com