Ssr Mining Inc. · NASDAQ:SSRM
Ssr Mining — Corporate Update (October 2014)
64 slides from Ssr Mining's corporate update, Oct 15, 2014
Slide 1: Marigold Analyst Tour
MARIGOLD ANALYST TOUR October 15, 2014
Slide 2: Cautionary Notes
Cautionary Notes Cautionary Note Regarding Forward-Looking Statements This presentation contains “forward-looking statements” within the meaning of the U.S. Private Securities Litigation Reform Act of 1995 and “forward-looking information” within the meaning of Canadian securities laws (collectively
Slide 3: Today's Schedule
Today’s Schedule Introduction and Safety Induction 9:30am Management Presentation 9:45am Lunch 11:45am Marigold Analyst Tour 12:45pm Depart Marigold Mine 4:00pm SSRI:NASDAQ | SSO:TSX 3
Slide 4: Safety Induction
Safety Induction 1. Safety Share – “Situational Awareness” 2. Building Emergency Muster Locations 3. PPE Requirements 4. Basic Site Safety Location Requirements SSRI:NASDAQ | SSO:TSX 4
Slide 5: Agenda
Agenda Introduction and History/Overview Environment, Safety and Health Geology Mineral Resources and Reserves Mine Operations Processing Financial Summary Mine Optimization Opportunities and Next Steps SSRI:NASDAQ | SSO:TSX 5
Slide 6: Transformational Acquisition
Transformational Acquisition 1. Geopolitically diversified our portfolio Nevada is a long established premier mining location 2. Transaction value for the price paid NPV of $419M well exceeds the price paid of $268M 3. Robust Life of Mine Plan Positioned for success through the cycle Focused o
Slide 7: History and Overview
History and Overview
Slide 8: Mine Overview
Mine Overview Open pit, run-of-mine heap leach operation Conventional truck and shovel equipment Gold doré Continuous operation since 1988 Twin Creeks Goldstrike Maverick MARIGOLD Springs Phoenix Strong safety and environmental practices Cortez Carlin Trend Excellent infrastructure Battl
Slide 9: History
History 1988: Commenced Production under Rayrock/Homestake/Placer Dome 1999: Transitioned to 100% ROM heap leach processing 1999: Glamis acquired Rayrock Mines 2001: Barrick acquired 33% ownership through Homestake Mining 2005: Mine Expanded 2006: Goldcorp acquired 66% ownership through
Slide 10: Marigold Operations Overview
Marigold Operations Overview Plant and Administrative Facilities N Leach Pads Terry Pit Mackay Pit Target Pit Basalt – Antler Backfilled Pit 1 km SSRI:NASDAQ | SSO:TSX 10
Slide 11: Environment, Safety and Health
Environment, Safety and Health
Slide 12: Mine Safety Performance
Mine Safety Performance 2014 YTD All Injury Frequency Rate (“AIFR”) of 2.48 is consistent with recent years-seven reportable injuries in 2014 Since SSRI took ownership the AIFR has reduced to 1.56 2014 YTD contractor AIFR is 0 Returning to World Class Safe Production SSRI:NASDAQ | SSO:TSX 12
Slide 13: Achieving a Safe Workplace
Achieving AchievingaaSafe SafeWorkforce Workplace Face Time with the Workforce Safe for Life Behavior Reviews Formal Task Observations Line Out Meetings Safety Meetings Workplace Inspections Field Level Risk Assessment Effectiveness Reviews Mock Regulatory Inspection Program Educat
Slide 14: Environmental Best Practices
Environmental Best Practices First operating mine to receive the International Cyanide Management Code certification One of the first to install mercury pollution control devices Partnered with the Nevada Division of Wildlife Annual environmental awareness training Highly regarded by regul
Slide 15: Mine Reclamation and Closure
Mine Reclamation and Closure Where applicable concurrent reclamation is performed throughout the mine life, reducing mine closure costs Permanent mine closure plan will be submitted, per State & BLM requirements, within 2 years of final closure Case study- Marigold Tailings Impoundment: Discon
Slide 16: Community Relations
Community Relations Education support through various scholarships Partnership with the Safe Haven Rescue Zoo Initiated a sustainable investment board, Battle Mountain Advisory Committee Community wellness and emergency preparedness support through donations and participation in drills and c
Slide 17: Awards & Accreditations
Awards & Accreditations International Cyanide Code: First mine worldwide to receive certification Nevada Mining Association: Safety Awards granted to 15 employees since 2011 Employer Support of the Guard and Reserve: Supervisor and Employer awards American Red Cross: Several Real Heroes awar
Slide 18: Permitting Strategy and Results
Permitting Strategy and Results • Pit Expansions Minor • Leach pad & Waste expansions • Dump Expansions Expansion Modification • Infrastructure Improvements • Dewatering/Pit Lake EIS • Infrastructure Expansion Bonding Midyear approval in 2018 progress Continuous focus on permitting SSRI:NASDAQ | SSO
Slide 19: Environmental Impact Statement Timeline
Environmental Impact Statement Timeline Public Scoping Period Public Comment Public Comment & Meetings Period & Meetings Period Appeal Period Baseline Studies Q1 2016 Q1 2017 Q4 2017 Ongoing Q2 2018 - 2015 Q1-Q4 Q1-Q3 Q2 2015 Q1 2018 2016 2017 Submit Plan of Draft EIS Final EIS Record of Operations
Slide 20: Geology
Geology
Slide 21: Major Gold Belt in Northern Nevada
Major Gold Belt in Northern Nevada Idaho Star Lake Concept Twin Midas Creeks Turquoise Rabbit Suture Pinson Ridge Trend Alligator Ridge Sandman Preble Iron Point Utah Hollister Lone Tree Sierra Tact- Buff-T Marigold Convers Willow e Trenton Mule Creek Canyon Canyon Goldbanks Phoenix Fire Creek Kenne
Slide 22: Battle Mountain Mining District Geology
Battle Mountain Mining District Geology SSRI:NASDAQ | SSO:TSX 22
Slide 23: Marigold Mineralization of Sedimentary Rocks
Marigold Mineralization of Sedimentary Rocks Terry Zone Complex (looking north) Fault zone Alteration zone Mineralized zone N W SSRI:NASDAQ | SSO:TSX 23
Slide 24: Resource Areas and Exploration Plan
Resource Areas and Exploration Plan 5 North Discover, Define & Develop Hercules GRADE THICKNESS High 70 g-m Medium 5-70 g-m Low <5 g-m GEOLOGY Quaternary / Tertiary Alluvium Mackay Tertiary Tuff Permian / Mississippian Havallah Permian / Pennsylvanian Antler Ordovician Valmy Target II N MORE REFEREN
Slide 25: Strategic Development of Resources to Reserves
Strategic Development of Resources to Reserves Cross- Section showing resources that could be converted to future reserves N One Mile SSRI:NASDAQ | SSO:TSX 25
Slide 26: Discover & Define Resource, Develop to Reserve
Discover & Define Resource, Develop to Reserve Mackay Pit Red Dot Resource Illustrative potential pit shell Marigold Cross-Section W (looking north) E SSRI:NASDAQ | SSO:TSX 26
Slide 27: Marigold 2014 Drilling Results
Marigold 2014 Drilling Results SSRI:NASDAQ SSRI:NDAQ ||SSO: SSO:TSX TSX 27
Slide 28: Sulfide Potential Below Oxide Resources
Sulfide Potential Below Oxide Resources 2 miles 5N HERCULES 6 miles MACKAY Valmy pits ANTLER AND BASALT N Gold Mineralization: 6 miles by 2 miles SSRI:NASDAQ | SSO:TSX 28
Slide 29: Conceptual Cross-Section With Local Analogs
Conceptual Cross-Section With Local Analogs 35 miles MPh PPa Ov Getchell/TRJV Twin Creeks Across valley Across valley Oxide 4.7M ozs 11.1M ozs mineralization Un-Ox sulfide mineralization COc Twin Creeks Comus Fm. COc 6.1M ozs Au Marigold’s unknown Turquoise Ridge Comus Fm. COc gold mineralization 22
Slide 30: Exploration Potential
Exploration Potential Oxides Resource replacement drilling within and directly adjacent to current pit limits Resource upgrade drilling of Inferred to Indicated Step-out drill programs focusing on high grade, near surface, following mineralization along known trends, laterally and then to de
Slide 31: Mineral Resources and Reserves
Mineral Resources and Reserves
Slide 32: Key Assumptions for Resources and Reserves
Key Assumptions for Resources and Reserves Mineral Resources (as at September 30, 2014) Estimated by ordinary kriging Constrained by an optimized pit at a gold price of US$1,500 per ounce Indicated Mineral Resource is inclusive of Mineral Reserve Mineral Reserves (as at September 30, 2014) M
Slide 33: Mineral Resources and Reserves Estimate
Mineral Resources and Reserves Estimate Probable 129.7 Mt grading 0.51 g/t gold Mineral Reserves Contained gold of 2.1 Moz Indicated 243.7 Mt grading 0.51 g/t gold Mineral Resources Contained gold of 4.0 Moz Inferred 13.4 Mt grading 0.46 g/t gold Mineral Resources Contained gold of 0.2 M
Slide 34: Mackay: Reserves and Resources by Location
Mackay: Reserves and Resources by Location 2014 Reserve LOM Pit Red Dot Area Resource Grade Shell Red Dot Area could be converted to reserve at a favorable price SSRI:NASDAQ | SSO:TSX 34
Slide 35: Mine Operations
Mine Operations
Slide 36: Mining Position: EOY 2014 and EOY 2019
Mining Position: EOY 2014 and EOY 2019 2014 2019 5North 1 Pit 5North 2 Pit Waste Dump Hercules 1 Pit Leach Pad Leach Pad Waste Dump Lease Boundary Mackay Pits Mackay Pits Waste Dump WEDG WEDG Waste Dump Waste Dump SSRI:NASDAQ | SSO:TSX 36
Slide 37: Mine Plan Overview
Mine Plan Overview Production Schedule Annual Average Total material moved: 71.8 Mt Ore to leach pad: 15.1 Mt Strip ratio: 3.7 : 1 Gold recovery: 74% Gold grade to leach pad: 0.51 g/t SSRI:NASDAQ | SSO:TSX 37
Slide 38: Operating Statistics: Material Mined
Operating Statistics: Material Mined 100 5.0 80 4.0 Million Tonnes Waste:Ore 60 3.0 64 59 59 62 60 40 53 53 47 2.0 20 1.0 14 13 15 15 15 15 15 15 15 5 0 0.0 2015 2016 2017 2018 2019 2020 2021 2022 2023 Waste tonnes Ore tonnes Strip Rato Strip ratio declines over time SSRI:NASDAQ | SSO:TSX 38
Slide 39: Phase Design Through the Years
Phase Design Through the Years 100 5.0 80 4.0 Million Tonnes 60 Waste:Ore 3.0 40 2.0 20 1.0 0 0.0 2015 2016 2017 2018 2019 2020 2021 2022 2023 M=Mackay M6b M9 5N2 M7 5N1 5N= 5 North H1 M8 M5 M2 M4 M3b M3a M6a M1 Strip SR Ratio H=Hercules SSRI:NASDAQ | SSO:TSX 39
Slide 40: Operating Statistics: Gold Production Schedule
Operating Statistics: Gold Production Schedule 250 100% 225 209 200 172 173 176 166 183 75% Gold Produced (Koz) Gold Recoveries (%) 159 150 50% 100 70 25% 50 0 0% 2015 2016 2017 2018 2019 2020 2021 2022 2023 Stable production base SSRI:NASDAQ | SSO:TSX 40
Slide 41: Operating Statistics: 2014 YTD Tonnes Moved
Operating Statistics: 2014 YTD Tonnes Moved 210 208 205 204 203 200 199 190 ‘000 Tonnes/Day 187 186 170 161 150 Jan Feb Mar Apr May Jun Jul Aug Sep 2014 29% increase YTD SSRI:NASDAQ | SSO:TSX 41
Slide 42: Mine Fleet
Mine Fleet Hauling 6 x Komatsu 930 12 x Hitachi EH5000 Loading 1 x P&H 4100 2 x Hitachi EX5500 1 x Komatsu WA 1200 Drilling 2 x Atlas Copco PV271 4 x Ingersoll Rand DML SSRI:NASDAQ | SSO:TSX 42
Slide 43: Processing
Processing
Slide 44: Process Flow Sheet
Process Flow Sheet Lean Solution Barren Solution Lime Heap Leach Pad Pregnant Solution Barren Solution Pregnant Solution Barren Ponds Ponds Barren Strip Solution Carbon Adsorption Columns Pregnant Pregnant Carbon Eluant Stripping/Acid Electro-winning Washing/Reactivating E/W Sludge Barren Carbon Slu
Slide 45: Financial Summary
Financial Summary
Slide 46: Capital Cost Summary
Capital Cost Summary Total life of mine sustaining capital requirements Sustaining Capital Costs Total ($M) Mining Equipment $17 Capitalized Equipment Maintenance 74 Processing 24 Administration and Permitting 8 Total $123 Past investment for future benefit Note: Sustaining capital costs excludes
Slide 47: Operating Cost Summary
Operating Cost Summary Operating costs are representative of a large open pit operation $ / tonne 0% LOM Cost / tonne Processed G&A 8% Processing * Mine Operations $7.13 13% Processing 1.33 Mine Operations 79% G&A 0.69 Total $9.16 Mining Operations represent ~80% of costs * Equivalent to $1.50 per
Slide 48: Life of Mine Operating Costs Breakdown
Life of Mine Operating Costs Breakdown Royalties 15% Labour 29% Other Direct Costs 11% Power 3% Maintenance 7% Consumables 20% Fuel 16% *Includes capitalized stripping of $204 million Note: All data includes the period encompassing October 2014 though 2027. Maintenance excludes capitalized maintenan
Slide 49: Operating Cost Summary
Operating Cost Summary $986 $1,000 $28 $74 $ / oz Sold $950 $900 $123 Cash Costs $762 $850 Capitalized Stripping 123 $/oz sold $800 $762 $750 Sustaining Capital 74 $700 Reclamation 28 $650 $600 Cash Capitalized Sustaining Reclamation AISC All-in Sustaining Costs $986 Cost Stripping Capital LOM AISC
Slide 50: Cash Costs and All In Sustaining Costs
Cash Costs and All In Sustaining Costs $1,200 1,157 1,139 1,090 1,099 1,028 $1,000 890 808 793 787 $/oz p sold $800 $600 869 $400 765 755 761 802 766 690 675 692 $200 $0 2015 2016 2017 2018 2019 2020 2021 2022 2023 AISC Cash Costs Competitive cost structure Note: Cash costs and all-in sustaining cos
Slide 51: Average royalty rate of 9.8% over LOM
Average royalty rate of 9.8% over LOM Annual average varies from 9.1-10.0% 5% Royalty Holders: Century Gold 5% 3% Royal Gold Franco-Nevada 10% University of Nevada VEK 10% Sections in blue have no Royalty 10% 5% SSRI:NASDAQ | SSO:TSX 51
Slide 52: Mine Economics
Mine Economics After-tax NPV (5%) = $419M Revenue = $2.2B (at $1,300 per ounce gold price) After-tax Free Cash Flow = $536M After-tax NPV (5%) sensitivity analysis: +10% gold price: $540M (10%) operating costs: $495M SSRI:NASDAQ | SSO:TSX 52
Slide 53: Sensitivity Analysis
Sensitivity Analysis $600 $400 NPV ($M) $200 $0 (10)% Base Case 10% Gold Price Operating Cost Capital Expenditures (10)% 0% 10% Gold Price $297M $419M $540M Operating Cost $495M $419M $342M Sustaining Capex $430M $419M $409M Leverage to rising gold price SSRI:NASDAQ | SSO:TSX 53
Slide 54: Mine Optimization
Mine Optimization
Slide 55: Objectives and Results to Date
Objectives and Results to Date Enhance the key elements of the Improve communication Management Operating System (“MOS”) Enhance effective, timely reporting of Educate front line management results Develop effective visual management Enhance effective close out of action tools items Prot
Slide 56: Drilling and Blasting
Drilling and Blasting Drill Footage per Operating Hour 4100 Tons per Operating Hour 115 7,000 +19% +7% 110 6,500 105 6,000 100 5,500 95 90 5,000 85 4,500 Apr May Jun Jul Aug Sep Jan Feb Mar Apr May Jun Jul Aug Sep 2014 2014 Improved drilling rates and digability SSRI:NASDAQ | SSO:TSX 56
Slide 57: Case Study – P&H 4100
Case Study – P&H 4100 Situation: New equipment New bench height Needs Identified: Space Identify areas/bench height where the shovel can be effective Continue double side loading High quality blasted material Drilling correct level, fragmentation study Sufficient blasted stock in fro
Slide 58: Loading
Loading Rope Shovel Availability Rope Shovel Utilization 100% +38% 90% +19% 90% 80% 80% 70% 70% 60% 60% 50% 50% Q1 2014 Q2 2014 Q3 2014 Q1 2014 Q2 2014 Q3 2014 Tonnes Moved per Day Rope Shovel Cost per Tonne Loaded 210 +13% $0.20 $0.18 190 $0.16 (30)% $0.14 170 $0.12 150 $0.10 * Q1 2014 Q2 2014 Q3 2
Slide 59: Operational Excellence Focus
Operational Excellence Focus Truck constrained – focus on truck efficiency & effectiveness Availability Utilization Investigate Root Cause of Improved Shift Change Time Unintended Results Improved Planning of Materials and Dispatch Network Upgrade People Better Parts & Materials Controls
Slide 60: Opportunities and Next Steps
Opportunities and Next Steps
Slide 61: Marigold Going Forward
Marigold Going Forward Resource delineation and upgrade Operational excellence focused on mining costs and practices Exploration for oxide and sulphide mineralization Focused on delivering results and continued growth SSRI:NASDAQ | SSO:TSX 61
Slide 62: Questions & Answers
Questions & Answers an ae < = SEAS. oe
Slide 63: Mineral Resources: Notes to Table
Mineral Resources: Notes to Table 1. James Carver, Registered SME Member (# 509390), is the Qualified Person for the Mineral Resources estimate. 2. The Mineral Resources estimate has been classified in accordance with Canadian Institute of Mining, Metallurgy and Petroleum (CIM, 2010) definition stan
Slide 64: Mineral Reserves: Notes to Table
Mineral Reserves: Notes to Table 1. Thomas Rice, SME Registered Member (#269380), is the Qualified Person for the Mineral Reserves estimate. 2. Trevor Yeomans, B.Sc. (Hons), ACSM, P. Eng. is the Qualified Person who provided metallurgical parameters that were incorporated in the Mineral Reserves est