Collective Mining Ltd · TSX:CNL

Collective Mining — Investor Presentation (December 2025)

30 slides from Collective Mining's investor presentation, December 2025

  1. Slide 1: A Team With a Proven Track Record Has Made Another Major Discovery in Colombia

    A TEAM WITH A PROVEN TRACK RECORD OF SUCCESS HAS MADE ANOTHER MAJOR DISCOVERY IN COLOMBIA

  2. Slide 2: Disclaimer

    Disclaimer This presentation does not constitute an offering of securities and the information contained herein is subject to the information contained in the Company's continuous disclosure documents. All amounts expressed in Canadian $ unless otherwise stipulated. Forward-looking Statements This p

  3. Slide 3: The Collective Edge

    Track Record of Creating Value The Collective Edge Well trusted, knowledgeable and successful management team in Colombia. Built the largest gold mine in Colombia Highly specialized talent in generating Sold for C$2 billion (in EV) March 2020 grassroot exploration targets has (550% return) resulted

  4. Slide 4: Capital Structure and Analyst Research

    Capital Structure and Analyst Research Analyst Research Coverage Firm: BMO Capital Markets Common Shares Outstanding 92.3M Analyst: Andrew Mikitchook Target price: C$25.00 Stock Options 5.0M Firm: Scotiabank Fully Diluted Shares Outstanding 97.3M Analyst: Ovais Habib Target price: C$25.00 Cash * US$

  5. Slide 5: Board of Directors and Key Management

    Board of Directors Key Management Ned Jalil Ari Sussman, Executive Chairman CEO Former CEO and director of Continental Gold, which was sold to Zijin Former Chief Technical Officer at Kinross Gold with 25+ years Mining for $2 billion. Raised over $1 billion for various mining related leading global g

  6. Slide 6: Colombia: A Well Established Mining Jurisdiction

    Colombia: A Well Established Mining Jurisdiction Cerro Matoso Cerrejón Project Company Commodity Stage Type Cerro Matoso South 32 Ni Production Open-pit El Descanso Cordero Cerrejón Glencore Coal Production Open-pit Buriticá San Antonio El Descanso Drummond Coal Production Open-pit Segovia El Santua

  7. Slide 7: Caldas the most desirable mining jurisdiction in Colombia

    500+ year mining history – Pro-mining area of Colombia Caldas the most desirable mining Industrial based economy with excellent infrastructure jurisdiction in High level of education Colombia Excellent security 7

  8. Slide 8: Operating in an Established Mining Camp Contiguous to a Multi-Million Ounce Mine

    Operating in an Established Mining Camp Located Contiguous to a Multi-Million Ounce Producing Mine Option to earn 100% interest in the Guayabales and San Antonio projects. Located next to Aris Mining’s multi-million-ounce Marmato project which is currently in construction. District never consolidate

  9. Slide 9: Collective Mining

    w COLLECTIVE —— MINTN G ——

  10. Slide 10: Guayabales: Seven Targets to be Drilled in 2025

    Guayabales: Seven Targets to be Drilled in 2025 10 permitted & operating mines in a 3km area within an established mining camp. Multiple discoveries made through reconnaissance drilling since 2022. 120,000+ meters of drilling completed. 10

  11. Slide 11: Apollo System Section: High-Grade Continuity from Surface

    Apollo System Section: High-Grade Continuity from Surface 11

  12. Slide 12: Apollo System Section: High-Grade Continuity from Surface

    Apollo System Section: High-Grade Continuity from Surface 12

  13. Slide 13: Apollo vs Marmato: Two Giants Side by Side

    Apollo vs Marmato: Two Giants Side by Side **Please refer to disclaimer slide #2 for cautionary statement. 13

  14. Slide 14: Deep Drilling Aligns with Potential Future Development

    Deep Drilling Aligns with Potential Future Development 14

  15. Slide 15: Apollo: Large-Scale and Continuing to Expand

    Apollo: Large-Scale and Continuing to Expand Two Deposits at Different Elevations: • Shallow: Bulk tonnage Au-Ag-Cu-W Deposit • Deep: Potentially Reduced Intrusion Related (Au-Ag-Bi-Te) • 106,500 meters (230 holes) completed Expansion drilling underway (5 rigs) • Test high-grade subzones to improve

  16. Slide 16: Trap System: Second Major Discovery Made in 2024

    Trap System: Second Major Discovery Made in 2024 Major drill program to begin in Q1 2026. High-grade sheeted CBM vein system discovery. Modelling points to a potential Cu-Au porphyry system in the north. 1.4 kilometers of strike and open for further expansion. 16

  17. Slide 17: X Target: New Greenfield Silver Discovery

    X Target: New Greenfield Silver Discovery New silver rich discovery announced September 2025 Multi-vein system with two holes covering 500m x 500m x 300m and open everywhere Drill being mobilized with drilling to resume in October, 2025 17

  18. Slide 18: Collective Mining

    Ay} COLLECTIVE — MINENG ——

  19. Slide 19: San Antonio: Ideally Located with Three Rigs Turning

    San Antonio: Ideally Located with Three Rigs Turning 19

  20. Slide 20: San Antonio's Pound Target: Significant Discovery

    San Antonio’s Pound Target: Significant Discovery New Au-Ag-Cu-Mo porphyry & overprinting CBM vein system discovery made in 2025 Approx. 500m of strike and open in all directions Four rigs currently testing Pound 20

  21. Slide 21: Upcoming Catalysts: Up to 100,000 Metre of Drilling in 2026

    Upcoming Catalysts: Up to 100,000 Metre of Drilling in 2026 Guayabales Project Targets (10 Drill Rigs) 1 Apollo: Up to nine rigs turning expanding the high- grade Ramp Zone at depth and infilling upper Apollo 2 Trap: Surface work vectoring to the porphyry source ahead of resumption of drilling in Q1

  22. Slide 22: Sustainability: The Collective Model – Dialogue Platform

    Sustainability: The Collective Model – Dialogue Platform Multi-stakeholder platform focused on energy efficiency, conservation, social, economic and infrastructure development. Key achievements to date: Energy transition as one of the articulating axes of the process. 27/33 signatories to the volunt

  23. Slide 23: Sustainability Best Practices

    Sustainability Best Practices Partnerships to Strengthen 2024 a Year of Success University of Caldas Alliance Our Communities Strategic alliance with the Over US$410,000 directly Jointly implementing academic Coffee Growers Committee of invested in social programs, and research projects focused Cald

  24. Slide 24: Project Portfolio: 100% Owned with Remaining Payments

    Project Portfolio: 100% Owned with Remaining Payments No Third Party Royalties on Either Project Guayabales Project San Antonio Project Title 100% Owned with Residual Title 100% Owned with Residual Payments Outstanding Payments Outstanding Year Amount (US$) Year Amount (US$) 2025 588,889 2026 750,00

  25. Slide 25: Appendix

    Appendix D I S C O V E R I N G C O L O M B I A’ S N E X T W O R L D - C L A S S M I N E R A L D E P O S I T

  26. Slide 26: Guayabales: A Major Complex with Significant Dimensions

    Guayabales: A Major Complex with Significant Dimensions 26

  27. Slide 27: Apollo System: Select Drill Results

    Apollo System: Select Drill Results 27

  28. Slide 28: Apollo: Outcropping in High-Grade Oxide Mineralization

    Apollo: Outcropping in High-Grade Oxide Mineralization High-Grade Au-Ag-Cu-Wo3 System 28

  29. Slide 29: Apollo Model: Remarkable Mineral Endowment (Cross Section)

    Apollo Model: Remarkable Mineral Endowment (Cross Section) 29

  30. Slide 30: Plutus Target: Deep Drilling Planned

    Plutus Target: Deep Drilling Planned Plutus Porphyry Center South: Large coincidental copper & molybdenum in-soil anomaly lying above a magnetic high. Located approximately 1.5 km north of the Marmato mine. North: Breccia discovery (2023) • 136.45m @ 1.31 g/t AuEq Reconnaissance drill program on sou

Collective Mining — Investor Presentation (December 2025) on 6ix