Northern Star Resources Ltd · ASX:NST

Northern Star Resources — Investor Presentation (February 2016)

16 slides from Northern Star Resources's investor presentation, Feb 11, 2016

  1. Slide 1: Proving that low costs pay dividends

    12,178gpt intersection at Paulsens Proving that low costs pay dividends COMPANY PRESENTATION SEPTEMBER 2013

  2. Slide 2: Disclaimer

    Disclaimer Competent Persons Statements • The information in this announcement that relates to Paulsens and Ashburton mineral resource estimations, exploration results, data quality, geological interpretations, potential for eventual economic extraction and estimates of exploration potential, is bas

  3. Slide 3: Team with a track record

    Team with a track record Shares Options Board - Successful record in discovering and developing mines Total 424M 5M BILL BEAMENT Managing Director (Mining Engineer) * As at 16 September 2013 Non Executive Chairman – Independent CHRIS ROWE (Barrister and Solicitor) Non Executive Director – Independen

  4. Slide 4: Northern Star: an abridged history

    Northern Star: an abridged history • Acquired Paulsens Gold Mine in Western Australia for A$40M in July 2010, repaid full acquisition within 7 months • Expanded production rate to 100,000oz/pa • Greatly extended the mine life to +5 years • Purchased Ashburton Project and FMG JV all for just $2M, Now

  5. Slide 5: Company: FY2013 Financial Performance

    Company: FY2013 Financial Performance • Increased Company net profit after-tax by 30% to A$28.3M • EBITDA up 29% to $63.8M and earnings per share up 29% to 6.6¢ • Cash cost down 5% to $680/oz, all-in sustaining cost of $1,016/oz • Capital expenditure of $44M, includes $17.5M on “one-off” expansion i

  6. Slide 6: Paulsens – Performance, Productivity Drive and Cost Cutting

    Paulsens – Performance, Productivity Drive and Cost Cutting • Record yearly performance, 104koz mined, 93koz sold and 89koz recovered • Increased our productivity by 100% in ore tonnes since owner mining, now at 500,000 tonnes per annum • De-risked the mine by installing a new mobile fleet, 118,000t

  7. Slide 7: Voyager 1 & 2: The Paulsens Engine Room

    Voyager 1 & 2: The Paulsens Engine Room • Voyager 1 is the flagship lode at Paulsens • Currently mining 600m below surface. Mineralisation drilled to 950m and remains open at depth • Lode runs at a rich 1,250–2,000 ounces per vertical metre • First stoping ore from the high-grade Voyager 1 Extension

  8. Slide 8: Upper Levels: one man’s waste is another's treasure

    Upper Levels: one man’s waste is another's treasure • Large part of upper mineralised structure not mined by previous owners due to hedging and other factors • Resource stands at 92koz1 @ 10gpt • Upper Levels expected to contribute 10,000-15,000ozpa of high-grade low cost production • Ore developmen

  9. Slide 9: Exploration: writing the next chapter for Northern Star

    Exploration: writing the next chapter for Northern Star • Very little exploration done within 50km radius of the 1Moz Paulsens deposit • Recently expanded our tenement package to 8,500km2 with FMG JV deal on all non- iron ore rights across the Ashburton region • Now hold vast tracks across the Ashbu

  10. Slide 10: Exploration: The Titan Discovery

    Exploration: The Titan Discovery • High-grade Titan discovery made just 100m from Paulsens mine infrastructure • Discovery hole returned 6.9m at 24.7gpt • Titan runs parallel and immediately adjacent to the producing Voyager 1 and 2 lodes • Discovery has strong potential to be a separate mining area

  11. Slide 11: Exploration: the gold may be as green on the other side of the fence

    Exploration: the gold may be as green on the other side of the fence • Paulsens is bounded by a Gabbro unit, traditionally seen as a ‘fence’ around the orebody • Drilling aimed at testing the theory that the mineralisation is deposited on the other side of Gabbro and itself mineralised • Results sup

  12. Slide 12: Exploration: Paulsens Mine Corridor

    Exploration: Paulsens Mine Corridor • Great potential on the highly prospective “Paulsens Mine Corridor” part of the Nanjilgardy Fault, 25-40km long corridor along the axis of Wyloo Dome • All known orebodies and mineralisation, including the Paulsens Gold Mine lie inside this corridor • Great early

  13. Slide 13: FY2014: Production and Cashflow Guidance

    FY2014: Production and Cashflow Guidance • Key FY2014 forecasts @ Gold Price A$1,450/oz: • Total production of 100-115koz • Cash Costs C1 of A$610-690/oz (inclusive of all royalties) • All-in sustaining costs of A$900-1,050/oz (inclusive of all royalties) • Capital expenditure of $28M predominately

  14. Slide 14: Key reasons to invest in Northern Star

    Key reasons to invest in Northern Star • Extremely strong cash generation from high-grade and high-margin ounces • Expect FY14 all-in sustaining cost to be ~$1,000/oz • Growing production to underpin further growth in surplus cash • Sufficient resources to underpin +5 year mine life, with further ex

  15. Slide 15: Proving that low costs pay dividends

    Proving that low costs pay dividends 12,178gpt intersection at Paulsens • Contact Details: • Bill Beament – Managing Director +61 8 6188 2100 • Email info@nsrltd.com • Website www.nsrltd.com

  16. Slide 16: Appendix

    Appendix GOLD MINERAL RESOURCES 1 GOLD MINERAL RESERVES1 As at 30 June 2013 MEASURED (M) INDICATED (I) INFERRED (Inf) TOTAL (MI&Inf) Tonnes Grade Ounces Tonnes Grade Ounces Tonnes Grade Ounces Tonnes Grade Ounces Cut Off As at 31 December 2012 PROVED PROBABLE PROVED and PROBABLE Based on attributabl

Northern Star Resources — Investor Presentation (February 2016) on 6ix