Caravel Minerals Limited · ASX:CVV
Caravel Minerals — Silver Swan Group — Investor Presentation (June 2012)
27 slides from Caravel Minerals's investor presentation, June 2012
Slide 1: Presentation June 2012
PRESENTATION JUNE 2012 1 SV 2012/6
Slide 2: Disclaimer Competent Person Statement
Disclaimer Competent Person Statement The presentation materials (and the contents of the presentation) are for The information in this report that relates to Exploration Results is based information purposes only and do not constitute an offer or invitation to on information compiled by Dr S. Vearn
Slide 3: Projects – Gold and Copper-Zinc-Lead - Spain and Australia
Projects – Gold and Copper-Zinc-Lead - Spain and Australia La Codosera Gold Project, Extremadura Province, Spain Extensive gold mineralisation; historic results include 10m @ 3.6g/t Au & 4.6m @ 2.3g/t Au; 8m @ 3.0g/t Au; 7.1m MADRID @ 2.7g/t Au; 4m @ 5.9g/t Au; 16m @ 1.5g/t Au SWN mapping near c
Slide 4: Corporate Overview
Corporate Overview ASX Code SWN Board of Directors Ordinary Shares1 131.5 million David Archer Executive Chairman Options2 35.0 million Dr. Susan Vearncombe Managing Director Market Cap (at 5.7 cents) $7.5 million Michael Elias Non‐Executive Director Cash3 $3.4 million James Harris Non‐Executive Dir
Slide 5: Management Team
Management Team Mr. David Archer – Executive Chairman Mr Warren Potma ‐ Exploration Manager 30 years’ experience in the Australian and international resources Warren spent five years with Anglogold Australia where he was industry. David founded the major Australian mining companies, involved in all
Slide 6: Spain & the Iberian Pyrite Belt
SPAIN Spain & the Iberian Pyrite Belt • Highly prospective but off radar screens • VMS terrain hosting the worlds largest VMS orebodies e.g. Rio Tinto, Neves Corvo • Major gold producer – estimated up to 65 Moz. New gold deposits coming on-stream e.g. Salave 1.68Moz • Under explored - belts of VMS,
Slide 7: La Codosera Gold Project
La Codosera Gold Project Comparative mineralised systems of the same style, age and setting • Muruntau, Uzbekistan - reserves to 600Mt with annual production of 245,000oz • Juneau, Alaska - 6.6Moz; Haile, Carolina Slate Belt, USA - 4.2Moz resources & reserves • Ridgeway, Carolina Slate Belt, USA - 1
Slide 8: La Codosera Gold Project
La Codosera Gold Project • Located 40km from the provincial capital Badajoz of the Extremadura region of eastern Spain • Five mineral permits (Afra, Buenavista, Breña, Monteviejo and Sierra Lugar) of 18.5km2 • Extensive historic gold workings; 8 gold prospects • Gold associated with stacked saddle r
Slide 9: La Codosera Gold Prospects
La Codosera Gold Prospects \ North-west La Portilla de Los Bastos <= » . » 4381000 La Portilla de Los Bastos, 4540600 ~ Mineralised veining Prospect areas — Faults x San arth ta de Anibal <2 Perla de Anita = See : ro) 00 La Codosera Gold Prospects Monte Viejo — << 4341200 1 Monte Viejo Prospect | “*
Slide 10: Structural Analogue: Stawell-Bendigo, Vic; Telfer, WA
Structural Analogue: Stawell-Bendigo, Vic; Telfer, WA Telfer - >16 Moz Au ; Stawell-Bendigo - >24 Moz Au Telfer Stawell/Bendigo Composite fault structures that range from simply folded bedding-concordant veins through to complex structures involving the interaction of limb thrusts, fold hinges and b
Slide 11: Monteviejo: interpreted cross-section from field mapping and historic drill-core
Monteviejo: interpreted cross-section from current field mapping and historic drill-core observations Analogue: Bendigo-Stawell/ Telfer 8m @ 3.0g/t Au 7m @ 2.7g/t Au 3m @ 1.6g/t Au 10m @ 3.6g/t Au 2m @ 1.6g/t Au 1.0m @ 2.5g/t Au Telfer 1.7m @ 4.2g/t Au MONTEVIEJO IS 1 OF 8 SIMILAR PROSPECTS AT LA CO
Slide 12: Gold Mineralisation & Alteration at La Codosera
Gold Mineralisation & Alteration at La Codosera Extensive area of pyrophyllite alteration – proximal to major gold system! Mineralised drill-core from Monteviejo 20 cm 10 cm 10cm 12
Slide 13: Joint Venture Terms
Joint Venture Terms Joint Venture - Silver Swan Group & Astur Gold Inc: Key terms • Silver Swan will expend on exploration a total of AUS$3.0M for an 80% interest in the project from Astur Gold - $1.5M expenditure to earn 51% within a period of 3.5 years (including $500,000 minimum expenditure commi
Slide 14: Australia
Australia Abbotts Lode Gold Volcanogenic Massive Sulphides Meekatharra Au mining centre Au mining centre Bourkes Find Yagahong Perth Stakewell Au mining centre Quinns Austin 14
Slide 15: Quinns VMS Project
Quinns VMS Project Volcanogenic Massive Sulphides Quinns is located 55km south of Meekatharra covering a tenement area of ~45km2 Meekatharra sphalerite (zinc) Quinns chalcopyrite (copper) Austin 15
Slide 16: Quinns VMS Project
Quinns VMS Project Hunting for Austin Repeats • The Austin volcanogenic massive sulphide (VMS) discovery; JORC Resource defined • Massive sulphides intersected at Flinders, Murchison Wonder and Tasman Prospects • 25km of strike with potential for VMS mineralisation at two stratigraphic levels • Visu
Slide 17: Quinns VMS Project – Austin Deposit
Quinns VMS Project Austin Deposit JORC Mineral Resource Estimate: (ASX Announcement 6 April, 2010) mineralisation 1.48Mt @ 1.02% Cu, 1.39% Zn, 0.24g/t Au, 3.31g/t Ag ~150m to the W Measured (463,428t) Indicated (703,286t) Inferred (317,708t) High grade intercepts • 58m @ 2% Cu from 148m, including:
Slide 18: Quinns VMS Project - contoured normalised metal anomalies
Quinns VMS Project - contoured normalised metal anomalies 2012 Target areas - Tasman, Flinders, Murchison Wonder Tasman Concentric alteration zones, Cu-rich gossan in BIF, increasing gradients in Cu, Zn, Pb, Bi, Mg, and In Flinders Altered felsic volcanic rocks significantly enriched in Cu, Ag, Au,
Slide 19: Flinders VMS Prospect – contoured normalised metal anomalies
Flinders VMS Prospect – contoured normalised metal anomalies Flinders prospect – strong indicators of VMS mineralisation 11FLD001 5m @ 1.2% Zn, (258-263m), 11m @ 0.2%Cu 11FLRCD003 10m @ 4.7% Zn incl. 6m @ 7.0% Zn (247-257m) 11FLRCD004 5m @ 1.3% Zn (333-338m) & 6m @ 0.3% Cu (336-342m) 11FLRCD006 8m @
Slide 20: Tasman & Murchison Wonder VMS Prospect
Tasman & Murchison Wonder VMS Prospect contoured normalised metal anomalies Proposed drill-hole Plan 3 Plan 4 BIF Plan 2 BIF 10TSRC002 6m @ 3%Zn, 12m @ 5.5g/t Ag, 6m @ Plan 1 0.4%Cu A new area to the east of previous drilling is to be tested in the current drilling programme Plan 5 Tasman Drilling o
Slide 21: Yagahong Project
YAGAHONG PROJECT Copper - Gold Mineralisation • Tenements cover160km2, 35km southeast of Meekatharra Abbotts • Large areas under cover that remain untested • Excellent gold results being returned from Gabanintha mine site • New tenements about to be granted covering ‘pressure shadow’ in Yagahong Nor
Slide 22: Yagahong Project
Yagahong Project Copper Hills • Highly prospective for Cu-Au mineralisation • Airborne VTEM has delineated 5 anomalies • Drilling at Lady Alma into off-hole conductor • All NE-trending fault systems to be systematically traversed for Gabanintha Cu-Au style mineralisation Lady Alma drill fences 2m @
Slide 23: Abbotts Gold Project - Underexplored greenstone belt
Abbotts Gold Project - Underexplored greenstone belt • Tenements cover 265km2, 30km NNW of Meekatharra • Prospective for lode-gold mineralisation • Dismembered layered intrusion, felsic & mafic sequences – opens up Cu-Zn mineralisation • Over 600m of strike, gold results include: 4m @ 13.9g/t, 4m @
Slide 24: Abbotts Project
Abbotts Project • Large, contiguous group of tenements within 50km of the major Meekatharra gold mining district and the Doray Minerals recent Andy Well Au discovery (831,000t @ 12.7g/t Au for 331,000oz Au) • Mt Vranizan, 42,000 ounces (non-JORC) • Important early-stage greenfield exploration play f
Slide 25: Abbotts Project
Abbotts Project Metal anomalies Gold • Extensions to the anomalies and infill sampling completed with results pending • Drill hole targets to be defined for drilling in second half 2012 Copper Zinc 25
Slide 26: Summary
Summary • La Codosera shows evidence of extensive gold mineralisation much of which is undrilled • Mapping and sampling of La Codosera will be followed by drill testing mid - late in 2012 • Potential for Quinns Project to evolve into a substantial economic VMS camp • Proof of concept - Austin Deposi
Slide 27: Contact
Contact David Archer Susan Vearncombe Executive Chairman Managing Director T: +44 774 7777 911 T: +61 437 477 470 davida@silverswangroup.com.au susan@silverswangroup.com.au Silver Swan Group Limited Unit 1, 15 Ogilvie Road, Mt Pleasant, WA 6153 T: +61 8 9316 0766 F: +61 8 9316 0799 info@silverswangr
Silver Swan Group — Investor Presentation (June 2012) on 6ix