Pacific Booker Minerals Inc. · TSXV:BKM
Pacific Booker Minerals — Investor Presentation (March 2024)
15 slides from Pacific Booker Minerals's investor presentation, Mar 5, 2024
Slide 1: Prepared by Kent Zehr dated March 5, 2024
Prepared by Kent Zehr dated March 5, 2024 Slide 1 of 15
Slide 2: Introduction, Location, Results Analysis, Current Situation, Conclusion
Introduction………………………… Slide 3 Location……………………… Slides 4 to 7 Results Analysis………..Slides 8 to 12 Current Situation…….Slides 13 & 14 Conclusion………………………… Slide 15 Prepared by Kent Zehr dated March 5, 2024 Slide 2 of 15
Slide 3: Pacific Booker is a Canadian junior mining company
Pacific Booker is a Canadian junior mining company listed on the TSX-V and available for OTC trading. Pacific Booker owns a significant copper / gold property in British Columbia, Canada, referred to as the “Morrison Project”. (see location slides) Pacific Booker is solvent and in good standing with
Slide 4: Slide 4 of 15
Prepared by Kent Zehr dated March 5, 2024 Slide 4 of 15
Slide 5: Slide 5 of 15
Prepared by Kent Zehr dated March 5, 2024 Slide 5 of 15
Slide 6: Morrison Project, Bell and Granisle Copper Mines
Morrison Project Bell Copper Mine Granisle Copper Mine Prepared by Kent Zehr dated March 5, 2024 Slide 6 of 15
Slide 7: Required new powerline and existing heavy haul road
Morrison Project EXISTING HEAVY HAUL ROAD (~30 REQUIRED Km) NEW POWERLINE Bell Copper Mine (~20 Km) Granisle Copper Mine Prepared by Kent Zehr dated March 5, 2024 Slide 7 of 15
Slide 8: Property drilled by Noranda Mines in the 1970s
The property had been drilled by the original owner, Noranda Mines, in the 1970’s. After being acquired by Pacific Booker, a Canadian government regulation change required the property to be re-drilled with a larger core size being obtained. The analysis of these new cores agreed with that of the ol
Slide 9: NI43-101 Feasibility study dated March 2009
From the NI43-101 Feasibility study dated March 2009 The following analysis is based only on the line boxed in RED. Prepared by Kent Zehr dated March 5, 2024 Slide 9 of 15
Slide 10: Copper tonnage, grade, recovery and value
The highlighted row on Slide 9, to a high confidence level, shows the following: For Copper 289,426,000 Tonnes grading an average of 0.33% Copper, which at an 80% recovery will produce 764,084 Tonnes of Copper (289,426,000 X 0.0033 X 0.8 = 764,084) At a recent price of $8,000 USD/Tonne this means th
Slide 11: Gold grade, recovery and value
For Gold 289,426,000 Tonnes grading 0.16g/T at 50% recovery means 23,154,080 grams of Gold produced (289,426,000 T X 0.16g/T X 0.50 = 23,154,080) This may be converted to Troy ounces by (23,154,080 X 14 /454 = 714,002) 714,002 Troy ounces of Gold will be produced which at $2,000 USD per ounce means
Slide 12: Molybdenum and silver also present; low strip ratio
There are material values of Molybdenum and Silver also present but not evaluated in this presentation. Since the orebody is well defined and since the strip ratio is low, much less than 1, the production rate may be planned to provide a strong return over twenty (20) plus years. Prepared by Kent Ze
Slide 13: Environmental Certificate denied twice
In spite of being informed (in writing) that Pacific Booker had met all requirements necessary to receive the Environmental Certificate, (the precedent for all permits to build and work the mine), that certificate has been denied twice now. Pacific Booker took the provincial government to court over
Slide 14: Lake Babine Nation has refused to meet
In spite of previously having signed Memoranda of Understanding, the Lake Babine Nation has refused to meet with Pacific Booker or to begin negotiations. Once having exhausted all possible avenues of reengagement with the Lake Babine Nation without success, Pacific Booker will have no choice but to
Slide 15: Highly speculative investment with an attractive ore body
At the present time Pacific Booker can only be classed as a highly speculative investment. What is not at all speculative is that Pacific Booker has an attractive ore body in a location not requiring any expensive infrastructure to enter production. Prepared by Kent Zehr dated March 5, 2024 Slide 15
Pacific Booker Minerals — Investor Presentation (March 2024) on 6ix