Accelerate Resources Ltd. · ASX:AX8

Accelerate Resources — Euroz Hartleys' Amplify Webinar (March 2024)

15 slides from Accelerate Resources's conference presentation, Mar 27, 2024

  1. Slide 1: Critical Metals Exploration in Western Australia

    Critical Metals Exploration in Western Australia Euroz Hartleys’ Amplify Webinar Exciting Drill-ready Lithium Targets in the West Pilbara 27th March 2024

  2. Slide 2: Important Notice and Disclaimer

    Important Notice and Disclaimer This presentation has been prepared by Accelerate Resources Limited (Accelerate or the Company). It contains general information about the Company’s activities current as at the date of the presentation. The information is provided in summary form and does not purport

  3. Slide 3: Corporate Snapshot

    Corporate Snapshot Advanced Critical Metals and Gold Exploration in Western Australia AX8 610M ASX CODE SHARES ON ISSUE 220M $0.041 SHARES & Share Price PERFORMANCE RIGHTS A$2.9M1 $25M2 CASH MARKET CAP 1 Cash balance as of 31 December 2023 2 Market capitalisation as at 25/03/2024 3 Accelerate Resour

  4. Slide 4: Experienced Board and Management

    Experienced Board and Management Richard Hill Luke Meter Non-Executive Chairman Chief Executive Officer Commercial geologist with 25 years’ experience in the resources Experienced geologists with 18 years of active exploration, industry. He has performed roles as in house lawyer, commercial developm

  5. Slide 5: AX8 Investment Proposition

    AX8 Investment Proposition Why invest in Accelerate Resources now? ✓ Current focus on advancing Karratha Lithium Project – approx. 90sqkm of tenements located nearby to the mining centres of Karratha, Dampier and Roebourne ✓ Prinsep Project is a significant new high-grade lithium discovery located o

  6. Slide 6: Lithium and Manganese use in EV Batteries

    Lithium and Manganese use in EV Batteries Critical metals for the clean energy transition Lithium (Li) • 643,000+ metric tons Supply in 2022. • 2.14 million metric tons1 By 2030 • Global demand is expected to increase seven-fold by 2030. • Driven by rising demand of electric vehicles (EV) with EV ba

  7. Slide 7: Karratha Lithium Project

    Karratha Lithium Project Right address and right commodity Recently Acquired Transformational Acquisition in emerging major West Pilbara lithium province New discovery with high grade spodumene rich lithium at surface Scale Potential with 90km2 of tenure within the rapidly emerging 40km long Karrath

  8. Slide 8: Karratha Lithium Project – New Prinsep Project

    Karratha Lithium Project – New Prinsep Project • New high grade lithium discovery consisting of at least two parallel zone of spodumene- rich pegmatite. • Northen mineralised pegmatite mapped over 1,800m in strike with outcrop widths up to 60m wide over 1,200m. • Southern mineralised pegmatite syste

  9. Slide 9: Karratha Lithium Project – New Prinsep Project

    Karratha Lithium Project – New Prinsep Project • Strong mineralisation continunity confirmed over Prinsep northern pegmatite trend. • Continuous mineralisation defined across whole 45 - 60 metre outcrop width over a strike length of 650m. • Rock Samples collected every 5 metres on north-south traver

  10. Slide 10: Karratha Lithium Project – Prinsep Project

    Karratha Lithium Project – Prinsep Project Prinsep spodumene bearing pegmatite sample under white and UV light – spodumene has an orange fluorescence 10 Accelerate Resources Limited | ASX:AX8 | Euroz Hartleys’ Amplify Webinar

  11. Slide 11: Karratha Lithium Project – Exploration Upside

    Karratha Lithium Project – Exploration Upside • Extensive soil program to commence Interpreted Mineralised Pegmatite Trend Lines at the start of April 2024 across highly prospective corridors within the Prinsep, Mt Sholl East and Roebourne South projects. • In conjunction with mapping, the soils pro

  12. Slide 12: Woodie Woodie North Manganese Project

    Woodie Woodie North Manganese Project High-Grade Mineral Resource with significant exploration upside 70km to Woodie Woodie Manganese Mine 240km to Port Hedland (Bulk Commodity 30km Port) to sealed road 570km2 of prospective geology 10km to Gas Pipeline 12 Accelerate Resources Limited | ASX:AX8 | Eu

  13. Slide 13: Woodie Woodie North Manganese Project

    Woodie Woodie North Manganese Project Maiden Inferred Mineral Resource Estimate 1.2 Mt at 19.1 % Mn (15% Mn cut-off) Near Term Exploration Target 5.3 Mt – 10.7 Mt at 10% - 19% Mn JORC Tonnes Area % Mn % Fe % SiO2 % Al2O3 %P Classification (Mt) Area 1 Inferred 0.04 17.2 14.6 25.8 2.2 0.1 Area 3 Infer

  14. Slide 14: Near-Term Value Catalysts

    Near-Term Value Catalysts ✓ Maiden drilling expected to commence at the Prinsep Lithium Project in early Q2 2024 ✓ Rapid progression from first drill hole to resource and mining license application ✓ Strong pipeline of exploration currently underway across the Karratha Lithium Projects - including s

  15. Slide 15: Contact Us

    Contact Us Luke Meter Chief Executive Officer P: (+61) 08 6248 9663 E: lukem@Ax8.com.au Office Address Ground Floor 1/16 Ord Street, West Perth WA 6005 Website www.ax8.com.au 15 Accelerate Resources Limited | ASX:AX8 | Euroz Hartleys’ Amplify Webinar

Accelerate Resources — Euroz Hartleys' Amplify Webinar (March 2024) on 6ix