Rockhaven Resources Ltd. · TSXV:RK

Rockhaven Resources — Investor Presentation (November 2015)

24 slides from Rockhaven Resources's investor presentation, November 2015

  1. Slide 1: Corporate Presentation November 2015

  2. Slide 2: Forward Looking Statements

    Rockhavet Forward Looking Statements RESOURCES LTD. Certain information regarding the Company contained herein may constitute forward-looking statements within the meaning of applicable securities laws. Forward-looking statements may include estimates, plans, expectations, opinions, forecasts, proje

  3. Slide 3: Focus on Flagship Klaza Project

    Focus on Flagship Klaza Project • Aggressively explored by Rockhaven since 2010 • 100% owned with no NSR’s on resource areas • Road accessible-only 50 km from local community and 8 km from historical Mount Nansen mine • 70,000 m of drilling in 295 holes completed to date 2015 Highlights Include: • I

  4. Slide 4: Track Record of Exploration Success

    Track Record of Exploration Success Management / Directors / Advisors Matt A. Turner, B.Sc. CEO and Director Rob C. Carne, M.Sc., P.Geo. President and Director Ian J. Talbot, B.Sc., LLB. COO Larry Donaldson, CA CFO Glenn R. Yeadon, B.Comm., LLB. Director Bruce A. Youngman, B.Sc. Director Randy C. Tu

  5. Slide 5: Strong Insider Ownership

    Strong Insider Ownership SIGNIFICANT HOLDERS: SHARES % SHARES OUTSTANDING: 105,156,381 STRATEGIC METALS LTD 49,047,500 46% SHARES FULLY DILUTED: 114,696,381 INSIDERS 15,062,334 14% MARKET CAPITALIZATION: $17,000,000 TOCQUEVILLE 6,400,000 6% WORKING CAPITAL: ~$500,000* TOTAL: 70,509,834 66% * Additio

  6. Slide 6: Road-Accessible Location

    — Rockhaven Road-Accessible Location INEZ 3c White Gold Ly ; oP _ Kinross Gold Corp. ; vf y 1p , . d Z oe. Coffee cia a f f Ka Kaminak Gold Corporation ; f “4 L__ 50k _| iy Casino YUKON TERRITORY £ ie y ~__ Freegold Mountain. yy 7 KLAZA j Nx Saf a PROPERTY (LES j A ne LT Highway / road —— Power Line

  7. Slide 7: Developed Area with Excellent Infrastructure

    Developed Area with Excellent Infrastructure 7

  8. Slide 8: Mount Nansen Gold Belt Geology

    Mount Nansen Gold Belt Geology Klaza Deposit Mount Nansen Central Porphyry Complex Thermal engine for mineralization in the belt Mount Nansen Gold- Silver Mine

  9. Slide 9: >70,000 m of Diamond Drilling Since 2010

    >70,000 m of Diamond Drilling Since 2010 • 70,000 m of drilling in 295 holes completed to date • Nine structurally controlled zones with: • Good continuity • Mineralization traced from surface • Open ended strike lengths ranging between 250 and 2,400 m • Only two of the nine main zones are included

  10. Slide 10: Nine Mineralized Zones Identified

    Nine Mineralized Zones Identified • 250 km2 property • Gentle topography • Established multi-use road system 10

  11. Slide 11: Klaza Property Inferred Resource Estimate

    Klaza Property Inferred Resource Estimate Klaza Property - Total Inferred Resource Estimate Summary at Varying Gold Cut-off Grades Au Grade > Cut-off Contained Metal Tonnes > Cut- Cut-off Au Ag Pb Zn Cu off Au (oz) Ag (oz) Pb (lb) Zn (lb) Cu (lb) (t) (g/t) (g/t) (%) (%) (%) (g/t) 1.00 9,060,000 3.54

  12. Slide 12: High-Grade Gold with Excellent Continuity

    High-Grade Gold with Excellent Continuity 12

  13. Slide 13: Significant Silver Associated with Gold

    Significant Silver Associated with Gold 13

  14. Slide 14: BRX Zone: High-Grade West End

    BRX Zone: High-Grade West End Central BRX Zone Western BRX Zone 14

  15. Slide 15: BRX Zone: High-Grade West End

    BRX Zone: High-Grade West End 15

  16. Slide 16: Klaza Zone: Large Mineralizing System

    Klaza Zone: Large Mineralizing System Central Klaza Zone Western Klaza Zone 16

  17. Slide 17: Central Klaza Zone: Multiple Structures

    Central Klaza Zone: Multiple Structures 17

  18. Slide 18: Western BRX Zone: Drill Core Photos

    Western BRX Zone: Drill Core Photos KL-14-137 125.15-126.46 m Sampled interval returned 56.4 g/t gold, 318 g/t silver, 1.59% lead, 4.36% zinc and 0.96% copper over 1.31 m KL-14-143 123.40-125.05 m Sampled interval returned 28.9 g/t gold, 669 g/t silver, 1.88% lead, 2.32% zinc and 0.83% copper over 1

  19. Slide 19: Positive Metallurgical Results

    Positive Metallurgical Results Based on lock-cycle testing, it is projected that: • 95.0% Combined gold recovery with 65% of the recovered gold produced as dore • 90.8% Combined silver recovery to high-value base metal concentrates or dore • High recoveries with the same flowsheet on all tested zone

  20. Slide 20: Studies for Permitting Underway

    Studies for Permitting Underway First Nation and local hiring is a priority for Rockhaven Little Salmon Carmacks First Nation Chief Eric Fairclough with Rockhaven CEO Matt Turner at Exploration Benefits Agreement Signing Ceremony August 2015 Baseline surficial and groundwater studies, wildlife, aqua

  21. Slide 21: Strong Targets Outside Resource Areas

    Strong Targets Outside Resource Areas • Western BYG Zone 11.22 g/t gold over 1.68 m • Central BYG Zone 5.51 g/t gold over 2.95 m • Eastern Klaza Zone 34.10 g/t gold over 1.00 m • Pika Zone 32.52 g/t gold over 3.36 m • AEX Zone 9.03 g/t gold over 1.00 m • Dickson Zone 7.08 g/t gold over 1.00 m 500 m

  22. Slide 22: Magnetic Lows Indicate Additional Targets

    Magnetic Lows Indicate Additional Targets 22

  23. Slide 23: Critical Path to Production

    Critical Path to Production 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 70,000 m Drilled in 295 Holes From 2010-2015 Proposed 30,000 m In-fill Drilling in 2016 Maiden Feasibility Inferred and Mine High-Grade Resource Permit Discovery Estimate PEA Applications Baseline Updated Mine Environ

  24. Slide 24: Summary

    Summary 100% Owned Klaza Project Road Accessible in Established Mining Camp Safe Mining Jurisdiction Aggressive Resource Expansion in 2015 Strong First Nations and Local Support Growing Insider Ownership - Now Over 60% Multiple Zones / Exceptional Strike Lengths Positive Metallurgy On the Critical P

Rockhaven Resources — Investor Presentation (November 2015) on 6ix