  1. Slide 1: Investor Day Briefing Book

    Investor Day Briefing Book October 2018 0

  2. Slide 2: Venue Safety Briefing

    Venue Safety Briefing • Exit locations 1

  3. Slide 3: Disclaimer

    Disclaimer Forward Looking Statements This presentation includes forward looking statements. Forward looking statements can generally be identified by the use of words such as “may”, “will”, “expect”, “intend”, “plan”, “estimate”, “anticipate”, “continue”, “outlook” and “guidance”, or other similar

  4. Slide 4: Agenda

    Agenda Session 1: 9.00 – 10.30am Overview – Sandeep Biswas Cadia – Craig Jetson Telfer – Philip Stephenson Gosowong – Philip Stephenson Wafi-Golpu – Craig Jones Technology & Innovation – Sandeep Biswas Break 10.30 – 11.00am Session 2: 11.00 – 12.35pm Exploration Presentation – Fraser MacCorquodale G

  5. Slide 5: Overview

    Overview Sandeep Biswas Managing Director & CEO 4

  6. Slide 6: The transformation journey so far

    The transformation journey so far Phase 1 – Assess and Plan FY14 • Intensify focus on major Phase 2 – Execute and Realise hazards FY15 – FY16 • Assess the operations and culture • Implement Edge Phase 3 – Sustain and Grow • Launch Edge • Increase the intensity of FY17 – FY18 • Establish the senior t

  7. Slide 7: T2 – The second stage of transformation

    T2 – The second stage of transformation Delivering on the Five Pillars Aspirations CY18-20 By end of CY 2020 • Safety & Sustainability • Zero fatalities and industry leading TRIFR • People • First quartile Organisational Health • Operating Performance • First quartile AISC per ounce • Technology & I

  8. Slide 8: Our Safety Transformation Plan

    Our Safety Transformation Plan Everybody going home safe and healthy every day Zero fatalities and life-changing injuries Build a stronger safety Critical controls for Robust process culture through NewSafe every high-risk task safety management Everybody making safer Verifying that the most Systema

  9. Slide 9: Safety update

    Safety update FY15-FY18 TRIFR1 Critical Control Management Verifications 3.6 3.7 3.3 2k 2.4 in FY18 252k in FY18 FY15 FY16 FY17 FY18 Integrated Safety System Highlights with existing systems • Three years fatality free, zero life changing injuries and historically low TRIFR Process Safety • Safety r

  10. Slide 10: Investment Proposition

    Investment Proposition Long Low cost reserve life production Organic growth Do what options we say (at Cadia, Lihir and Wafi Golpu) Strong exploration & technical Financially robust capabilities 9

  11. Slide 11: Sustainability

    Sustainability Areas of High Importance Who we are Conducting business transparently and ethically Our people Ensuring employee and contractor health and safety Managing our people and their capabilities Social Performance Local community development and investment Environmental Stewardship Water ma

  12. Slide 12: Our people plan

    Our people plan Our people vision Measure of success Talented people working together to High performance no-nonsense culture with top their full potential quartile organisational health 1 2 3 Get the basics Develop our Create a diverse right people and and inclusive + capability + environment The r

  13. Slide 13: Diversity & Inclusion

    Diversity & Inclusion Diversity and inclusion are essential parts of Newcrest’s vision, values and company culture. We aim to create a diverse and inclusive environment where everyone feels safe, valued and supported to bring their unique self to work. We know having a diverse and inclusive work env

  14. Slide 14: Our Diversity & Inclusion Strategy

    Our Diversity & Inclusion Strategy 13

  15. Slide 15: Our Executive Team

    Our Executive Team Sandeep Biswas Gerard Bond Craig Jetson Craig Jones lan Kemish Managing Director & CEO Finance Director & CFO EGM Cadia, Lihir & Group EGM Wafi-Golpu EGM People & Technical Services External Affairs bs — : Francesca Lee Michael Nossal Phil Stephenson Melanie Allibon General Counse

  16. Slide 16: An aligned executive remuneration structure

    An aligned executive remuneration structure 1 Short Term Incentive Criteria People, Safety Safety & Sustainability 25% 25% Operating Earnings Performance 25% 25% Personal Business measures measures Value & Cash 40% 60% Costs Generation 25% 25% Profitable Free Cash Flow Growth 25% 25% Long Term Incen

  17. Slide 17: Culture – Measuring success

    Culture – Measuring success • Organisational Health Index – measures how an organisation aligns itself, executes with excellence, and renews itself to sustainably achieve performance aspirations • Healthy organisations deliver superior financial and operating performance over both the short and long

  18. Slide 18: Our performance Edge

    Our performance Edge The vision Measure of success Our relentless drive to realise the Safely maximising cash generation full potential of our assets 1 2 3 Stretch Targets Owner’s Mindset Operating discipline Aspirational targets that drive A strong owner’s mindset and Rapidly identify and capture b

  19. Slide 19: Our operating assets and advanced project

    Our operating assets and advanced project Cadia Lihir FY19 Prod. Guidance: 800-880koz Au, ~90kt Cu FY19 Prod. Guidance: 950-1,050koz Au FY18 AISC: $171/oz FY18 AISC: $934/oz Ore Reserves: 23moz gold & 4.4mt copper Ore Reserves: 25moz gold Mineral Resources: 39moz gold & 8.4mt copper Mineral Resource

  20. Slide 20: Trending down the cost curve

    Trending down the cost curve Newcrest’s Position on the AISC Cost Curve ($/oz)1,2 1,300 1,200 1,100 1,000 900 FY18, 835 Sept18Q, 778 800 June18Q, 795 700 600 500 400 0% 25% 50% 75% 100% FY18 Company Curve Newcrest 1. Source: Metals Focus “MF Quarterly Gold Mine Cost Service – Q2 2018” (cost curve);

  21. Slide 21: Newcrest retains long reserve life advantage

    Newcrest retains long reserve life advantage Note: Width of bubble size represents relative size of gold reserves, indicative AISC margin based on $1,200 gold price Indicative AISC Margin - Interest Exp US$ per ounce1 500 Newcrest 400 Barrick Goldcorp 300 Kinross Gold Fields Newmont 200 AngloGold 10

  22. Slide 22: Newcrest retains long reserve life advantage

    Newcrest retains long reserve life advantage Note: Width of bubble size represents relative size of gold reserves, indicative AISC margin based on $1,200 gold price 500 Indicative AISC Margin - Interest Exp US$ per ounce1 Newcrest 400 Barrick Goldcorp 300 Kinross Gold Fields 200 Newmont AngloGold 10

  23. Slide 23: Lihir and Cadia are in a class of their own

    Lihir and Cadia are in a class of their own Mineral Resource & Ore Reserve base of global majors’ operating assets (moz)1 60 Solid bars = ore reserve 50 Transparent bars = mineral resource 40 moz 30 20 10 - 1 Based on producing assets held by Barrick, Newmont, Goldcorp and Newcrest with an attributa

  24. Slide 24: Lihir and Cadia are in a class of their own

    Lihir and Cadia are in a class of their own Resource & Reserve base of global majors’ operating assets (moz)1 60 Solid bars = ore reserve 50 Transparent bars = mineral resource 40 moz 30 20 10 - 1 Based on producing assets held by Barrick, Newmont, Goldcorp and Newcrest with an attributable reserve

  25. Slide 25: Newcrest’s reserve ounces arguably undervalued

    Newcrest’s reserve ounces arguably undervalued Enterprise Value to Gold Equivalent Reserve Ounce ($/oz)1 $1,000 $900 $800 $700 $600 $500 $400 Avg. (ex NCM) $300 $200 $100 $0 1 Source: FactSet and company reports. Note: Gold equivalent values based on spot commodity prices as at 8 October 2018. Enter

  26. Slide 26: Strong total shareholder returns

    Strong total shareholder returns Total Shareholder Return – 1 July 2015 to 19 October 2018 (%)1 200 150 Cumulative Total Shareholder Return (%) 100 NCM AUD +64% 50 NCM USD +52% Gold Index +17% - (50) (100) 30/06/2015 31/12/2015 30/06/2016 31/12/2016 30/06/2017 31/12/2017 30/06/2018 Newcrest AUD Newc

  27. Slide 27: Technology & Innovation

    Technology & Innovation Sandeep Biswas Managing Director & CEO 26

  28. Slide 28: Our technology and innovation plan

    Our technology and innovation plan The vision Measure of success Unlock full potential of assets through Quickly transform tough innovation and step change thinking deposits into tier one assets 1 2 3 Transformative Collaboration and Fast Vision Experimentation Adoption + + Realise full potential of

  29. Slide 29: Value breakthrough strategies

    Value breakthrough strategies targeting five breakthroughs by 2020 Breakthrough Levers Operating Adopting now Evaluating Developing future NextGen NextGen Intensive pre- Autonomous Undercut-less Post caving cave process Caving conditioning production caving leaching control NextGen Partial Low cost

  30. Slide 30: NextGen Caving

    NextGen Caving deeper, more productive Breakthrough challenge: Materially reduce cave establishment costs and improve the productivity of caving as grades decline Remove personnel from hazardous environments Intensive pre-conditioning Cave process control Hydrofracturing equipment, Cadia Elexon cave

  31. Slide 31: NextGen HydroMet

    NextGen HydroMet processing complex ores at materially lower cost Breakthrough challenge: Selective treatment based on improved understanding of orebody mineralogy, experimentation and ore type process customisation Partial (selective) oxidation Low cost refractory process Pyrite end members, Lihir

  32. Slide 32: Selective Processing

    Selective Processing removing waste earlier from mine to mill Breakthrough challenge: Rejection of unprofitable material as early as possible in the mining and refining process Improve plant performance and mineral recoveries Float residue scavenging Particle sorting Float tails leach, Lihir Ore sor

  33. Slide 33: Robotic Mining

    Robotic Mining remote, safe, productive mining Breakthrough challenge: Creating a long term vision of the future mine system and collaborating with developers and manufacturers to make this an operational reality In mine sensing Robotic mine production Proximity detection system, Telfer Remote mobil

  34. Slide 34: Sustainable mines

    Sustainable mines reducing footprint and costs Breakthrough challenge: Improve the environmental and social impact of our operations and projects through technology and innovation Renewable energy Energy efficiencies Geothermal power infrastructure, Lihir O2 plant, Lihir Value capture levers • Renew

  35. Slide 35: Newcrest and TCS collaboration

    Newcrest and TCS collaboration • Newcrest signed a collaboration agreement with Tata Consultancy Services (TCS) on 16 October 2018. • TCS is a leading IT services, consulting and business solutions firm that has been partnering with businesses on their transformation journeys. A genuine, long-term p

  36. Slide 36: Cadia

    Cadia Craig Jetson EGM – Cadia, Lihir & Group Technical Services 35

  37. Slide 37: Cadia – Cash generation plus growth potential

    Cadia Cadia – Cash generation plus growth potential Site Process Key Statistics 1 Element Description Gold Reserve Life: ~33 years Mining Panel Cave mining from Cadia Gold Ore Reserves: 23moz East (Panel Cave 1 and 2), Gold Mineral Resources: 39moz with underground crushing and Copper Ore Reserves:

  38. Slide 38: Cadia – Health, Safety & Environment

    Cadia – Health, Safety & Environment Key activities TRIFR1 • NextGen training implemented across 12 workforce - managers and opinion leaders 9 active in building the safety culture • Critical control management embedded at 6 manager and supervisor level 3 • Occupational health and hygiene program an

  39. Slide 39: Cadia – Generic process flow sheet

    Cadia – Generic process flow sheet Flotation Rougher / Copper Grinding Scavenger Coarse Ore Flotation Concentrate Flotation Ore Secondary Crushers Ball Mills Cells Flash Float / Sources Gravity Circuit Concentrate Blayney thickener De-watering HPGR ROM SAG Mill Re-grind / Cyclone Mill Underground Tr

  40. Slide 40: Cadia – Process plant

    Cadia – Process plant Ridgeway Concentrator 2 conveyor Concentrator 1 Coarse ore stockpile Mobile maintenance Administration Cadia East conveyor 39

  41. Slide 41: Cadia - Site overview

    Cadia - Site overview Commercial, Cadia Hill administration & open pit processing Waste rock Cadia East dumps subsidence Location of embankment Water storage slump Southern Northern Tailings Facility Tailings Facility 40

  42. Slide 42: Cadia – Edge performance improvement

    Cadia – Edge performance improvement Initiative implemented Current initiative in progress Initiative Initiative • Draw point availability and utilisation • Grinding media cost and performance through improved secondary break & optimisation scheduling Activity Activity • Collaborate with suppliers t

  43. Slide 43: PC2 partial breakthrough to surface

    PC2 partial breakthrough to surface Yielded Zone Mobilised PC1 PC1 PC2 PC2 PC2 Cave shape as at September 2018 • PC2 is now interacting with the existing PC1 draw column, as planned • PC2 eastern draw is being tightly controlled for final cave propagation to the surface • Improving maturity of fragm

  44. Slide 44: Cadia East subsidence zone expanding

    Cadia East subsidence zone expanding • Subsidence crater deepening as PC1 draw continues • Tension cracks forming and growing above PC2 yielded and Cracking mobilisation zones • Site access road re-routed early 43

  45. Slide 45: Mine induced seismicity

    Mine induced seismicity • Seismicity for last two years >0.5ML • Mining process relies on seismicity • Management of seismicity achieved through sequence and geometry of blocks, ground support system and conditioning of rockmass to reduce potency of events • Real time monitoring and management throu

  46. Slide 46: Northern Tailings Storage Facility repair

    Northern Tailings Storage Facility repair • Root cause of failure not related to seismicity • No movement in embankment detected since event • Independent review expected to be finalised by end of 2018 • Repair plan to be finalised after receipt of independent review findings • Reviewed the STSF and

  47. Slide 47: NextGen Caving improvements

    NextGen Caving improvements post April 2017 seismic event Cave preconditioning • The next mine block, PC2-3, will Orebody have significantly more pre- Hydrofracturing conditioning performed than PC1 or PC2. • Hydrofracturing will be extended into the footprint and surrounding infrastructure areas wi

  48. Slide 48: NextGen Caving improvements

    NextGen Caving improvements post April 2017 seismic event Caving engineering • Cave engineering level used to precondition the rockmass and install monitoring beacons before cave commencement • Footprint well developed ahead of cave front minimising personnel to the higher stress abutment zone 47

  49. Slide 49: NextGen Caving improvements

    NextGen Caving improvements post April 2017 seismic event Fault line knowledge • Major review of structures & fault lines through the underground system has been undertaken • Future caves incorporate these learnings, with improved identification processes in studies ensuring critical infrastructure

  50. Slide 50: NextGen Caving improvements

    NextGen Caving improvements post April 2017 seismic event Boundary fault hydrofracturing for seismic release Hydrofracturing will be completed on identified high stress faults outside of the cave zone to reduce the potential impact of future fault slips. Near cave fault to be Near cave fault hydrofr

  51. Slide 51: NextGen Caving improvements

    NextGen Caving improvements post April 2017 seismic event Dynamic tunnel support capacity • The dynamic capacity of the rock bolts used in the cave was consumed during seismic event • We have replaced and upgraded this capacity with deeper dynamic bolts • All future caves have been planned with this

  52. Slide 52: Cadia Expansion PFS Findings

    Cadia Expansion PFS Findings1,2 Cadia - uniquely long life Debottlenecking to 33mtpa with upside potential to 35mtpa Project capital: $ 598m IRR: 21% - Plant expansion: $ 58m Payback (years): 8 - PC2-3 development: $ 540m NPV: $887m 1000 120 900 100 800 700 Copper Production (kt) Gold Production (ko

  53. Slide 53: Cadia Gold, Copper & Gold Equivalent production

    Cadia Gold, Copper & Gold Equivalent production1 1 Assumptions include: Gold price of US$1,200/oz, copper price of US$3.00/lb, AUD:USD exchange rate of 0.75. Recovered Gold & Copper Production as provided in the chart above as indicative of the forward metal sales profile. Gold-equivalent production

  54. Slide 54: Indicative Cadia panel cave development

    Indicative Cadia panel cave development1 1 Diagram is taken from the Prefeasibility Study, which was prepared with the objective of being subject to an accuracy range of ±25%. Panel cave development is subject 53 to completion of the Feasibility Study, all necessary permits, regulatory requirements

  55. Slide 55: Cadia’s indicative cave production schedule

    Cadia’s indicative cave production schedule1,2 Panel Cave Start Construction First production Ore (mt) PC2-3 FY19 FY22 122 PC1-2 FY21 FY25 401 PC3-1 FY36 FY38 153 PC2-4 FY42 FY43 106 PC5001 FY44 FY47 93 PC1-4 FY48 FY52 154 PC2-5 FY49 FY52 35 35 30 25 Ore Production (mtpa) 20 15 10 5 0 PC1-4 PC2-5 PC

  56. Slide 56: Cadia – Pre-Feasibility Study Indicative mine plan

    Cadia – Pre-Feasibility Study Indicative mine plan1,2,3,4 Timing (Years) Total material movement (Mt) Plant Feed (Mt) Average Gold grade (g/t) Average Copper grade (%) FY19 – 21 ~90 ~91 1.0 0.4 FY22 – 24 ~99 ~94 0.6 0.3 FY25 – 27 ~99 ~99 0.5 0.4 FY28 – 30 ~99 ~99 0.4 0.3 FY31 – 33 ~99 ~99 0.5 0.3 FY

  57. Slide 57: Cadia – Expansion to 33Mtpa

    Cadia – Expansion to 33Mpta1 Flotation Rougher / Copper Grinding Scavenger Coarse Ore Flotation Flotation Concentrate Ore Secondary Crushers Cells Flash Float / Sources Gravity Circuit Concentrate Ball Mills thickener HPGR ROM Blayney De-watering SAG Mill Re-grind / Cyclone Mill Train to port Underg

  58. Slide 58: Cadia – Potential expansion to 35Mtpa

    Cadia – Potential expansion to 35Mpta1 Flotation Rougher / Copper Grinding Scavenger Coarse Ore Flotation Flotation Concentrate Ore Secondary Crushers Cells Flash Float / Sources Gravity Circuit Concentrate Ball Mills thickener HPGR ROM Blayney De-watering Re-grind / SAG Mill Cyclone Mill Train to p

  59. Slide 59: Cadia – Concept study 35mtpa indicative mine plan

    Cadia – Concept study 35mtpa indicative mine plan1,2,3 Timing (Years) Total material movement (Mt) Plant Feed (Mt) Average Gold grade (g/t) Average Copper grade (%) FY19 – 21 ~90 ~91 1.0 0.4 FY22 – 24 ~102 ~97 0.6 0.3 FY25 – 27 ~103 ~103 0.5 0.4 FY28 – 30 ~105 ~105 0.5 0.3 FY31 – 33 ~106 ~106 0.5 0.

  60. Slide 60: Cadia Life of Mine recovery improvement options

    Cadia Life of Mine recovery improvement options1 PFS Life of Mine Gold Recovery 72% Further Recovery Improvement Options Innovative Coarse Traditional Option or Ore Flotation Ball Mill Confirmed Recovery Improvements • Extended use of Jameson Cells 3 - 4% • Upgrades to the gravity gold circuit • Exp

  61. Slide 61: Selective Processing

    1 Selective Processing Coarse Ore Flotation • Coarse Ore Flotation is an aerated fluidized-bed separator that has demonstrated increased recovery of coarse particles compared to conventional flotation technology • The Coarse Ore Flotation circuit treats the full flotation tailings stream from Train

  62. Slide 62: Selective Processing

    Selective Processing Full scale coarse ore flotation plant operational • Coarse Ore Flotation plant • Cost ~$30m • Trials began July 2018 Coarse ore flotation plant, Cadia 61

  63. Slide 63: Sustainable mines

    Sustainable mines Cadia Water Saving Initiatives • Site Water Committee established 55 initiatives aiming to conserve, recover or secure water: • Lifting tails thickener performance to technical limits. • Optimising process control loops to minimize water wastage. Total Water Projected savings Thick

  64. Slide 64: Sustainable mines

    Sustainable mines Cadia Energy Energy represents ~20% of Cadia’s operating costs New energy contract announced in December 2017 • Base price is 20% lower than the previously contracted price for FY18 • Fixed price contract to the end of FY23 Investigating renewable energy solutions for Cadia • Optio

  65. Slide 65: NextGen HydroMet – Molybdenum Plant Update

    NextGen HydroMet Molybdenum Plant Update Feasibility Study in progress yielding the following results: • Design of a molybdenum separation plant expected to generate ~6,500tpa of 52% molybdenum concentrate • Flow sheet and plant layout optimised through the Feasibility Study • Shipping and logistics

  66. Slide 66: Technology & Innovation opportunities at Cadia

    Technology & Innovation opportunities at Cadia Lower capex, higher productivity caving, recoveries, tailings Breakthrough challenge: • Step change reduction in block cave est. costs • Low cost increase in mining capacity • Reduce energy intensity • Sustainable, low cost tailings disposal Value captu

  67. Slide 67: Cadia - Community Relations

    Cadia - Community Relations Cadia has a strong commitment to local schools and the next generation of the local community. It offers scholarships, apprenticeships, and secondary school bursary programs to local students to ensure they are given every opportunity to take advantage of Cadia. Cadia Gen

  68. Slide 68: Cadia - Community Relations

    Cadia - Community Relations Cadia is partnering with the Orange Local Aboriginal Land Council for seed collection, propagation and tree planting for its rehabilitation programs. The partnership includes funding a full-time Business Development role within the Orange Local Aboriginal Land Council to

  69. Slide 69: Lihir

    Lihir Craig Jetson EGM - Cadia, Lihir & Group Technical Services 68

  70. Slide 70: Lihir – Turnaround continues

    Lihir Lihir – Turnaround continues Site Process Key Statistics 1 Element Description Gold Reserve Life: ~27 years Gold Ore Reserves: 25 moz Mining Open pit drill, blast, load and haul mining, currently in Gold Mineral Resources: 52 moz Phase 9 of Minifie Pit and Phases 14 & 15 in Lienitz. FY19 Prod.

  71. Slide 71: Lihir – Health, Safety & Environment

    Lihir – Health, Safety & Environment Key activities TRIFR1 2 • NextGen roll-out commenced with whole management team 1.5 • NewSafe commenced for contractors and employees in the Mining and Mobile 1 Maintenance teams 0.5 • Process Safety HAZOP’s2 have been completed in the processing area 0 • Environ

  72. Slide 72: Lihir – Process plant

    Lihir – Process plant Coarse ore Pre-ox CCD NCA #1 stockpile tanks FGO mills NCA #2 Flotation & Main gate grind thickener HGO mills Lime & cyanide Oxygen plants Warehousing Main admin building Wharf Seawater intake & Diesel power Autoclave Tank farm Maintenance tailings outfall station buildings 71

  73. Slide 73: Lihir - Mine area

    Lihir - Mine area Dyno Minifie pit area Shovel pad explosives Lienetz pit area magazine Primary Kapit flat crushers stockpile Mine offices Near shore cut- off wall (proposed) Geothermal plant Mobile fleet Future Kapit workshop mine area Interim power Harbour waste station platform Wharf #1 & #2 Inne

  74. Slide 74: Lihir’s increased throughput lowers AISC per oz

    Lihir’s increased throughput lowers AISC per oz 12mtpa 13mtpa 14mtpa 15mtpa By December 2015 By December 2016 By December 2017 By end June 20191 ✓ Achieved with 12.4mtpa ✓ Achieved with 13mtpa in × Achieved with 15mtpa • Current target in December 2015 December 2016 quarter in March 2018 quarter qua

  75. Slide 75: NextGen HydroMet

    NextGen HydroMet partial oxidation strategy – delivering results Actively manage autoclave throughput based on sulphur content of feed to maximise gold production Microcrystalline Crystalline (blocky) pyrite – appears pyrite – appears less 1 1 more reactive and reactive and generally has higher gene

  76. Slide 76: Lihir - Indicative mine plan

    Lihir - Indicative mine plan1,2,3,4,5 Timing Total Material Tonnes to Ex-pit Tonnes Stockpile Tonnes Average Feed Sources Waste (Mt) Plant Feed (Mt)4 (Years) Moved (Mt)3 Stockpiles (Mt) Fed (Mt) Fed (Mt) Grade g/t Minifie & Lienetz, medium grade FY19-23 340-350 140-150 35-40 30-35 40-50 70-80 ~2.6 s

  77. Slide 77: Organic growth options at Lihir

    Organic growth options at Lihir1 • Steady increase in mill throughput • Since plant expansion completed in FY13, only small expansion capital spend • Introduction of new operating strategy (partial oxidation) unlocked Lihir FY19 • Aspirational target of 17mtpa – multiple potential avenues to achieve

  78. Slide 78: Lihir – Process flow sheet - current

    Lihir – Process flow sheet - current Ore sources Crushing Grinding 14 MTPA 14 MTPA Waste Flotation Expit FGO Float tails Gyratory leach stage 2 Coarse Ore Tails Abon Stockpile leach pipeline HGO1 8 MTPA Jaw 1 Stockpiles 11 MTPA HGO2 Leaching Jaw 2 Pressure Oxidation Float / autoclave bypass 77

  79. Slide 79: Lihir – Rate and utilisation drive performance

    Lihir – Rate and utilisation drive performance 2,500 16 90% 16.00 Millions Millions 14 14.00 85% 2,000 12 12.00 Average Operating Milling Rate (t/hr) 80% 10 10.00 1,500 Tonnes Milled Tonnes Milled Utilisation 8 75% 8.00 1,000 6 6.00 70% 4 4.00 500 65% 2 2.00 0 0 60% - FY11 FY12 FY13 FY14 FY15 FY16 F

  80. Slide 80: Lihir – Edge performance improvement

    Lihir – Edge performance improvement Initiative implemented Current initiative in progress Initiative Initiative • Increase the life span of the agitator • Safe explosives loading under hot geothermal blades in the Autoclaves conditions (up to 150°C) Achieved Activity • The new design and wear resis

  81. Slide 81: Lihir - Recovery and rate performance

    Lihir - Recovery and rate performance Lihir Recent Recovery and Rate performance 16 86 14 84 82 12 Milled Tonnes (mtpa) Gold Recovery (%) 80 10 78 8 76 6 74 4 72 2 70 0 68 2010 2011 2012 2013 2014 2015 2016 2017 2018 Milled Tonnes (mt) Gold Recovery (%) 80

  82. Slide 82: Lihir - Pursuing improvement in recovery

    Lihir - Pursuing improvement in recovery Potential Target Initiative 1 Description Recovery Capital 4 Timing 5 Uplift 2 & 3 Recover high grade fast floating material to reduce fines Flash Flotation 1% to 2% $$ FY21 losses Additional Flotation Capacity Additional roughing capacity to improve residenc

  83. Slide 83: Lihir recovery improvement options

    Lihir recovery improvement options • Increase float fines recovery by • Increase utilisation of installed float tails leach (FTL) facility by addressing backend capacity constraints • Autoclave improvements reduced available space in Counter Current Decantation (CCD) unit for FTL • Adding low cost C

  84. Slide 84: Lihir seepage barrier

    Lihir seepage barrier Proposed new position of seepage barrier Feasibility Study Ongoing • Ground investigation completed in FY18 • Re-alignment toward the east is likely go forward pathway • Easterly alignment utilises the Harbour Waste Platform as a key embankment • Plastic concrete panel wall con

  85. Slide 85: Pit cooling - Key activities and achievements

    Pit cooling - Key activities and achievements • Cooling the ground with cold water injection (CWI) • Drilled 6 directional drill holes to permit water injection, monitoring and steam relief – all wells drilled between 500-900m long, 250-350m deep • Drilling eight sub-vertical wells to permit pressur

  86. Slide 86: Lihir Deep Sea Tailings Placement

    Lihir Deep Sea Tailings Placement • Rigorous baseline studies prior to approval • DSTP approved as the preferred tailings management option from an environmental and social point of view for Lihir which has limited space for terrestrial tailings storage and is a seismically active region • Ongoing m

  87. Slide 87: Sustainable mines

    Sustainable mines Lihir Geothermal Power Generation Program Context • Mining the Kapit orebody will impact geothermal power production • Any lost geothermal power was to be replaced with conventional power Seepage barrier design and construction optimisation • Impact on geothermal infrastructure bei

  88. Slide 88: Technology & Innovation opportunities at Lihir

    Technology & Innovation opportunities at Lihir Throughput, recoveries, energy, mining systems Breakthrough challenge: • Reduce all-in Kapit mining costs • Reduce energy intensity of processing • Convert large resource and mineral endowments to higher margin production levels Value capture levers Nex

  89. Slide 89: Lihir – Community relations

    Lihir – Community relations What we are doing differently Key Achievements • Enhanced engagement with the community • No community disruption since April 2015 • Increased transparency - quarterly fact sheets • Increased community trust and media coverage on royalty payments, tax • Targeted delivery

  90. Slide 90: Lihir Agreements Review Update

    Lihir Agreements Review Update Status Next Steps • The revised MOA is with National Executive Council • Liaise with Minerals Resources Authority to for endorsement establish status of MOA • Compensation, Relocation and Development • Agreements to be tabled for executive level Agreements being drafte

  91. Slide 91: Telfer

    Telfer Philip Stephenson EGM Gosowong, Telfer & HSES 90

  92. Slide 92: Telfer – Seeking to maximise value

    Telfer Telfer – Seeking to maximise value Site Process Key Statistics 1 Element Description Gold Reserve Life: ~5 years Mining Open pit mining contracted Gold Ore Reserves: 2.4moz to Macmahon Gold Mineral Resources: 8.2moz Underground sub-level cave Copper Ore Reserves: 0.21mt and stope mining contr

  93. Slide 93: Telfer – Health & Safety

    Telfer – Health & Safety Key activities TRIFR1 • NewSafe Opinion Leaders and Site Leadership team 12 continuing to build the safety culture through progressive implementation of NewSafe playbooks. 9 • NewSafe NextGen delivery commenced across site. 6 • New Pre-Task Risk Assessment tool capturing the

  94. Slide 94: Telfer – Site map

    Telfer – Site map Dump leach Airport & village Main Dome open pit West Dome open pit Underground shaft Power station ROM pads Processing plant Tails storage facility 93

  95. Slide 95: Telfer – Process Plant

    Telfer – Process Plant Primary SCATS stockpile Primary crushing Crushing Underground Maintenance mine transfer workshops conveyor Coarse ore Warehouse stockpile Grinding & Raw water dam gravity Copper concentrate Pyrite regrind storage & load out Reagent storage Copper flotation Tails thickening CIL

  96. Slide 96: Telfer – Process Flow Sheet

    Telfer – Process Flow Sheet Crushing & Stockpiling Grinding, Classification & Copper/Gold Flotation & Pyrite/Gold Flotation & Tailings Disposal Gravity Concentration Treatment Treatment Open Pit & Underground SAG Mills, Ball Mills Copper Roughers, Cleaners Pyrite Roughers, Cleaners, Tailings Dam Min

  97. Slide 97: Telfer – Indicative underground ore sources

    Telfer – Indicative underground ore sources FY19 FY20 FY21 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 SLC WF M Reef 96

  98. Slide 98: Telfer – Indicative open pit ore sources

    Telfer – Indicative open pit ore sources FY19 FY20 FY21 FY22 FY23 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 MD4 MD6 WD2 WD3 WD4 97

  99. Slide 99: Telfer – Indicative mine plan

    Telfer – Indicative mine plan Mineral Resource & Ore Reserves1 Cutback Timetable Gold Copper FY19 onwards2,3 Dry Tonnes Grade Insitu Gold Dry Tonnes Insitu Timing Indicative Grade (%) Pit Cutback Stage (Million) (g/t) (Moz) (Million) Copper (Mt) (years) Cost Ore Reserves Main Dome Open Pit 21 0.56 0

  100. Slide 100: Telfer – Edge performance

    Telfer – Edge performance Key initiatives • Ore designation optimisation • Minimise ore rehandle • Modify stacker chutes to reduce crusher • Maintenance effectiveness and efficiency downtime review underway with tool time focus • M Reef stope production bottleneck removal • Contract management and c

  101. Slide 101: Telfer - Selective Processing

    Telfer - Selective Processing A system changing focus • Pilot plant testing underway to test potential of innovative x-ray ore sorting technology to extract value out of the Telfer scats stream • Positive early stage results yielding gold and copper metal recovered back to the process that would oth

  102. Slide 102: Telfer - Selective Processing

    Telfer - Selective Processing A system changing focus Test results to date (3 months) Parameter Test results to date Feed 100 kt Feed gold grade 0.18 g/t Feed copper grade 0.04% Gold recovery 79% Copper recovery 60% Mass recovery to product 26% Gold product grade 0.56g/t Copper product grade 0.08% •

  103. Slide 103: Telfer - Near mine resource extensions

    Telfer - Near mine resource extensions • Aspirational target +100 koz – higher value UG mine life • Complete assessment <12 months Main Dome M Reefs North M-Reefs SLC Cave limit M Reefs M60-70 South LLU North Western Flanks LLU South LLU SW Target Testing LLU W Economic/Geological Assessment Rejecte

  104. Slide 104: Telfer - Technology & Innovation opportunities

    Telfer - Technology & Innovation opportunities A system changing focus Breakthrough challenges: Single train processing • The Telfer team are exploring a number of avenues to drive a step change reduction to the all-in cost base • Ore sorting could make the large marginal resource endowment into new

  105. Slide 105: Telfer – driving sustainability

    Telfer – driving sustainability • Driving leading practice in arid mine site • Newcrest has a deep history of engagement with rehabilitation the Martu people, and together we have built an • Ongoing stakeholder engagement between intergenerational and multi-pronged approach to regulators, the commun

  106. Slide 106: Telfer hedge profile

    Telfer hedge profile Financial Year Ending Gold Ounces Hedged Average Price A$/oz 30 June 2019 231,224 1,739 30 June 2020 204,794 1,729 30 June 2021 216,639 1,864 30 June 2022 204,615 1,902 30 June 2023 137,919 1,942 Total 995,191 1,826 *During FY18 Newcrest realised 294,697 ounces of Telfer gold he

  107. Slide 107: Gosowong

    Gosowong Philip Stephenson EGM Gosowong, Telfer & HSES 106

  108. Slide 108: Gosowong – Strong free cash contributor

    Gosowong Gosowong – Strong free cash contributor Site Process Key Statistics1 2 Element Description Gold Reserve Life: ~2 years Gold Ore Reserves: 0.48 moz Mining Underground mining using predominantly underhand Gold Mineral Resources: 1.2 moz cut-and-fill (Kencana) and long hole stopes with paste F

  109. Slide 109: Gosowong – Health, Safety & Environment

    Gosowong – Health, Safety & Environment Key activities TRIFR1 • Underground mining risk reviews 5 completed and a comprehensive QA/QC program implemented 4 • Improved Mine Planning and Geotechnical 3 Management programs implemented • Critical Control Management embedded at 2 manager and supervisor l

  110. Slide 110: Gosowong – Process plant

    Gosowong – Process plant WHS reagent Mixing reagent Process water Crusher storage area pond Mill feed stockpile CCD train #2 ROM pad CCD train #1 stockpile SAG #1 Ball mill gravity SAG #2 circuit Merrill Crowe circuit & gold Fuel diesel room storage tank 109 Power house Power house Mechanical & Preg

  111. Slide 111: Gosowong – Process flow sheet

    Gosowong – Process flow sheet Ore Cyclone Verti mill Sources Plating and Grinding Jaw Smelting Crusher Smelting and SAG Mill Leach Tanks moulds Ball Mill Merrill Crowe Gold Process doré Cyclone Hopper CCD Thickeners Trucking ore to surface Gravity Recovery Detox tank Tails Dam Underground Undergroun

  112. Slide 112: Gosowong – Indicative mine plan

    Gosowong – Indicative mine plan Mineral Resource & Ore Reserves1 Gold Silver Dry Tonnes Grade Insitu Gold Grade Insitu Silver (millions) (g/t) (Moz) (g/t) (Moz) Ore Reserves 1.9 8.0 0.48 10 0.62 Mineral 3.7 10 1.2 14 1.7 Resources Proposed indicative development of Gosowong mining operations 2,3 Tim

  113. Slide 113: Gosowong – Edge performance improvement

    Gosowong – Edge performance improvement Initiative implemented Current initiative in progress Initiative Initiative • Increase exhaust capacity of K1 / KN • Optimise Toguraci Yahut stope dimension Ventilation System Activity Achieved • Improving strike length at Yahut to accelerate • The Kencana und

  114. Slide 114: Gosowong – CoW agreement provides regulatory certainty

    Gosowong – CoW agreement provides regulatory certainty Amended Contract of Work • CoW has been amended in line with the agreement in place with the Government of Indonesia - provides certainty of regulatory and fiscal framework going forward • Newcrest’s 75%-owned Indonesian subsidiary PT NHM to pay

  115. Slide 115: Gosowong – $1.6bn free cash flow generated

    Gosowong – $1.6bn1 free cash flow generated • High grade world-class epithermal • Over 5.4moz gold produced and province discovered by Newcrest ~$1.6bn free cash flow generated geologists in 1993 since first full year of production in 2000 • Gosowong has performed reliably and consistently while del

  116. Slide 116: Wafi-Golpu

    Wafi-Golpu Craig Jones EGM Wafi-Golpu 115

  117. Slide 117: Wafi-Golpu – Updated Feasibility Study

    Wafi-Golpu Wafi-Golpu – Updated Feasibility Study1 Key Statistics – Golpu2 Gold Ore Reserves: 5.5 moz IRR3: ~18.2% (real) Avg. copper grade: 1.27% Gold Mineral Resources: 9.3 moz NPV: ~$2.6bn (real) Avg. gold grade: 0.9 g/t Copper Ore Reserves: 2.5 mt Payback: ~9.5 years from Avg. annual copper comm

  118. Slide 118: Wafi-Golpu – Indicative production

    Wafi-Golpu – Indicative production1,2,3 1 Figures above reflect 100% of project, Newcrest owns 50% of the project. These figures are estimates from the updated Feasibility Study (as at 19 March 2018) and as such were prepared with the objective of being subject to an accuracy range of ±15%, with the

  119. Slide 119: Wafi-Golpu – Indicative free cashflow

    Wafi-Golpu – Indicative free cashflow1,2 Year post grant of SML 1 2 3 4 5 6 and board approval Undiscounted FCF $(133)m $(374)m $(465)m $(1,003)m $(766)m $(82)m (100% basis) 1 Figures above reflect 100% of project, Newcrest owns 50% of the project. These figures are estimates from the updated Feasib

  120. Slide 120: Wafi-Golpu – Indicative timeline and staging

    Wafi-Golpu – Indicative timeline and staging Months From SML 1 & Board Approval 3 Commence Nambonga Decline 58 Process plant commissioning and first production (dev’t ore) 65 Block cave 44 (BC1) first production (first draw bell fired) 72 BC1 commercial production 126 Block cave 42 (BC2) commercial

  121. Slide 121: Potential economic and social benefits

    Potential economic and social benefits • ~2,500 jobs during construction • ~850 ongoing operations jobs • Plus employment of local contractors and suppliers • Social development investment program designed across the life of the mine • Since 2010, the Program has also been investing in water and san

  122. Slide 122: Unlocking the potential of Morobe

    Unlocking the potential of Morobe • Will open up the region from Highlands Highway to Bulolo Highway • Unlock Morobe’s agribusiness potential: • cocoa development program • investigate other potential agricultural initiatives • Complement and support the Morobe Provincial Government's Kundu Vision 2

  123. Slide 123: DSTP the preferred tailings option

    DSTP the preferred tailings option Pipe location Huon Gulf Steep sub-sea slopes Deep Canyon Sediment movement towards a 9km deep trench • Extensive scientific studies completed • Western Huon Gulf is a highly suitable environment for DSTP • Environmentally and socially, deep sea tailings placement i

  124. Slide 124: DSTP the preferred tailings option

    DSTP the preferred tailings option 123

  125. Slide 125: Exploration & Growth

    Exploration & Growth Michael Nossal Chief Development Officer 124

  126. Slide 126: Exploration and Technical capability drive Ore Reserve & Mineral Resource growth

    Exploration and Technical capability drive Ore Reserve & Mineral Resource growth1,2 200 Moz Golpu 180 Deeps Deep M Reefs Telfer Toguraci UG 160 Cracow Cadia Hill Wainaulo 140 Kencana O'Callaghans 120 Toguraci Gosowong Lihir Marsden Open Pit Acquisition 100 Cadia East 80 Ridgeway Morobe Acquisition 6

  127. Slide 127: Able to mine and process a diverse range of Gold and Gold-Copper deposits

    Able to mine and process a diverse range of Gold and Gold-Copper deposits 126

  128. Slide 128: NextGen Caving

    NextGen Caving Newcrest’s Caving Technology enables deeper search space 2000 - 2010 2009 - 2016 2012 onwards Future 2005 onwards Ridgeway Ridgeway Cadia East Golpu Telfer Sublevel Deeps Sequence of > Block Caves Sublevel Caving Caving Block Cave 10 caves 127

  129. Slide 129: Australia Undercover Search Space – New Approach

    Australia Undercover Search Space – New Approach Gold Deposit Endowment Our Cover / Basement Search Young Cover Space Palaeozoic Basement Old Archean-Proterozoic Basement 128

  130. Slide 130: Looking deeper in Australia opens new opportunities

    Looking deeper in Australia opens new opportunities 1. Looking Deeper in Outcrop Areas 2. Exploring under Cover Cross Section (Not to Scale) High resolution geophysics NO SURFACE Surface MINERALISED EXPRESION OUTCROP OPEN CUT 100m MINE Newcrest UNDER COVER Search Space Traditional Barren Cover 200m

  131. Slide 131: Leveraging of our expertise to look deeper in South America

    Leveraging of our expertise to look deeper in South America Satellite Mapping High Resolution Geophysics Ultra trace geochemistry Prospective Hot Crack As Land Surface Alteration Blanket 100m As As Sb Bi Sb 200m Sn Mo Mo Te Epithermal Gold Au Au Shallow Altered Rock 500 Intermediate Sulfidation Depo

  132. Slide 132: Exploration Innovation Smarter and Faster Exploration

    Exploration Innovation Smarter and Faster Exploration Ground Selection • Fertility toolbox • Crustal-scale frameworks • Predictive Technologies Smarter and Faster Geochemistry • Ultra low level geochemistry • Machine learning/clustering High Resolution Core Logging • Real-time assaying • High-resolu

  133. Slide 133: Exploration Innovative Predictive Technologies

    Exploration Innovative Predictive Technologies 60 km Satellite Image - Satellite Mapping Chile 60 km Known Gold Target Surface Altered Rock Indicator Mineral Map Known Gold Target Key Indicator Mineral KNOWN GOLD TARGET TCS automation of satellite image processing to rapidly and routinely produce mi

  134. Slide 134: What is a Tier 1 deposit?

    What is a Tier 1 deposit? “We aspire to a portfolio within 10 years of 5 x Tier 1 assets, 2 - 4 x Tier 2 assets and a strong pre-production pipeline …” Definitions of Tier 1 and Tier 2 assets below used to guide portfolio optimisation decisions: Tier 1 Tier 2 Scale Potential for > 300 kozpa Au Poten

  135. Slide 135: Current exploration footprint

    Current exploration footprint North America • Jarbidge (O & AP) • Rattlesnake Hills (O & FI) • Epithermal targets (100%) Mexico • Azucar Minerals (EI) Indonesia PNG • Antam Alliance • Wamum (100%) • Tatau / Big Tabar Island (O & FI) Ecuador Cote d’Ivoire • SolGold (EI) • Séguéla (100%) • Lundin Gold

  136. Slide 136: Americas – Active early entry arrangements

    Active early entry arrangements Name Jurisdiction Target Arrangement Status Altazor, Mirasol Chile HS Epithermal Au Option and Farm In Drilling planed in early 2019 Zeus, Mirasol Chile HS Epithermal Au Option and Farm In Target generation Jarbidge USA LS Epithermal Au Option & Asset Purchase Active

  137. Slide 137: Ecuador – attractive place to invest

    Ecuador – attractive place to invest • Ecuador is a mineral rich country with limited history of mining • The Government is keen to open up the sector and establish mining as another arm of the Ecuadorian economy. • Newcrest conducted extensive due diligence prior to investing in Ecuador. • In addit

  138. Slide 138: Lundin Gold strategic partnership

    Lundin Gold strategic partnership Equity Investment • In February 2018, Newcrest announced a $251m investment in Lundin Gold to acquire a 27.1% interest in the company • Newcrest has appointed two directors to Lundin Gold board and Project Advisory Committee to oversee the development of Fruta del N

  139. Slide 139: Lundin Gold strategic partnership

    Lundin Gold strategic partnership Exploration earn-in • HoA to form a JV to explore eight early stage exploration concessions north and south of Fruta del Norte • Up to 50% interest earn-in → $20m over a 5yr period, incl. minimum $4m in first 2 yrs • Newcrest to manage exploration activities • Syner

  140. Slide 140: Newcrest’s long-term metal assumptions used for Reserves and Resources estimates

    Newcrest’s long-term metal assumptions used for Reserves and Resources estimates1 Long Term Metal Newcrest & Assumptions MMJV Mineral Resources Estimates Gold Price US$1,300/oz Copper Price US$3.40/lb2 Silver Price US$21.00/oz Ore Reserves Estimates Gold Price US$1,200/oz Copper Price US$3.00/lb3 Si

  141. Slide 141: Newcrest’s Mineral Resources and Ore Reserves – Gold Mineral Resources

    Newcrest’s Mineral Resources and Ore Reserves 31 December 2017 Gold Mineral Resources1 Comparison to Dec-16 Dec-17 Mineral Resources Measured Resource Indicated Resource Inferred Resource Dec-17 Total Resource Total Resource Competent Person Dry Gold Dry Gold Dry Gold Dry Gold Insitu Gold Dry Gold I

  142. Slide 142: Newcrest’s Mineral Resources and Ore Reserves – Copper Mineral Resources

    Newcrest’s Mineral Resources and Ore Reserves 31 December 2017 Copper Mineral Resources1 Comparison to Dec-16 Dec-17 Mineral Resources Measured Resource Indicated Resource Inferred Resource Dec-17 Total Resource Total Resource Competent Person Dry Copper Dry Copper Dry Copper Dry Copper Insitu Coppe

  143. Slide 143: Newcrest’s Mineral Resources and Ore Reserves – Gold Ore Reserves

    Newcrest’s Mineral Resources and Ore Reserves 31 December 2017 Gold Ore Reserves1 Comparison to Dec-16 Dec-17 Ore Reserves Proved Reserve Probable Reserve Dec-17 Total Reserve Total Reserve Competent Person Dry Gold Dry Gold Dry Gold Insitu Gold Dry Gold Insitu Gold Gold Ore Reserves Tonnes Grade To

  144. Slide 144: Newcrest’s Mineral Resources and Ore Reserves – Copper Ore Reserves

    Newcrest’s Mineral Resources and Ore Reserves 31 December 2017 Copper Ore Reserves1 Comparison to Dec-16 Total Dec-17 Ore Reserves Proved Reserve Probable Reserve Dec-17 Total Reserve Reserve Competent Person Dry Copper Dry Copper Dry Copper Insitu Copper Dry Copper Insitu Copper Copper Ore Reserves

  145. Slide 145: Recent update to Cadia East and Cadia Hill Ore Reserves

    Recent update to Cadia East and Cadia Hill Ore Reserves1 Cadia East Ore Reserve Ore Gold Copper Silver Mt g/t Moz % Mt g/t Moz Total Ore Reserve 1,400 0.49 22 0.30 4.2 0.79 35 Proved Ore Reserve Probable Ore Reserve 1,400 0.49 22 0.30 4.2 0.79 35 On 23 April 2018 Newcrest announced that the Cadia Hi

  146. Slide 146: Finance & Capital Management

    Finance & Capital Management Gerard Bond Finance Director & CFO 145

  147. Slide 147: Shareholder returns focus – FY16-18

    Shareholder returns focus – FY16 - 18 Improved Strengthen Improve Stronger free operational balance returns to cash flow performance sheet shareholders • Low AISC/oz • FY16 FCF of $814m • Net debt reduction of • Strong relative share $1.1bn in 2 years price performance • Lihir throughput • FY17 FCF

  148. Slide 148: Shareholder returns focus – going forward

    Shareholder returns focus – going forward Improved Strengthen Improve Stronger free operational balance returns to cash flow performance sheet shareholders • Continue with Edge • Focus on safe • Continue to reduce • Pursue profitable maximisation of free net debt, lower growth • Throughput uplift at

  149. Slide 149: Nine consecutive halves of strong free cash flow

    Nine consecutive halves of strong free cash flow 148

  150. Slide 150: History of strong operating cash flow

    History of strong operating cash flow 7,000 1,434 6,387 $m 1 6,000 833 1,467 601 5,000 3,243 728 4,000 1,241 739 427 3,000 1,280 814 2,000 426 3,144 854 965 1,000 829 0 136 FY14 FY15 FY16 FY17 FY18 Total FCF Investing cash flow Operating cash flow 1 In FY18, includes $251m investment in Lundin Gold

  151. Slide 151: Strong balance sheet

    Strong balance sheet Debt, Cash and Leverage1,2 5,000 3.0 (times) ($m) 4,000 2.5 3,000 2.0 2,000 1.5 1,000 1.0 - 0.5 FY10 FY11 FY12 FY13 FY14 FY15 FY16 FY17 FY18 (1,000) - (2,000) (0.5) US Private Placement Notes Corporate Bonds Other Bilateral Bank Debt Cash (as negative) Leverage Ratio (RHS) 1 Dat

  152. Slide 152: Good debt structure and clean balance sheet

    Good debt structure and clean balance sheet Maturity profile as at 30 June 20181 ($m) 1,200 Corporate Bonds 900 600 300 - FY17 FY18 FY19 FY20 FY21 FY22 FY23 FY24 FY25 FY42 • FY17 – Fully repaid US Private Placement debt and drawn bank facilities • No goodwill remaining on the balance sheet • Relativ

  153. Slide 153: Improving financial policy metrics

    Improving financial policy metrics Element Target 30 June 2016 30 June 2017 30 June 2018 Leverage ratio Less than 2.0x Financial Metrics 1.6x 1.1x 0.7x (Net Debt / EBITDA) (for trailing 12 months) Gearing Ratio Less than 25% 22.8% 16.6% 12.2% Credit rating Aim to maintain investment grade Investment

  154. Slide 154: Focused on returns to shareholders

    Focused on returns to shareholders Dividend Policy1 Newcrest’s dividend policy seeks to balance financial performance and capital commitments with a prudent leverage and gearing level for the Company. Newcrest looks to pay ordinary dividends that are sustainable over time having regard to its financ

  155. Slide 155: Balanced deployment of cashflow

    Balanced deployment of cashflow Dividends declared, Interest and Exploration payments 20.0 18.5 17.9 18.0 15.6 16.0 14.0 15 13.4 cents per share 12.0 10.0 9.4 7.5 7.6 8.0 5.7 6.0 4.0 2.0 0.0 FY16 FY17 FY18 Exploration Payments Interest Paid Dividend Declared 154

  156. Slide 156: Operating costs – exchange rate exposure estimates

    Operating costs – exchange rate exposure estimates Newcrest is a US dollar reporting entity, its operating costs will vary in accordance with the movements in its operating currencies where those costs are not denominated in US dollars. The table below shows indicative currency exposures on operatin

  157. Slide 157: Operating costs – indicative costs by type

    Operating costs – indicative costs by type 1 The below represents an indicative exposure on operating costs by a variety of spend types (FY18) Maintenance Energy and Labour 2 Consumables (excl labour) Other3 Total Fuel and Parts Cadia 35% 15% 15% 20% 15% 100% Telfer 35% 15% 15% 15% 20% 100% Lihir 40

  158. Slide 158: Foreign exchange sensitivities and oil hedges

    Foreign exchange sensitivities1 and oil hedges Approximate Full Year Site Parameter Movement EBIT Impact (US$m) Cadia AUD/USD +0.01 AUD (0.75 → 0.76) (9) Telfer AUD/USD +0.01 AUD (0.75 → 0.76) (3) Lihir USD/PGK -0.1 PGK (3.20 → 3.10) (8) Gosowong USD/IDR -1,000 IDR (13,500 → 12,500) (10) Group AUD/U

  159. Slide 159: AISC and AIC to cost of sales reconciliation

    AISC and AIC to cost of sales reconciliation 12 months to 30 June 2018 12 months to 30 June 2017 US$m US$/oz US$m US$/oz Gold sales (koz)1 2,308 2,377 Cost of Sales 2,724 1,180 2,541 1,069 less Depreciation and amortisation (777) (336) (671) (282) less By-product revenue (543) (235) (476) (200) plus

  160. Slide 160: FY18 results

    FY18 results Element Cadia Lihir Telfer Goso- Bonikro Wafi- Corp / Group wong Golpu Other Gold Production (koz) 600 955 426 251 115 2,346 Copper Production (kt) 62 - 16 - - 78 AISC ($m) 100 869 533 234 83 107 1,926 Capital Expenditure - Production Stripping1 - 95 43 - 12 - - 150 - Sustaining Capital

  161. Slide 161: FY19 guidance

    FY19 guidance1 Element Cadia Lihir Telfer Goso- Wafi- Corp / Group wong Golpu Other Gold production (koz) 800-880 950-1,050 400-460 200-240 - - 2,350-2,600 Copper production (kt) ~90 - ~13 - - - 100-110 AISC ($m)2,3 85-155 880-935 530-575 230-250 - 95-110 1,870-1,970 Capital expenditure - Production

  162. Slide 162: Digital

    Digital Gerard Bond Finance Director & CFO 161

  163. Slide 163: Newcrest’s Digital Strategy

    Newcrest’s Digital Strategy • Integrated data across systems and networks • Machine level automation ✓ Focussed on site needs • Intelligent use of alarms and visualisations PROCESS • Accurate instrumentation and sensors CONTROL ✓ Data driven insights applied across value • Optimise site operations t

  164. Slide 164: Lihir – Digital collaboration yields planning insights

    Lihir – Digital collaboration yields planning insights 163

  165. Slide 165: Cadia – NexGen surveying improves safety and production

    Cadia – NexGen surveying improves safety and production 164

  166. Slide 166: Cadia - Soft ‘virtual’ sensors increase crusher capacity

    Cadia - Soft ‘virtual’ sensors increase crusher capacity Benefit 165

  167. Slide 167: Cadia - Predictive algorithm reduces mill down time

    Cadia - Predictive algorithm reduces mill down time 166

  168. Slide 168: Lihir – Digital drives mill optimisation

    Lihir – Digital drives mill optimisation 167

  169. Slide 169: Lihir - Virtual reality technology improves safety

    Lihir - Virtual reality technology improves safety 168

  170. Slide 170: Lihir - Digital dashboards improve operator performance

    Lihir - Digital dashboards improve operator performance 169

  171. Slide 171: Cadia - Machine learning reduces crushing costs

    Cadia - Machine learning reduces crushing costs 170

  172. Slide 172: Newcrest taps global talent pool through crowdsourcing

    Newcrest taps global talent pool through crowdsourcing Lihir Acoustic Machine Health Physical sensors on autoclaves to Cadia Hydrosaver determine sparge predicts tailings tube deterioration underflow density Enabling reuse and recycling of water. Currently moving into production Cadia underground lo

  173. Slide 173: The Newcrest Crowd

    The Newcrest Crowd Hydrosaver Goal: Predict tailings underflow density by 3 hours to increase water recycled in the plant and reduce tailings deposited. Result: 750 predictive models, 150 people from 12 countries. Status: 90% complete implementing into Cadia SAOC. Get to the Core Goal: Automate crop

  174. Slide 174: Newcrest Mining Limited

    NEWCREST MINING LIMITED Board Forward Shareholder Enquiries to Peter Hay Non-Executive Chairman Link Market Services Sandeep Biswas Managing Director and CEO Tower 4, 727 Collins Street Gerard Bond Finance Director and CFO Melbourne, Victoria, 3000 Philip Aiken AM Non-Executive Director Australia Ro