Slide 1: Consulting & verification on reactor protection systems (RPS)
Consulting & verification on reactor protection systems (RPS) Challenge During a NPP lifecycle the instrumentation & control (I&C) systems are subject to modifications. The scope ranges from parameter adjustments to a complete exchange of I&C. Against this background, projects have to manage the req
Slide 2: Contact
Measurement of the response time of trip function chains I&C close-loop-testing E.ON Technologies GmbH Tresckowstraße 5 04/2015 30457 Hannover Contact T +49 5 11- 4 39 -35 03 Dr. Ulrich Wilke www.eon.com/technology ulrich.wilke@eon.com