  1. Slide 1: 9M 2010 January-September, 15th November 2010

    9M 2010 JANUARY - SEPTEMBER 15th November 2010

  2. Slide 2: Disclaimer

    Disclaimer This document has been prepared by ACCIONA, S.A. (“ACCIONA” or the “Company”) exclusively for use during the presentation of financial results of the first nine months 2010 (9M10). Therefore it cannot be disclosed or made public by any person or entity with an aim other than the one expre

  3. Slide 3: Table of Contents

    Table of Contents 1. Key Highlights 2. Operating Performance 3. Financial Information by Division 4. Conclusions 9M10 Results Presentation 3

  4. Slide 4: 1. Key Highlights

    1. Key Highlights

  5. Slide 5: Key Highlights

    Key Highlights ƒ Grid connection of the third Concentrated Solar Power (CSP) plant of 50MW (October) ƒ Grid connection of the second biomass plant from straw Energy combustion in Spain (16MW) ƒ Start of the construction of a wind farm in Canada (45MW, August) and a wind farm in India (56MW, October)

  6. Slide 6: Energy: CSP and biomass plant grid connections

    Energy 1 Grid connection of the third CSP plant (October) ƒ ACCIONA Energy has grid connected its new 50MW CSP plant at Majadas de Tiétar (Cáceres, Spain) ƒ The project represents an investment of €237m ƒ The plant will produce clean electricity equivalent to the consumption of around 30,000 homes 2

  7. Slide 7: Energy: Start of construction of two wind farms in Canada and India

    Energy 3 Start of the construction of two wind farms: Canada and India ƒ Launching of construction of a 45MW windfarm in Lamèque (Canada) ƒ It will represent an investment of ∼ CAD115m (∼ €83m1) ƒ ACCIONA will sell the power produced to the utility New Brunswick Power under a 25-year contract ƒ It w

  8. Slide 8: Energy: 4Q CESUR auction forward sale of 1.4TWh

    Energy 4 4Q CESUR auction Æ forward sale of 1.4TWh CESUR 3Q 2010: 44.5 45 +1% CESUR 2Q 2010: 40.5 (€/MWh) CESUR 1Q 2010: 39.4 Avg Pool 3Q 2010: 44.1 +16% 35 +55% Avg Pool 2Q 2010: 35.0 25 Avg Pool 1Q 2010: 25.4 15 Jan Feb Mar Apr May Jun Jul Ago Sep Monthly average pool price Quarter arithmetic aver

  9. Slide 9: Infrastructures: Northern Link tunnel and Windsor Essex Parkway

    Infrastructures 5 ƒ ACCIONA, as a part of the Transcity consortium, awarded the Northern Link tunnel in Australia for €1,100m Northern Link tunnel ƒ The Transcity consortium, formed by ACCIONA (40%), BMD Constructions in Australia (30%) and Ghella (30%), has been (~ €1,100m) chosen to design, constr

  10. Slide 10: Water: Water treatment plants in Italy

    Water 7 Water treatment plants in Italy (€32m) ƒ ACCIONA Agua has been awarded a contract for the management, overseeing, control and maintenance of 165 water treatment plants and 494 pumping stations in Sardinia ƒ The total amount of the contract awarded is €32m ƒ The 3 year contract had been put o

  11. Slide 11: 2. Operating Performance

    2. Operating Performance

  12. Slide 12: P&L Main Figures

    P&L Main Figures Key Figures EBITDA Breakdown1 9M10 By Division Jan-Sep Jan-Sep (€m) Chg. (%) 69% Energy 2009 2010 14% Infrastructures Revenues 4,700 4,570 -2.8% 2% Real Estate EBITDA 695 813 +17.0% 4% Water and ES Net profit of Services and Other 11% continued 104 101 -3.3% Business activities €813

  13. Slide 13: Capex by Division

    Capex by Division Net Capex Breakdown Key Highlights By Division Capex Capex ƒ Core businesses capture most of (€m) 9M09 9M10 the Group’s Capex: Energy 848 398 – Energy: 52% Infrastructures 136 256 – Infrastructures: 33% 87% Real Estate 71 -52 – Water: 2% Water & Environtment 5 19 ƒ Exceptional inve

  14. Slide 14: Debt & Liquidity Analysis

    Debt & Liquidity Analysis Net Debt Breakdown Gross Debt Breakdown By Division By Nature (€m) Net Debt % 30-Sep-10 of Total 42% Energy 5,781 71% Infrastructures 635 8% Real Estate 1,013 13% 58% Logistic & Transport 207 3% Water & Environment 51 1% Other Business 412 5% Total Net Debt 8,098 100% €9,58

  15. Slide 15: Debt & Liquidity Analysis: Amortization Schedule

    Debt & Liquidity Analysis Debt Amortization Schedule (€m) 2,059 2 year bridge loan financing the acquisition of Endesa assets (€1,500m; maturity June 2011) 571 385 407 390 1,991 369 291 306 263 20 22 115 1815 6 20 24 30 20 35 67 47 84 67 +12months +24months +36months +48months +60months Energy Infra

  16. Slide 16: 3. Financial Information by Division

    3. Financial Information by Division

  17. Slide 17: Energy

    Energy Mini-Hydro Concentrated Solar Conventional Wind Biomass WTG Biofuels special regime Solar Power Photovoltaic Hydro 9M10 Results Presentation 17

  18. Slide 18: Energy: Key Figures

    Energy: Key Figures Revenues (€m) EBITDA (€m) 1,071 Generation 46.7% 53.1% +23.9% Industrial, 12% develop. & other 864 EBITDA margin 20% 569 +41.1% 404 80% 88% 649 428 -24 -80 Jan-Sep 09 Jan-Sep 10 Jan-Sep 09 Jan-Sep 10 ƒ Despite 9M10 low pool prices in Spain (-11.0% vs 9M09), the energy division sh

  19. Slide 19: Energy: Capacity

    Energy: Capacity MW Installed @ Sep 2010 MW under Construction @ Sep 2010 MW (Total) Spain Internat. Total MW (Total) Spain Internat. Total Wind 4,591 1,654 6,244 Wind 35 403 438 Hydro special regime 232 - 232 Hydro special regime - - - Conventional Hydro 680 - 680 Conventional Hydro - - - Biomass 4

  20. Slide 20: Energy: Production

    Energy: Production Attributable Production (GWh) (Attributable GWh) 30-Sep-09 30-Sep-10 Chg. (%) Other tech. Wind Spain Wind Spain 4,345 6,043 39% (27%) (51%) Wind international 2,012 2,683 33% Total Wind 6,356 8,726 37% Hydro special regime 318 672 112% Conventional Hydro 354 1,689 377% Biomass 102

  21. Slide 21: Energy: Wind Overview

    Energy: Wind Overview Load Factor (%) Prices – Spain (€/MWh) 89.9 9M09 9M10 87.6 85.7 87.2 83.5 81.4 79.7 78.9 79.8 80.3 -4.4% Spain 23.8% 24.8% 73.0 71.5 70.2 78.6 78.2 76.5 78.1 76.8 71.7 International 31.6% 28.9% 62.0 Total 25.6% 25.9% Jan. Feb. March April May June July Aug. Sept. Final Price 9M

  22. Slide 22: Infrastructures

    Infrastructures Construction Concessions Real Estate 9M10 Results Presentation 22

  23. Slide 23: Infrastructures: Key Figures

    Infrastructures: Key Figures Revenues (€m) EBITDA (€m) 24% 34% Const. & Eng 24% 37% Concessions EBITDA margin 5.2% 5.0% 2,653 International % 2% -12.7% 138 2,315 -15.4% 4% 10% 117 23% 98% 96% 90% 77% Jan-Sep 09 Jan-Sep 10 Jan-Sep 09 Jan-Sep 10 ƒ Slowdown of domestic construction volumes during 9M10

  24. Slide 24: Infrastructures: Construction Backlog September 2010

    Infrastructures: Construction Backlog September 2010 Construction Backlog (€m) Construction Backlog By Client Type Chg. Vs (%) (€m) 30-Sep-09 31-Dec-09 30-Sep-10 30-Sep-09 31-Dec-09 Civil works (Spain) 4,027 3,802 3,144 -22% -17% Civil works (Internat.) 1,266 1,282 1,935 53% 51% Total Civil Works 5,

  25. Slide 25: Infrastructures: Construction Backlog September 2010

    Infrastructures: Construction Backlog September 2010 Construction Backlog 9M09 Construction Backlog 9M10 International International 24% 35% Spain Spain 76% 65% €7,178m €6,879m International Backlog 9M10 Spanish Backlog 9M10 By Geography By Client Europe (39%) Central Administration (48%) Canada (23

  26. Slide 26: Infrastructures: Concessions

    Infrastructures: Concessions ƒ Increased international contribution ƒ Very young concessions portfolio ƒ Book value of concessions as of Sep 2010: €1,286m (equity and net debt) Revenues Breakdown - By Geography 9M09 9M10 32% 24% 68% 76% €64.5m Spain €91.1m International 9M10 Results Presentation 26

  27. Slide 27: Infrastructures: Real Estate

    Infrastructures: Real Estate Revenues (€m) EBITDA (€m) Development 163 Rental Assets 10% -17.8% Parkings 134 21.6% 12.3% EBITDA margin 21% 13% 35 -53.4% 22% 10 16 9 69% 65% 24 17 2 Jan-Sep 09 Jan-Sep 10 -10 Jan-Sep 09 Jan-Sep 10 ƒ De-stocking in the residential market (housing units reduced from 2,2

  28. Slide 28: Services and Other Business

    Services and Other Business Services Other Businesses Logistic & Transport Urban & Environmental Asset Management Media (GPD) Winery 9M10 Results Presentation 28

  29. Slide 29: Logistic & Transport Services: Key Figures

    Logistic & Transport Services: Key Figures Revenues (€m) EBITDA (€m) Handling 12.4% 10.4% 627 Trasmediterránea -4.5% 599 Other 78 15% EBITDA margin 15% 7% -20.0% 62 5% 68% 67% 76% 77% 18% 17% 17% 18% Jan-Sep 09 Jan-Sep 10 Jan-Sep 09 Jan-Sep 10 ƒ Trasmediterránea affected by lower passenger volume on

  30. Slide 30: Water & Environment Services: Key Figures

    Water & Environment Services: Key Figures Revenues (€m) EBITDA (€m) 6.2% 6.0% Agua & ES 520 -1.5% 512 Other 32 -5.0% EBITDA margin 31 32% 31% 35% 21% 68% 69% 65% 79% Jan-Sep 09 Jan-Sep 10 Jan-Sep 09 Jan-Sep 10 ƒ Good performance of water and environment services: EBITDA up 15% ƒ Facility services an

  31. Slide 31: Water & Environment Services: Agua

    Water & Environment Services: Agua Agua Revenues Breakdown International Revenues Breakdown By Geography By Geography Spain 54% Australia (62%) Latam (10%) UK (9%) International Algeria (7%) 46% Italy (7%) Portugal (2%) USA (1%) RoW (1%) €304.3m €139.0m Water backlog as of 30th September was €4,346m

  32. Slide 32: Other Business: Key Figures

    Other Business: Key Figures Revenues (€m) EBITDA (€m) 29.8% 39.0% 80 EBITDA margin +10.7% 72 31 +44.5% 22 Jan-Sep 09 Jan-Sep 10 Jan-Sep 09 Jan-Sep 10 ƒ Includes: – Bestinver – “Bodegas Hijos de Antonio Barceló” winery business – Media (GPD) Bestinver had €4,806m under management as of September 2010

  33. Slide 33: 4. Conclusions

    4. Conclusions

  34. Slide 34: Conclusions

    Conclusions Strong growth driven by organic and acquired new capacity in Energy Decline in Spanish energy prices offset by higher load factors and forward sale strategy Significant recovery of Spain electricity prices in 3Q with an improved outlook Domestic construction slowdown partially offset by