Mithril Silver And Gold Limited · ASX:MTH

Mithril Silver And Gold — Mithril Resources — Investor Presentation (June 2013)

21 slides from Mithril Silver And Gold's investor presentation, Jun 17, 2013

  1. Slide 1: Investor Update Presentation

    Investor Update Presentation David Hutton - Managing Director 17 June 2013

  2. Slide 2: Disclaimer and Competent Persons Statement

    Disclaimer This presentation has been prepared by Mithril Resources Limited (Mithril). The information contained in this presentation is a professional opinion only and is given in good faith. Certain information in this document has been derived from third parties and though Mithril has no reason t

  3. Slide 3: Australian Copper – Gold Explorer

    Australian Copper – Gold Explorer East Arunta Copper IMMEDIATE PRIORITY AND FOCUS Iron Oxide Copper Gold (IOCG) and Volcanic Massive Sulphide (VMS) targets Priority targets being advanced to “drill ready” stage Drilling planned for Sept Qtr. 2013 West Kambalda Gold Recent acquisition Latest drill re

  4. Slide 4: Corporate Snapshot (ASX: MTH)

    Corporate Snapshot (ASX: MTH) Shares on issue 219.6 million Options (unlisted) 19.3 million Market Cap $5.2 million (at 2.4 cents) Cash (at 31 March 2013) $2.3 million Investments $0.6 million (7.68% of Musgrave Minerals Ltd) Enterprise Value $2.3 million Top 40 hold 44% Minotaur Resources (10%) and

  5. Slide 5: Board and Senior Management

    Board and Senior Management David Hutton Geologist (23 years experience) including roles at Mount Isa Managing Director Mines (copper), LionOre (nickel) and Western Metals (lead- zinc) Graham Ascough Geophysicist (25 years experience) including senior roles at Chairman Falconbridge (nickel and coppe

  6. Slide 6: East Arunta Project Area

    East Arunta Project Area Kidman Resources “Home of Bullion” Copper Deposit Page 6

  7. Slide 7: East Arunta Project Area

    East Arunta Project Area 6,000kms² area 100% owned and JV’s Plenty Highway Outcropping copper Illogwa IOCG Area Yambah VMS prospects Systematic exploration advancing priority targets to “drill ready” stage Remaining statutory approvals and heritage clearances expected early Sept Qtr. 2013 Drilling p

  8. Slide 8: East Arunta Project Area - landholdings

    East Arunta Project Area - landholdings Yambah VMS Illogwa IOCG Page 8

  9. Slide 9: Illogwa IOCG Area – a new IOCG province

    Illogwa IOCG Area – a new IOCG province Plenty Highway El Gordo prospect Austin prospect diamond drill core Mithril discovery late 2011 – WITH NO PREVIOUS DRILLING Multiple occurrences of outcropping copper throughout 500kms² area First drilling in Sept 2012 intersects copper (i.e. 14m @ 0.34% Cu fr

  10. Slide 10: Illogwa IOCG Area – outcropping copper

    Illogwa IOCG Area – outcropping copper Copper rich veins in granite Multiple cross cutting IOCG alteration events 120m Altered granite Altered granite Bigglesworth prospect Page 10

  11. Slide 11: Illogwa IOCG Area – aeromagnetics

    Illogwa IOCG Area – aeromagnetics Plenty Highway Page 11

  12. Slide 12: Illogwa IOCG Area – Mini Me West Priority Target

    Illogwa IOCG Area – Mini Me West Priority Target Mithril (80%) Cazaly Resources (20%) Coincident VTEM and IP anomaly Plenty Highway 800 metres strike length with outcropping copper (rock chip samples to 1.9%Cu) Never been drilled DRILL READY IP Chargeability Anomaly VTEM Conductor Mini Me West plan

  13. Slide 13: Illogwa IOCG Area – El Gordo Priority Target

    Illogwa IOCG Area – El Gordo Priority Target Mithril (80%) Cazaly (20%) 800 metre zone with outcropping copper One channel sample across 3.00% copper zone trend returns 7m @ 0.94%Cu 0.57% copper 0.24% copper 2012 reconnaissance drilling confirms mineralisation (i.e. 1.40% copper 14m @ 0.34%Cu from 1

  14. Slide 14: Yambah VMS – Bessie's Reward Priority Target

    Yambah VMS – Bessie’s Reward Priority Target Plenty Highway Mithril (100%) Multiple copper – zinc gossans (up to 9.69%Cu) throughout 450m x 100m area 3 shallow historic RC holes confirm “smoke” (incl. 22m @ 0.33% copper from surface) Page 14

  15. Slide 15: Yambah VMS – Red Rock Bore Priority Target

    Yambah VMS – Red Rock Bore Priority Target 400m long untested magnetic anomaly Plenty Highway Mineralised zone at surface 250m long untested magnetic anomaly Red Rock Bore plan with aeromagnetic image as background, drill holes and mineralised zone Outcropping zinc – lead – copper mineralisation has

  16. Slide 16: East Arunta Project - Next Steps

    East Arunta Project - Next Steps Mapping and sampling – June Qtr. 2013 Ground geophysics – June Qtr. 2013 Drill targets defined – end June Qtr. 2013 Statutory approvals and heritage clearances – early Sept Qtr. 2013 Drilling – Sept Qtr. 2013 Page 16

  17. Slide 17: West Kambalda Project Area

    West Kambalda Project Area Page 17

  18. Slide 18: West Kambalda Project Area

    West Kambalda Project Area 100% owned and JV’s 20 kms west of Kambalda 3 operating gold mills within 50 km radius Along strike from Wattle Dam Gold Mine Walk up drill targets; Spargos Reward Gold Mine Lady Allison Gold Deposit Latest drill results highlight economic potential 14m @ 6.75g/t gold incl

  19. Slide 19: West Kambalda – geological setting

    West Kambalda – geological setting KAMBALDA Spargos Reward (historic production of 30,000ozs) Lady Allison (Inferred Resource – 87,000ozs) Kunanalling Shear Zone Wattle Dam (historic production of 262,000ozs) Page 19

  20. Slide 20: Resource Inventory

    Resource Inventory Basil Copper Deposit JORC Copper cut off Tonnes Copper Cobalt Contained Contained cobalt Category grade (%) (Mt) (%) (ppm) copper (tonnes) (tonnes) Inferred 0.3 26.5 0.57 504 151,050 13,356 Inferred 0.1 90.0 0.28 309 252,000 27, 810 Lady Allison Gold Deposit (MTH right to earn up

  21. Slide 21: For further information

    For further information: David Hutton – Managing Director admin@mithrilresources.com.au 08 8378 8200

Mithril Resources — Investor Presentation (June 2013) on 6ix