Nesco Limited · NSE:NESCO
Nesco — Shareholder Meeting (August 2020)
26 slides from Nesco's shareholder meeting presentation, Aug 14, 2020
Slide 1: Presentation made at the 61st Annual General Meeting
NESCO LIMITED Nesco Center nesco Western Express Highway Goregaon (East) Mumbai 400063 T +9122 6645 0123 F +9122 6645 0101 E contact@nesco.in Ww www.nesco.in 14 August 2020 BSE Limited National Stock Exchange of India Limited Department of Corporate Services 5th Floor, Exchange Plaza, 25" Floor, Phi
Slide 2: Disclaimer
Nesco Limited Nesco Center, Western Express Highway, Goregaon (East), Mumbai 400063 Maharahstra, India CIN L17100MH1946PLC004886 Disclaimer This presentation and the accompanying slides (the “Presentation”), which have been prepared by Nesco Limited (the “Company”), have been prepared solely for inf
Slide 3: Nesco Realty
nesco realty
Slide 4: Towers
r nesco Tower 03 Tower 04
Slide 5: Existing and proposed towers: area, capex and revenue
0 nesco Existing Proposed Particulars Unit Total Tower 03 Tower 04 Tower 02 Area - Office Space & Related Sq. Ft. 6,65,000 12,00,000 26,80,000 45,45,000 Area - Licensed / Contracted Sq. Ft. 6,65,000 9,15,000 - 15,80,000 Capex - Cost of Construction Rs. Crores 140.00 400.00 950.00 1,490.00 Capex - MC
Slide 6: Proposed Tower 02
Proposed Tower 02 5
Slide 7: Proposed Tower 02
Proposed Tower 02 • Designed by Singapore based Architect firm • 26,80,000 Sq. Ft. office space • Floor plates ranging from 25,000 Sq. Ft. to 120,000 Sq. Ft. with options for horizontal and vertical exclusivity experience • Proposed Platinum LEED Certified • Direct Connectivity to Metro Station 6
Slide 8: Proposed Tower 02 amenities
Proposed Tower 02 • Integrated 4 Star Business Hotel - 300 keys, F&B and Banquet areas • Business Centre • Over 120,000 Sq. Ft. Open Space for Circulation and F&B on Plinth • Parking for over 3,000 vehicles • Landscape at multiple levels of building 7
Slide 9: Tenant Profile
Tenant Profile nesco realty BiackRock’ HSBC a AVA Zé a ae owe r7 Maps for Life priceline.com ® Se enpurance |§S > OO W@EGON IndiaFirst LIFE INSURANCE 8 =f Integreon FA.) FRAMESTORE
Slide 10: Bombay Exhibition Center
BOMBAY EXHIBITION CENTER 3 division of NESCO Ltd.
Slide 11: Capacity
Capacity • Airconditioned Halls • Ground Level • Currently has been serving the city residents as large covid care facility. • Depending on the improvement of the Covid situation, we hope to have some exhibitions/events to resume in Q4 10
Slide 12: Proposed New Hall
BOMBAY EXHIBITION CENTER a division of NESCO Ltd. 11
Slide 13: Proposed Hall Floor Plan
Proposed Hall Floor Plan • 150,000 Sq. Ft. Pillar Free Hall with 14 meter clear height • Pre-Function area • Multi Purpose Hall (Exhibitions, Musical Events, Sporting Events, Corporate Programs and more • Pre-engineered main structure with RCC 12
Slide 14: Covid Care Centre / MCGM
Covid Care Centre / MCGM 1200 Beds 200 ICU Beds Doctors onsite Hygiene Teams 13
Slide 15: 14
14
Slide 16: The Root
The Root • 25,000 Sq. Ft. world class facility having Chefs serving global cuisines • Capability to prepare and serve 20,000 meals each time 24X7 basis 15
Slide 17: Grande
Grande • 20,000 Sq. Ft. facility having plush ambience • Flexibility to divide in 3 independent halls or one large hall • Prefunction area • Ample parking space • Ideal for Corporate parties, Weddings and other Functions 16 16
Slide 18: Restaurants
Restaurants • Multiple restaurants • Food Court Outlets • Serving variety of cuisines 17
Slide 19: Community
Community SOUL FOOD FOR THE HUNGRY NESCO FOODS FOR MUMBAI STANDING STRONG WITH THE COVID WARRIORS 8 TONS OF KHITCHDI EVERYDAY & MORE…… 18
Slide 20: Indabrator
inda brator a division of NESCO Ltd. 19
Slide 21: Indabrator manufacturing
• Manufacturing located in Gujarat at Karamsad and Vishnoli • Fully integrated capability to manufacture Equipments, Spares and Abrasives • Surface Preparation Equipments, Painting Systems, Dust Collectors 20
Slide 22: Shot Blasting & Peening
Shot Blasting & Peening Air Painting Pollution Systems Control Indabrator Shot Peening machine with Robotic Pick & Place Spare Cut Wire Parts & Shots Services Steel Abrasives & Grits Large machines for Indian Railways CNC shot peening for clutch plates 21
Slide 23: Clientele
Clientele 1 (ee } ne LMW. =>6© AE adelaide GEARING THE FUTU gona THE SONA GROUP conden (©) FARV PRASHANT HNDUIAFOUNDRES | <p om T AT A mae Sri Ranganathar ol (P) Ltd os OP & 7 Al GD golclmy AU OFOUND ORY 4 @) LIMITED ff Mahindra AK> SSIGMA JyoT! % Shanthi (Sears Founories — (Ber inci Pistons Lim @ I
Slide 24: Clientele
Clientele un usha martin €é : ny >’ () Escorts ysw 14 Reliance “*{ a @mecins Industries Limited Def criss ee oe ww HAL DANIELI c SONICO @ RSB Q® a thd > TATA PROJECTS AS “aera (GN ALS eroM TMI G BAJAJ eh Tuyt ene LARSEN & TOUBRO am rus Wet SAIL ISGEC NHK na GJ Premium z= TAFE ¥ Ai SPRINGS LTD. AMMAN
Slide 25: Clientele
Clientele brator Gulf Valve Cee ac 1) ©) United Iron & Steel Company i. @ TECHNICAL METAL =e GLOBAL LEADER IN FASTENERS se Saudi Arabian Engineering Co. Ltd. GALFAR ENGINEERING & ae ac Fz paehh ie phil 4 ow & aul JI lito Al Rashed Fasteners ppd colin dei site cial dot hal hh BRV iss BRY SCAFFOLDING
Slide 26: Bombay Exhibition Center
yA nesco BOMBAY EXHIBITION CENTER nesco nesco events exhibitions a division of NESCO Ltd.