Tarachi Gold Corp. · CSE:TRG

Tarachi Gold — Investor Presentation (July 2021)

18 slides from Tarachi Gold's investor presentation, July 2021

  1. Slide 1: Building Mexico's Next Gold Producer

    Building Mexico’s Next Gold Producer July 2021

  2. Slide 2: Disclaimer

    DISCLAIMER Cautionary Statements Forward-Looking Statements This presentation contains “forward-looking statements” regarding Tarachi Gold Corp (the “Company”) within the meaning of applicable Canadian securities legislation. These include, without limitation, statements with respect to: possible ev

  3. Slide 3: Capital Structure

    Capital Structure Capital Structure Share Price and Volume on CSE Ticker CSE: TRG $0.90 2,200,000 $0.80 2,000,000 Share Price (May 6, 2021) C$0.375 1,800,000 52-Week Trading Range C$0.04 – C$1.00 $0.70 1,600,000 Share Price (C$) Basic Shares Outstanding 71.0M $0.60 1,400,000 Volume Options 5.1M1 $0.

  4. Slide 4: High-Grade Gold Exploration with Near-Term Cash Flow Potential

    High-Grade Gold Exploration with Near-Term Cash Flow Potential ✓ Well financed and led by ✓ Transformative Acquisition of ✓ High-Grade Gold Exploration proven exploration team the Magistral Tailings Plant Upside at the Tarachi Project • 3,708 ha property located in Sierra Madre gold • C$9.4M raised

  5. Slide 5: Projects Overview

    Projects Overview TARACHI MAGISTRAL Option agreements on Acquired in February, 3,708ha of highly 2021 from Manto prospective ground Resources. signed in 2020. Modern 1,000tpd mill Neighbours with Agnico and tailings pond. Eagle and Alamos Gold. Historical (non 43-101) tailings resource of 1.3Mt Curr

  6. Slide 6: Magistral del Oro Project

    Magistral del Oro Project • Gold mining in the area dates to 1620 with significant production from 1890 to 1960. Estimated total past production of 1,000,000oz Au. • Highway-accessible in the north of Durango. 3km from Santa Maria del Oro (pop. 5,500) with a skilled work force. Tailings Resource • 1

  7. Slide 7: Magistral del Oro Plant

    Magistral del Oro Plant H1 2021 H2 2021 H1 2022 H2 2022 2023-2025 • Project acquisition • Final flow sheet • Local hiring & training • Commercial Production Est. 15,000oz Au • PEA w/Ausenco decision • Plant commissioning • Positive Cashflow per annum • Permit audit • Plant modifications • Completion

  8. Slide 8: Tarachi Project Overview

    Tarachi Project Overview • Option to acquire 100% for US$4.75M in cash Ownership and 7.5M shares through March 2025 • 3,708 ha property located in Sonora, Mexico Property & • ~220 km by air east of the city of Hermosillo and Location 300 km south of the U.S. border • Located in an established gold m

  9. Slide 9: Tarachi South: Jabali

    Tarachi South: Jabali Phase 1 • Hosts the historic La Dura underground mine, where an estimated 100k tonnes at 2020 underground channel sampling >3 g/t Au was mined by artisanal miners. o Extensive underground workings in an intensively silicified and brecciated rhyolite • Underground channel sampli

  10. Slide 10: Tarachi South: Jabali

    Tarachi South: Jabali Phase 2 Assay Results Released May 6, 2021 from U/G Drill Rig Hole ID From To Core Gold Length* (m) (m) (m) (g/t) JAB-21-008 0.00 3.00 3.00 2.24 71.15 82.85 11.70 2.48 JAB-21-009 0.00 63.40 63.40 6.91 Including 5.70 15.00 9.30 17.42 And 18.80 32.70 13.90 17.37 Including 21.70 2

  11. Slide 11: Tarachi South: Jabali

    Tarachi South: Jabali Phase 2 drilling at Tarachi South Surface RC rig mobilized in April to test Au mineralization to the south of La Dura. Assays pending. Targeting intersection of two gold bearing structures. Utilizing U/G drill rig to explore eastern and southern extents of La Dura mineralized z

  12. Slide 12: Tarachi North

    Tarachi North AGNICO EAGLE’S TARACHI DEPOSIT (362,000oz Au resource) SAN JAVIER HISTORIC HOLES: 34.5g/t Au over 5m 24.3g/t Au over 3m FOCUS OF 2020 DRILLING: 11.9g/t Au over 2m 5.4g/t Au over 5.6m CSE: TRG 12 tarachigold.com

  13. Slide 13: Tarachi North: San Javier

    Tarachi North: San Javier San Javier Concession Highlights from first nine holes completed in 2020: • 11.9g/t Au over 2m in hole SJA-20-05 • 5.39g/t Au over 5.6m including 15.7 g/t over 1m in hole SJA-20-06 • 6.08g/t Au over 1m in hole SJA-20-02 16m Breccia zone in recent drill core showing 30-40% d

  14. Slide 14: Tarachi North: San Javier

    Tarachi North: San Javier Phase 2 drilling at Tarachi North (Expected start: 3rd week of May 2021) Targeting deeper extent of mineralized breccia intrusive. CSE: TRG 14 tarachigold.com

  15. Slide 15: 2020/2021 Exploration Program

    2020/2021 Exploration Program Phase 1: 2020 (completed) ✓ Data compilation and geologic fieldwork ✓ Targets identified and drill permits received ✓ Exploration camp has been erected at Tarachi and the team is following strict COVID-19 protocols • Inaugural 5,000m drill program (1,711m completed in 2

  16. Slide 16: Compelling Value with Upside

    Compelling Value with Upside Pre-Resource Stage Au-Ag Explorers in Mexico Tarachi offers compelling value relative to other pre-resource stage precious metal explorers in Mexico Key Project Tarachi Los Ricos Santana Platosa State Sonora Jalisco Sonora Durango Property Size 3,708 ha 22,000 ha 8,500 h

  17. Slide 17: Investment Highlights

    Investment Highlights • 3,708ha of highly prospective mineral concessions next to major miners ✓ Exposure to High-Grade • 5,000m drill program underway with Gold exploration in Mexico excellent early results • Acquired a 1,000tpd mill and access to a high-grade tailings resource Exciting 2021 • PEA

  18. Slide 18: Contact Info

    CONTACT INFO Cameron Tymstra Lorne Warner CEO VP Exploration & Director Email: cameron@tarachigold.com Email: lorne@tarachigold.com Head Office Suite 700, 1090-West Georgia St. Vancouver, BC V6E 3G4 CSE: TRG 18 tarachigold.com

Tarachi Gold — Investor Presentation (July 2021) on 6ix