Marimaca Copper Corp. · TSX:MARI

Marimaca Copper — Investor Presentation (April 2025)

27 slides from Marimaca Copper's investor presentation, Apr 24, 2025

  1. Slide 1: Chile's New Copper Discovery

    SOUTH AMERICA MEJILLONES MARIMACA ANTOFAGASTA SANTIAGO For personal use only CHILE’S NEW CHILE COPPER DISCOVERY Exceptional Development Project, Outstanding Exploration Potential Investor Presentation | April 2025 TSX: MARI CHILE’S NEW COPPER DISCOVERY 1 Advancing Development With District Scale Pot

  2. Slide 2: Disclaimer

    Disclaimer This presentation includes certain forward-looking statements about future events and/or financial results which are forward- looking in nature and subject to risks and uncertainties. Such forward-looking statements or information, including but not limited to those with respect to the de

  3. Slide 3: Introduction: Marimaca Copper Project

    Introduction: Marimaca Copper Project MEJILLONES MARIMACA ANTOFAGASTA For personal use only DFS underway SANTIAGO Continuous growth of evaluating simple, low oxide copper resources strip ratio, open pit CHILE operation Rapidly advancing Low execution risk CHUQUICAMATA MANTOS DE LA LUNA toward a cons

  4. Slide 4: Marimaca: Green Copper Mining Project of the Future

    Marimaca: Green Copper Mining Project of the Future WATER – recycled seawater supply secured from the Bay of Mejillones  For personal use only POWER – certified renewable electricity supply available  COMMUNITIES – no community land overlap, skilled local workforce  IMPACT – limited flora & fauna

  5. Slide 5: Water Supply: De-risked and sustainable

    Water Supply: De-risked and sustainable Recycled seawater from Mejillones will supply the Marimaca Copper Project • Water option secured from the Bay of Mejilllones – recycled seawater ― De-risks water supply for the For personal use only MARIMACA COPPER Marimaca Project – intake is already PROJECT

  6. Slide 6: Marimaca: Overview

    Marimaca: Overview Infrastructure access lowers execution risk Close to all aspects required to build a mine For personal use only Proximity to first class utilities and infrastructure Water, Power, Transport, Communications Within 25km of Port of Mejillones Access to all major consumables for a SX-

  7. Slide 7: Marimaca: Mineral Resource Growth

    Marimaca: Mineral Resource Growth Track record of Consistent resource growth through each drilling campaign M&I (MOD) Inferred (MOD) 1,250 kt For personal use only 1,000 kt 750 kt 500 kt 250 kt 0 kt 2017 2018 2019 2022 2023 Maiden Mineral 2018 MRE(2): 2019 MRE(3): 2022 MRE(4): 2023 MRE(5): Resource

  8. Slide 8: Marimaca Projects: 2025 / 2026 Work Programs

    Marimaca Projects: 2025 / 2026 Work Programs Exploration and Development in Parallel 2025 2026 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Sierra depersonal use only MOD DFS Permitting Approval Process  First milestone under permitting process achieved in February 2024; receipt of ICSARA Project Advancement Detailed D

  9. Slide 9: MOD: 2023 Resource Update – De-risking Milestone

    MOD: 2023 Resource Update – De-risking Milestone 86% of total resource tonnes now in Measured and Indicated categories 2023 MRE Plan View - MOD Significant conversion of Inferred tonnage and → contained metal over the 2022 MRE ― 44% increase in M&I Resource tonnes For personal use only to 200Mt at 0

  10. Slide 10: Marimaca Oxide Deposit: Why is it unique?

    Marimaca Oxide Deposit: Why is it unique? Location & access to infrastructure / utilities deliver lower execution risk Route 1 – National For personal use only Highway Antofagasta – 40km Port of Mejillones – 25km Existing 110kV Process Plant Powerline Existing Seawater Pipeline 7km Open Pit . Note:

  11. Slide 11: MOD Mining: Simple Open Pit Mining

    MOD Mining: Simple Open Pit Mining Favorable deposit geometry has potential to improve economics → Low strip ratio with ore body exposed at surface For personal use only - Favorable geometry of ore body has further reduced strip from MRE 1,500m → High grade zones from surface expected to be accessib

  12. Slide 12: MOD Processing: Simple SX-EW Processing

    MOD Processing: Simple SX-EW Processing Low complexity processing supports robust project economics Marimaca PEA flowsheet For personal use only Note: Marimaca Copper Project infrastructure shown per 2020 PEA layout which may or may not be similar or relevant for the Company’s CHILE’S NEW COPPER DIS

  13. Slide 13: Marimaca Oxides: Extensive Met Work Completed

    Marimaca Oxides: Extensive Met Work Completed Marimaca has completed rigorous met testing on materials across the deposit Tests completed on materials from across the full extent of the deposit and addressed all defined → For personal use only mineral subzones Seven extensive phases of met testing c

  14. Slide 14: Marimaca: Two-Pronged Strategy

    Marimaca: Two-Pronged Strategy Exploration and Development in Parallel Continued de-risking of the MOD - Project permit submitted – target FID in H1 2026 Project - Phase 7 metallurgical program near complete For personal use only Advancement - Water supply engagement complete – water option agreemen

  15. Slide 15: Complementary Resources: District Scale Potential

    Complementary Resources: District Scale Potential Strong ‘repetition’ style discovery potential Cindy Target: Compelling complimentary resource 30-40Mt at 0.3-0.4% CuT Roble Target: potential adding leachable resources to 20-30Mt at 0.2-0.3% CuT the MOD production capacity For personal use only Cedr

  16. Slide 16: Complementary Resources: Sierra de Medina Region

    Complementary Resources: Sierra de Medina Region Compelling district scale potential through exploration Sierra de Medina Claim Block Geological Setting For personal use only Cachorro: 3,000kt Contained Cu 300 Mt at 1.0% Cu Pampa Medina & Madrugador Marimaca Oxide Deposit Pampa Medina & Madrugador:

  17. Slide 17: Complementary Resources: Sierra de Medina Region

    Complementary Resources: Sierra de Medina Region Compelling district scale potential through exploration Pampa Medina & Madrugador Acquisitions For personal use only → o Both located ~25km from the planned MOD processing plant as defined in the ongoing DFS → o High grade, shallow, open-pitable histo

  18. Slide 18: Complementary Resources: Pampa Medina

    Complementary Resources: Pampa Medina Priority drilling target for 2025 For personal use only CHILE’S NEW COPPER DISCOVERY 18 Advancing Development With District Scale Potential

  19. Slide 19: Marimaca: Summary

    Marimaca: Summary Advancing Development & Outstanding Potential → A unique development stage copper asset with a clear development pathway • Release of MOD DFS targeted for Q2 2024 and Integration Study by Stantec with Tier 1 Location Pampa Medina is underway For personal use only • Confirmation of

  20. Slide 20: Appendices

    For personal use only Appendices CHILE’S NEW COPPER DISCOVERY 20 Advancing Development With District Scale Potential

  21. Slide 21: Experienced Board

    Experienced Board Experienced and Leading explorational, Deep experience in invested Board and regional and financial copper and Chile management team experience For personal use only Michael Haworth Hayden Locke Clive Newall Tim Petterson Non-Executive Chairman CEO, President & Director Non-Executi

  22. Slide 22: Experienced Management

    Experienced Management Experienced and Leading explorational, Deep experience in invested Board and regional and financial copper and Chile management team experience For personal use only Hayden Locke Sergio Rivera Jose Antonio Merino Nico Cookson CEO, President & Director Vice President of Explora

  23. Slide 23: Corporate Structure

    Corporate Structure LTM share price performance C$6.00 140,000 C$5.50 120,000 C$5.00 For personal use only 100,000 C$4.50 80,000 C$4.00 60,000 C$3.50 40,000 C$3.00 C$2.50 20,000 C$2.00 0 Mar-24 May-24 Jul-24 Sep-24 Nov-24 Jan-25 Mar-25 Capital Structure Board Analyst Coverage Stock Exchange TSX “MAR

  24. Slide 24: 2023 Mineral Resource Estimate

    2023 Mineral Resource Estimate Cut-off Measured Indicated Measured + Indicated Inferred grade (% CuT) Quantity Quantity Quantity Quantity CuT [%] CuS [%] CuT [%] CuS [%] CuT [%] CuS [%] CuT [%] CuS [%] For personal use only kt kt kt kt 0.40 44.0 0.77 0.44 37.5 0.69 0.38 81.6 0.73 0.41 12.1 0.64 0.24

  25. Slide 25: 2023 Mineral Resource Estimate by Mineralization

    2023 Mineral Resource Estimate by Mineralization Mineral Resource Category and Quantity CuT CuS CuT CuS Type (kt) (%) (%) (t) (t) Measured Brochantite 31,293 0.62 0.45 194,890 141,442 For personal use only Chrysocolla 24,252 0.44 0.33 105,594 79,863 Wad/Black oxides 10,727 0.29 0.15 30,599 16,116 Mi

  26. Slide 26: Marimaca Copper – Commitment to Sustainability

    Marimaca Copper – Commitment to Sustainability Health, Safety and Security Constructive Stakeholder The health, safety and wellbeing of our Engagement employees is at the forefront of We value the trust and support from our For personal use only everything we do. We implement the local stakeholders.

  27. Slide 27: For personal use only

    For personal use only CHILE’S NEW COPPER DISCOVERY Advancing Development With District Scale Potential CHILE’S NEW COPPER DISCOVERY 27 Advancing Development With District Scale Potential

Marimaca Copper — Investor Presentation (April 2025) on 6ix