Nhpc Limited · NSE:NHPC

Nhpc — Investor Presentation (August 2021)

38 slides from Nhpc's investor presentation, Aug 16, 2021

  1. Slide 1: Cover letter to stock exchanges: Presentation made by Company

    tfwftrrltff'Ht\3"W'l)f(;f flf~s (mffi '<'l'(CJ)f '( Cf)l NHPC Limited (A Government of India Enterprise) tfiR/ Phone :________________ _ m ~. I Ref. No~H/CS/199/ ----------------- . 16.08.2021 ~I Date :________________ _ Manager General Manager The Listing Department, The Listi ng Department M/s BSE

  2. Slide 2: Investor Presentation Financial Year 21-22: June 2021

    Clean Power For Every Home INVESTOR PRESENTATION FINANCIAL YEAR 21-22 : June 2021 Salal Power Station, J&K

  3. Slide 3: Presentation Outline

    Presentation Outline 2 NHPC Today Financial Highlights Financial Ratios Other Business Initiatives Projects At Glance Our Vision: To be a global leading organization for sustainable development of clean power through competent, responsible and innovative values.

  4. Slide 4: NHPC Today

    NHPC-Today 3 Subansiri Lower Project Teesta V, Sikkim NHPC-Energising India With Hydropower

  5. Slide 5: Physical Snapshot

    PHYSICAL SNAPSHOT 4 Ratle Kishanganga Chutak Installed • Incorporated in 1975 with authorised capital of Rs. 200 crore, Uri II Uri I Nimoo Bazgo Kiru the present authorised capital is Rs.15000 crore (Paid Up Pakal Dul Capacity Salal J&K Dulhasti Capital Rs.10,045 crore) Baira Siul Sewa II Chamera II

  6. Slide 6: Physical Snapshot

    PHYSICAL SNAPSHOT  Power Stations under Operation-22 Nos. 5 (5551 MW*) Hydro Power is 12% (46322 MW) of Installed  Power Stations with Subsidiary (NHDC) - 2 Nos. All India Installed Capacity (384116 MW**) . Capacity (1520 MW)  Total Operational Projects – 24 Nos. (7071 MW) NHPC Contribution is 15

  7. Slide 7: NHPC's Track Record – A Ten Year Digest

    NHPC ‘s Track Record – A Ten Year Digest 6 Standalone Generation (in M.U.) Actual Q1 FY’22 Actual Q1 FY’21 Installed Capacity 24410 26126 24235 23683 23275 22973 22038 •Country 18923 •Country 18683 18386 Generation Generation 219 BU* 277 BU Under Construction •Share of Hydro •Share of Hydro Power 41

  8. Slide 8: Financial Highlights

    7 Financial Highlights Sewa II, J&K Chamera I, Himachal Clean Power For Every Home

  9. Slide 9: Financial Highlights: Standalone

    Financial Highlights : Standalone Particulars FY’22 Qtr-1 FY’21 Qtr-1 % Change Qtr-1 8 Rs. In Crore Revenue from Operation Revenue & Expenditure-Analysis 2170.21 2518.87 -13.84 Revenue Q1 FY’22 Expenditure Q1 FY’22 Other Income Other Employ 203.05 85.95 136.24 ees Income Other Expenses, Benefits Tot

  10. Slide 10: Statement of Assets & Liabilities

    Statement of Assets & Liabilities Rs. In Crore Equity and Liabilities Q1 FY’22 9 FY’21 Share Holder’s Funds 32587.01 31647.31 Loan Funds-Long Term 21170.03 21241.22 Deferred Tax Liabilities 3596.91 3589.36 Other Long term Liabilities & Provisions 4121.83 4117.32 Current Liabilities & Provisions 6300

  11. Slide 11: Debtors Position

    Debtors Position Rs. In Crore Total Debtors (in Crs.) 10 S. N. Particulars As on As on As on As on As on 30.06.2021 31.03.2021 31.12.2020 30.09.2020 30.06.2020 1 Trade Receivables 4062 3206 4059 4860 4442 2 More than 45 days* 2429 1804 3233 3574 3434 Top Five Debtors* (in Crs.) Name 30.06.2021 31.03

  12. Slide 12: Incentives Position

    Incentives Position 11 Comparative Incentive YoY (in Crs.) Rs. In Crore Sl. Particulars FY21-22 FY20-21 Q-1 Q-2 Q-3 Q-4 Total Q-1 Q-2 Q-3 Q-4 Total 1 Secondary 0.00 - - - 0.00 0.00 22.80 46.88 146.93 216.61 Energy 2 Incentives 134.64 - - - 134.64 148.25 136.54 75.11 49.74 409.64 3 Deviation 38.03 -

  13. Slide 13: Key Financials: Q1 FY'22

    Key Financials : Q1 FY’22 P&L Standalone Balance Sheet Standalone 12 ` In Crore Total Income 2373 Share Capital 10045 EBITDA 1483 Net worth 32587 EBITDA Margin 62% Long Term Debt 21170 PAT 912 Cash & Bank Bal. 765 Profit Margin 38% Gross Block 38777 Dividend Pay Out (FY‘21) Rs. 1.60 Per Share/ 50% o

  14. Slide 14: NHPC – Key Ratios

    NHPC – Key Ratios S. No. Particulars Q1 FY’22 FY’21 13 Particulars Standalone Consolidated Standalone Consolidated 1. PAT (Rs. in Cr.) 912.26 907.77 3233.37 3257.00 2. Net-worth (Rs. in Cr.) 32587.01 34025.16 31647.31 33090.29 3. No. of Equity Shares (In Cr.) 1004.50 1004.50 1004.50 1004.50 4. EPS (

  15. Slide 15: NHDC Ltd. (Subsidiary) – Snapshots: FY 20-21

    NHDC Ltd. (Subsidiary) – Snapshots : FY 20-21 Shareholding Pattern : 51:49 (NHPC : GoMP) 14 Physical Performance 93.64% 94.32% 94.82% Installed Capacity : 1520 MW 4,749 5,000 4,110 4,236 96% 93.89% 95% 4,000 90.64% 94% 3,000 1,325 93% Design Energy : 2092.76 MUs 1,921 92% 2,000 91% 1,000 90% 89% Gen

  16. Slide 16: NHPC – Capacity Addition & Regulated Equity (Hydro)

    NHPC – Capacity Addition & Regulated Equity (Hydro) Progressive Capacity Addition 15 Progressive Regulated Equity 25000 21932 Cap. Add. 23-24/ 8251 MW Cuml. Cap. 2000 20000 15934 Subansiri Lower : 2000 MW 15000 12965 Cap.Add. 22-23/ 6251 MW Cuml. Cap. 800 MW 10000 5998 Parbati II : 800 MW 5000 2969

  17. Slide 17: NHPC – CAPEX

    NHPC – CAPEX F.Y Amount (Rs. In Remarks 16 Crore) 2014-15 2615 (Actual) 2015-16 2793 (Actual) 2016-17 2438 (Actual) 2017-18 2722 (Actual) 2018-19 2213 (Actual) 2019-20 4155 (Actual) 2020-21 3568 (Actual) 2021-22 9104 (BE)

  18. Slide 18: NHPC – Major Highlights during the period

    NHPC – Major Highlights during the period 17  Ministry of Power vide letter dated 28.06.2021 conveyed its 'No objection' for setting up of 600 MW Solar Project in EPC Mode by NHPC inside Ultra Mega Renewable Energy Power Parks (UMREPP) scheme subject to approval of Government as per extant rules. 

  19. Slide 19: Renewable Energy: Solar Energy

    18 Renewable Energy  Solar Energy Clean Power For EVERY HOME

  20. Slide 20: Renewable Energy

    Renewable Energy A (i) Standalone (Ownership Based) 19 (a) Works Awarded Expected Capacity Estimated S.No Name of Project Commissioning Tariff (Rs./unit) Status of PPA (MW) Capital cost Schedule 1 Solar Power Project, 40 178.00 2022-23 2.75 PPA Signed with GRIDCO Ganjam (Odisha) Total-(a) 40 178.00

  21. Slide 21: Renewable Energy

    Renewable Energy 20 A (i) Standalone (Ownership Based) (c) Under Pipeline Expected Capacity Estimated Tentative Tariff S.No Name of Project Commissioning Status of PPA (MW) Capital cost (Rs./unit) Schedule 1 Solar Power Project, 100 480.00 2022-23 3.25 Consent for PPA requested Deogarh (Odisha) from

  22. Slide 22: Renewable Energy

    Renewable Energy 21 A (ii) Standalone (As Intermediary Procurer) (a) Works Awarded Expected Capacity Estimated S.No Name of Project Commissioning Tariff (Rs./unit) Status of PPA (MW) Capital cost Schedule 1 Projects through Solar 2000 0.00 2022-23 2.55 (1600 MW) PPA and PSA signed. Tariff Power Deve

  23. Slide 23: Renewable Energy

    Renewable Energy 22 B. JV Mode (a) Works Awarded Expected Capacity Estimated Tentative Tariff S.No Name of Project Commissioning Status of PPA (MW) Capital cost (Rs./unit) Schedule 1 Solar Power Project, Kalpi 65 312.00 2021-22 3.02 In process with UPPCL (UP) (JV-BSUL) Total- (a) 65 312.00 (b) Tende

  24. Slide 24: Renewable Energy

    Renewable Energy 23 B. JV Mode (c) Under Pipeline Expected Capacity Estimated Tentative Tariff S.No Name of Project Commissioning Status of PPA (MW) Capital cost (Rs./unit) Schedule 1 Solar Park, Jalaun (U.P.) 1200 840.00 2023-24 To be To be explored subsequently under UMREPP (JV-BSUL) discovered To

  25. Slide 25: NHPC Projects At A Glance

    24 NHPC Projects At A Glance NHPC-Energising India With Hydropower

  26. Slide 26: NHPC – Projects in Operation

    NHPC – Projects in Operation 25 Installed Design Tariff NHPC Project & Year of Capital Cost S. No Capacity Energy (18-19) Type of the project State/UT comm. as on 31.03.21 (MW) (MU) (Rs. /Kwh)* 1 Baira Siul (3x60) 180 779.28 1981 204.86 2.04 Run of River (ROR) with small Himachal Pradesh (Sep) ponda

  27. Slide 27: NHPC – Projects in Operation… contd.

    NHPC – Projects in Operation… contd. S.No. NHPC Project Installed Capacity Design Energy Year of Capital Cost Tariff (18-19) 26 Type of the project Comm. as on 31.03.21 (Rs. /Kwh)* (MW) (MU) 11 Teesta-V, (3x170) 510 2572.70 2008 2839.85 2.33 ROR with small pondage Sikkim (Mar) 12 Sewa-II, (3x40) 120

  28. Slide 28: NHPC – Projects in Operation… contd.

    NHPC – Projects in Operation… contd. Renewable Energy 27 Installed Design Capital Cost Year of Tariff 20-21 S.No Project Capacity Energy as on Place of Project Comm. (Rs./unit) (MW) (MU) 31.03.2021 1 Wind Power 50 94.25 2016 330.40 3.67 Lakhmana, Jaisalmer 2 Solar Power 50 105.96 2018 290.59 4.41 Th

  29. Slide 29: NHPC: Projects Under Construction

    NHPC: Projects Under Construction Project Under Construction-Standalone 28 Provisional Installed CCEA Estimated Anticipated Project Expected Design Type of the NHPC Project Capacity Cost (Rs. Crore) Project Cost (Rs. Expenditure till Commissioning Energy (MU) project (MW) (Price Level) Crore) –June’

  30. Slide 30: NHPC: Projects Under Construction

    NHPC: Projects Under Construction Project Under Construction-JV 29 Provisional Installed CCEA Estimated Anticipated Project Expected Design Type of the NHPC Project Capacity Cost (Rs. Crore) Project Cost (Rs. Expenditure till – Commissioning Energy (MU) project (MW) (Price Level) Crore) June’21 (Rs.

  31. Slide 31: NHPC Standalone Projects Under Clearance

    NHPC Standalone Projects Under Clearance 30 Installed Design Cost S.No. Projects Capacity Energy (In Crore) Status (MW) (MUs) & PL 1 Teesta-IV 520 2252 6113 • All statutory clearances have been received except forest clearance (stage-II). (4x130) (Apr’21) • FRA Compliance is underway. (Sikkim) • App

  32. Slide 32: NHPC Standalone Projects Under Clearance

    NHPC Standalone Projects Under Clearance 31 Installed Design Cost S.No. Projects Capacity Energy (In Crore) Status (MW) (MUs) & PL 5 Bursar 800 1924 25774 • DPR has been submitted to CEA on 06.01.17 & is under examination at CEA/CWC. (UT of J&K) (Aug’19) • Defence clearance, wildlife clearance has b

  33. Slide 33: NHPC – JV Projects Under Clearance

    NHPC –JV Projects Under Clearance Projects Under JV S. Projects Installed Capacity Design Cost (In Cr.) Status 32 No (MW) Energy (MUs) & PL • All clearances are available. UT of JK has conveyed its approval vide letter dated 11.11.2020 for exemptions of free power & water usage charges for first 10

  34. Slide 34: NHPC – JV Projects Under Clearance

    NHPC –JV Projects Under Clearance Projects Under JV Installed Design Cost (In Cr.) & 33 S.No Projects Status Capacity (MW) Energy (MUs) PL Foreign Assignment Under JV Scheme 1 Chamkharchhu (Bhutan) 770 3344 7021 • Project to be developed by JVC of NHPC and DRUKGreen Power Corporation, (Dec 16) Bhuta

  35. Slide 35: NHPC – Subsidiary Company's Project Under Clearance

    NHPC –Subsidiary Company’s Project Under Clearance 34 Projects Under Subsidiary Installed Design Cost (In S.No Projects Status Capacity (MW) Energy (MUs) Cr.) & PL 1 Loktak D/S 66 333.76 1311  All statutory clearances of project except CCEA are available. (2x33) Manipur (Jul 20)  Tendering of all

  36. Slide 36: NHPC – Projects Under Survey & Investigation

    NHPC –Projects Under Survey & Investigation S. No. Projects State Installed Capacity Status 35 (MW) Projects Under FR/DPR Preparation 1 Garba Tawaghat Uttarakhand 630 • Implementation of the project is held up due to the following reasons: a) To take up the matter at appropriate forum for obtaining

  37. Slide 37: NHPC – Projects Under Survey & Investigation

    NHPC –Projects Under Survey & Investigation 36 Installed S. No. Projects State Capacity Status (MW) Projects Under FR/DPR Preparation 3 Uri-I Stage-II UT of Jammu & 240 • MOU has been signed between NHPC Ltd. and JKSPDCL on Kashmir 03.01.2021. • The project shall be executed by NHPC on BOOT basis fo

  38. Slide 38: NHPC-Energising India With Hydropower

    37 NHPC-Energising India With Hydropower