Entergy Corporation · NYSE:ETR

Entergy — LPSC Staff's Technical Conference and ESI's Bidders' Conference for the Summer 2008 RFP

6 slides from Entergy's conference presentation, Jun 19, 2008

  1. Slide 1: Independent Monitoring of Entergy Summer 2008 RFP

    Independent Monitoring of Entergy Summer 2008 RFP Presented by: David B. Patton, Ph.D. President, Potomac Economics LPSC Staff’ Staff’s Technical Conference and ESI’ ESI’s Bidders’ Bidders’ Conference for the Summer 2008 RFP June 19, 2008

  2. Slide 2: Roles of the Independent Monitor (IM)

    Roles of the Independent Monitor (IM) • The independent monitoring role is intended to provide objective, objective, third- third- party perspective in two broad areas: 1. Monitoring the evaluation of proposals, including: – Review of the design of the evaluation process and criteria in the the Summ

  3. Slide 3: IM Involvement in RFP Phases

    IM Involvement in RFP Phases The IM function requires active participation in all six of the RFP phases: 1. RFP Design – Review and comment on ESI’ ESI’s draft RFP documents; – Participate in all technical and bidders’ bidders’ conferences; 2. Proposal Solicitation Process – Monitor the implementati

  4. Slide 4: IM Involvement in RFP Phases (cont'd)

    IM Involvement in RFP Phases (cont’d) 4. Proposal Evaluation and Selection – Oversee proposal evaluation and selection to ensure the process is objective and impartial to all bidders; – Review qualitative and quantitative analyses including studies by by the Entergy Transmission Analysis Group and t

  5. Slide 5: Process Monitoring

    Process Monitoring • Throughout all RFP phases the IM will be ensuring that: - The RFP process is conducted in a fair and impartial manner, and no undue preference is given to any bidder; - Appropriate confidentiality is maintained; and - Records and information are properly managed and stored. • To

  6. Slide 6: Contact Information

    Contact Information • RFP questions/issues should be directed to the RFP administrator at esirfp@entergy.com. esirfp@entergy.com. – The IM will receive a copy of all emails. – Questions will be redacted and forwarded to Entergy staff. • To directly contact the IM, please call Steve Surina at (703) 3

Entergy — LPSC Staff's Technical Conference and ESI's Bidders' Conference for the Summer 2008 RFP on 6ix