AGL Resources — Corporate Update (May 2010)
19 slides from AGL Resources's corporate update, May 10, 2010

Slide 1: Pivotal Energy Development
Pivotal Energy Development Dana Grams President

Slide 2: Forward-Looking Statements
Forward-Looking Statements Certain expectations and projections regarding our future performance referenced in this presentation, in other reports or statements we file with the SEC or otherwise release to the public, and on our website, are forward-looking statements. Senior officers and other empl

Slide 3: Nymex Monthly Continuation
Nymex Monthly Continuation May 6, 2010 Nymex Forward Curve May 6, 2010 Nymex Monthly Volatility 1990-2010 April 5, 2010 Fundamentals of the Marketplace

Slide 4: Proposed USGC LNG Terminals
Proposed USGC LNG Terminals Natural Gas Storage Capacity Supply - Demand Balance U.S. Domestic Shale Production Extended Economic Slowdown Environmental Policy Domination Domestic Energy Policy Moderate Policies U.S. LNG Imports under Alternative Scenarios Extended Economic Slowdown Environmental Po

Slide 5: Fundamentals of the Marketplace
Fundamentals of the Marketplace • Market is cyclical • Supply basins are shifting – Canada and Gulf of Mexico in decline – Shale and tight sands increasing • Deliverability characteristics of new unconventional production are more challenging • Infrastructure need is real (pipeline, treating, proces

Slide 6: Storage Additions Lag Behind Use
Storage Additions Lag Behind Use

Slide 7: Golden Triangle Program Overview
Beaumont Disposal Line • Two caverns of 12 Bcf working gas capacity • Injection/Withdrawal - 300/600 MMcf/d • 14,205 Hp of compression • 6 pipeline interconnections – Kinder Morgan, Centana, Golden Pass, Houston Pipe Line, Texas Eastern, Florida Gas • 9 miles of twin 24-inch pipeline • In service -

Slide 8: Golden Triangle Storage
Golden Triangle Storage • Pipeline – 80% complete – Passed FERC inspection – Completing bores and directional drills • Meter Stations – 30% complete – June-August expected completion dates • Compressors – 65% complete – Expected in-service date of July 2010

Slide 9: Golden Triangle Cavern Progress
Three Dimensional Sonar Picture 1250 Ft Empire State Building Golden Triangle Cavern Progress Cavern 1 • Leaching continues at rates ~3,900 gpm • Cavern size estimated to be 8.0 MM barrels by August 1 st • Leaching scheduled to end June 1 st - conversion activities to commence • Sonar completed Febr

Slide 10: Transition to Commercial Operations
Fresh Water In Fresh Water In Cavern Creation • Always full of water as it grows Salt Surface Open Brine Out Cavern Creation • Always full of water as it grows Salt Surface Open Brine Out Cavern Creation • Always full of water as it grows • Conversion to commercial operations - gas displaces water S

Slide 11: Golden Triangle Storage Schedule
Today Project risk is significantly eliminated Golden Triangle Storage Schedule

Slide 12: Golden Triangle Construction
Compressors MCC Building Compressor Piping & Conduit Gas Coolers Golden Triangle Construction

Slide 13: Golden Triangle Construction
Pipeline Route-of-Way Cavern 2 Wellhead 24” Header Pipeline Golden Triangle Construction

Slide 14: Jefferson Island Expansion
: 10.0 MMDth : 7.5 MMDth : 2 : 360 MDth/Day : 600 MDth/Day : 9 : 15 miles dual 16” Existing Configuration : 37 MMDth : 17 - 28 MMDth : 4 : 660 MMcf per Day : 1,320 MMcf per Day : 12 : Additional Pipeline Maximum Expanded Configuration Jefferson Island Expansion • Total Capacity • Working Gas • Numbe

Slide 15: Jefferson Island Timeline
• Settled mineral lease dispute with State of Louisiana via operating agreement • Entered “Stage Gate One” of Asset Development Process • Expect to submit permit applications • Permits anticipated, prep for construction, detailed engineering • Expected start-up of operations, Cavern 3 • Cavern 1 exp

Slide 16: Jefferson Island Program Overview
Jefferson Island Program Overview Project A – Obtain permits for Cavern 3 & 4 – Complete raw water and disposal well facility – Upgrade leach plant – Solution mine Cavern 3 adding 6 Bcf working gas Project B – Expand Caverns 1 & 2, adding 3.5 Bcf of working gas capacity – Replace wellheads and leach

Slide 17: Where We Are Going
Where We Are Going • Proceeding with measured expansions • Geographic diversity • Increase optionality • Long-term portfolio value

Slide 18: AGL Resources Advantages
AGL Resources Advantages • Long-term player • Well-capitalized • Good locations • Speed to market • Low-cost expansion opportunities • Strong customer focus • Experienced management team / sustainable organization

Slide 19: Opportunities Just Beginning
Opportunities Just Beginning • Storage fundamentals remain strong – Natural gas market is growing – Significant barriers now exist to develop new storage • Uncertainty remains challenging – Credit markets - Commodity price – Inflation - Market participates – Interest rates - Renewable energy sources
Source: SEC EDGAR · 8-K filed May 10, 2010
More decks from AGL Resources Inc
Merger or Acquisition (August 2015)12 slides · Aug 24, 2015
Investor Day (March 2015)89 slides · Mar 25, 2015
Q4 2014 Earnings Presentation26 slides · Feb 12, 2015
Q3 2014 Earnings Presentation24 slides · Nov 10, 2014
Q2 2014 Earnings Presentation19 slides · Jul 30, 2014
Q1 2014 Earnings Presentation19 slides · Apr 29, 2014