TransGlobe Energy Corporation

TransGlobe Energy — Investor Presentation (May 2016)

24 slides from TransGlobe Energy's investor presentation, May 2016

  1. Slide 1: TransGlobe Energy Corporate Presentation May 2016

    TRANSGLOBE ENERGY CORPORATE PRESENTATION MAY 2016

  2. Slide 2: Cautionary Statement

    CAUTIONARY STATEMENT This presentation may include certain statements that may be deemed to be “forward-looking statements” within the meaning of the U.S. Private Securities Litigation Reform Act of 1995. Such statements relate to possible future events. All statements other than statements of histo

  3. Slide 3: About TransGlobe

    ABOUT TRANSGLOBE Operations in Egypt began in 2004 • Currently 100% of production Alexandria Suez Proven track record with extensive Cairo International experience Extensive and diversified portfolio of development and exploration Egypt opportunities Focused on building a diversified International p

  4. Slide 4: Undervalued with Balance Sheet Strength

    UNDERVALUED WITH BALANCE SHEET STRENGTH CAPITAL STRUCTURE (US$) Shares Outstanding (10/05/16) ~72.2 Million Market Capitalization (10/05/16) $140.1 Million Debt (31/03/16) $66.5 Million Working Capital (31/03/16) $75.2 Million Enterprise Value ~$64.9 Million RESERVES 2P Reserves (31/12/15) 28.7 MMBb

  5. Slide 5: Q1 2016 Financial Highlights

    Q1 2016 FINANCIAL HIGHLIGHTS  Sales volumes averaged 14,126 bopd in Q1  Production volumes averaged 12,058 bopd in Q1  Inventory at end of the quarter was 734,872 barrels of entitlement oil  Completed one direct sale tanker lifting of TransGlobe’s entitlement oil for net proceeds of $10 million

  6. Slide 6: Oil Marketing

    OIL MARKETING • Marketing has improved liquidity, $140,000 EGPC AR Outstanding decreased credit risk and $120,000 $100,000 resulted in West Bakr production $80,000 being sold at market price $60,000 $40,000 • TransGlobe marketed and sold $20,000 1,601,038 barrels during 2015 $0 Dec-14 Mar-15 Jun-15

  7. Slide 7: Netback Sensitivity to Oil Prices

    NETBACK SENSITIVITY TO OIL PRICES 25.00 $20.42 20.00 $15.76 15.00 Netback $11.11 10.00 $6.45 5.00 $1.79 0.00 $40.00 $50.00 $60.00 $70.00 $80.00 Brent Oil Price Per Bbl Assumptions: • Total Company production equal to Q1-2016 production (West Gharib: 8,271 bopd and West Bakr: 5,084 bopd) • Ras Gharib

  8. Slide 8: Current Daily Production

    CURRENT DAILY PRODUCTION TRANSGLOBE TOTAL DAILY 20,000 Production (bopd) 15,000 10,000 5,000 East Ghazalat West Bakr West Gharib 0 May-15 Jul-15 Sep-15 Nov-15 Jan-16 Mar-16 May-16 Q1 – 12,058 BOPD APR – 11,379 BOPD Q2 EST – ~10,800 BOPD 8

  9. Slide 9: 2016 Plan

    2016 PLAN • Focus on cost reduction and optimization to improve the cost structure across the business • Deliver the 2016 exploration drilling program of up to 22 exploration wells in a cost effective, safe and environmentally responsible manner • Map and evaluate the new South Ghazalat 3D and prepa

  10. Slide 10: 2016 Production Recovery Plan

    2016 PRODUCTION RECOVERY PLAN Target: • Arrest current declines and increase production in Eastern Desert through Q4 2016 Components: • Replace worn pumps to optimize producers • Reactivate/workover shut in wells • Recompletions & facility upgrades • Development drilling (K-South, others) • Developm

  11. Slide 11: Investment Highlights

    INVESTMENT HIGHLIGHTS 1.5 Million gross acres of land • 2016 Exploration focus  8 Projects in Egypt (100% WI)  In Eastern Desert, drill up to 22 exploration prospects Strong balance sheet with net working  In Western Desert, interpret new 3-D in South capital of $75.2MM (31/03/16) Ghazalat and pr

  12. Slide 12: Eastern Desert Exploration Program

    EASTERN DESERT EXPLORATION PROGRAM Red Bed Prospects • 8 prospects (COS 17% avg) • 4-12 mmbbls prospective resource** NWG 29 - Drilling (1st well in 2016 program) Miocene Clastic Prospects • 8 prospects (COS 32% avg) • 2-8 mmbbls prospective resource** Pre-Rift Prospects • 6 prospects (COS 18% avg)

  13. Slide 13: West Gharib/West Bakr: 100% WI - Operated

    WEST GHARIB/WEST BAKR: 100% WI - OPERATED Eastern Desert Production • Q1-2016 – 12,058 Bopd • Q2-2016 Est - ~10,800 Bopd 2016 Plan • Optimization and cost reduction • Integration of the West Bakr and West Gharib JV’s • Maintenance/optimization projects • K South development at West Bakr  Drilled K-

  14. Slide 14: NW Gharib: 100% WI - Operated

    NW GHARIB: 100% WI - OPERATED NWG #3 2016 Plan • Progress three (NWG #1, #3 & #5) oil developments toward first NWG #1 production in late 2016 1st 2016 Exploration • ~500-900 Bopd initial NWG Well production potential* #5 • Drill up to 13 new exploration prospects NWG SWG * Internally estimated 14

  15. Slide 15: Eastern Desert Development - K South Plan

    EASTERN DESERT DEVELOPMENT-K SOUTH PLAN • South K OOIP: ~ 55 MMbo • Production to date: 5.8 MMbo (10.5% recovery) • Drilled K-48 in April  Cased as Asl A oil well  Encountered 33 meters (108 ft.) net oil pay* K-48  Targeting production in Q2 • Two additional K-South wells in the plan for 2016 • I

  16. Slide 16: Egypt Assets: Western Desert

    EGYPT ASSETS: WESTERN DESERT • Three operated concessions • Map & evaluate the 2015 South Ghazalat 3-D • Prepare for NW Sitra 3-D seismic acquisition program 16

  17. Slide 17: Western Desert Exploration - NW Sitra & S. Ghazalat

    WESTERN DESERT EXPLORATION – NW SITRA & S. GHAZALAT: 100% WI - OPERATED S. Ghazalat • Awarded in 2013 • Aquired 3-D in 2015 2016 Plan: • Map and prepare prospect inventory S. Ghazalat for 2017 drilling N.W. Sitra NW Sitra • Awarded in 2014 • Ratified January 2015 • 3-D seismic in late 2016/17 Total

  18. Slide 18: South Ghazalat Seismic Dip Line

    SOUTH GHAZALAT SEISMIC DIP LINE Rift Margin Edge Several structures along rift margin • Excellent quality data from & Tertiary Seal U. Cretaceous 2015 3D acquisition • The rift margin is well imaged with good data to Jurassic U. Cretaceous Reservoirs level • Early work is showing several structures

  19. Slide 19: South Ghazalat Seismic Strike Line

    L. Jurassic U. Cretaceous U. Cretaceous Cretaceous Reservoirs & Tertiary Seal Reservoirs Reservoirs 19 SOUTH GHAZALAT SEISMIC STRIKE LINE L. Jurassic Cretaceous Reservoirs Reservoirs U. Cretaceous U. Cretaceous Reservoirs & Tertiary Seal

  20. Slide 20: Summary

    SUMMARY Opportunity rich Attractive valuation Average Q1 production of ~12,058 Bopd Strong balance sheet, $75.2MM positive working capital @ March 31st, 2016 $122.0MM in cash @ March 31st, 2016 Growth potential with a large drilling campaign in 2016 and 2017 20

  21. Slide 21: Executives and Directors

    EXECUTIVES AND DIRECTORS • Robert G. Jennings - Director, Chairman • Ross G. Clarkson - Director, President and CEO • Lloyd W. Herrick - Director, VP and COO • Geoffrey C. Chase - Director • Fred J. Dyment - Director • Susan MacKenzie - Director • David Cook - Director • Bob MacDougall - Director •

  22. Slide 22: Analyst Coverage

    ANALYST COVERAGE • David Popowich, CIBC, Calgary, Canada • David Phung, Credit Suisse Securities, Calgary, Canada • David Dudlyk, Dundee Capital Markets, London, UK • Darren B. Engels, First Energy Capital Corp., Calgary, Canada • Ian Macqueen, Paradigm Capital, Calgary, Canada • Kimberly Hedlin, Ca

  23. Slide 23: Concession Summary

    CONCESSION SUMMARY Concession Size Working Year Concession First Production (acres) Concession Interest Gross/Net Acquired Type Date West Gharib 100% 24,035 2007 Development January 2000 NW Gharib 100% 148,300 2013 Exploration N/A SW Gharib 100% 48,000 2013 Exploration N/A SE Gharib 100% 125,000 201

  24. Slide 24: For additional information contact us

    For additional information contact us at: Phone: +1 (403) 264 9888 Email: investor.relations@trans-globe.com Or visit: www.trans-globe.com

TransGlobe Energy — Investor Presentation (May 2016) on 6ix