Altoro Metals Limited · ASX:ARO
Altoro Metals — Variscan Mines — Corporate Update (June 2021)
24 slides from Altoro Metals's corporate update, Jun 21, 2021
Slide 1: Investor Presentation – ASX Announcement 21 June 2021
ASX Announcement – 21 June 2021 INVESTOR PRESENTATION Variscan Mines Limited (“Variscan” or the “Company” or the “Group”) (ASX:VAR) attaches a Presentation provided on an Investor conference call (refer ASX 15 June 2021). ENDS This announcement has been authorised for issue by Mr Stewart Dickson, Ma
Slide 2: Investor Webinar: San Jose Drilling Results Update
Investor Webinar San Jose Drilling Results Update
Slide 3: Disclaimer
DISCLAIMER This document is for information purposes only. It is not a prospectus, disclosure document or offering document under Australian law or under any other law and does not constitute an offer or invitation to apply for securities. In particular, this presentation is not an offer of securiti
Slide 4: Variscan in Cantabria
VARISCAN IN CANTABRIA
Slide 5: High Grade Spanish Zinc Projects
HIGH GRADE SPANISH ZINC PROJECTS | ASX:VAR 4
Slide 6: Novales-Udias Project – Cantabria, Northern Spain
NOVALES-UDIAS PROJECT – CANTABRIA, NORTHERN SPAIN THICK HIGH GRADE MVT MINERALISATION SUPPORTIVE 9KM FROM REOCIN ZINC-LEAD SIGNIFICANT REGIONAL MINE DRILL RESULTS EXPLORATION UPSIDE GOVERNMENT & 62MT @ 8.7%ZN POLICIES GLENCORE SMELTER POTENTIAL MINE STRATEGIC SUPPLY DEEP WATER PORT STRONG MINING RE-
Slide 7: Substantial Trends Delineated in Proven Mining District
SUBSTANTIAL TRENDS DELINEATED IN PROVEN MINING DISTRICT | ASX:VAR ASX 30 April 2021 6
Slide 8: San Jose Mine
SAN JOSE MINE
Slide 9: Exploration & Mining Licences Located on the Reocín Formation
EXPLORATION & MINING LICENCES LOCATED ON THE REOCÍN FORMATION | ASX:VAR ASX 30 April 2021 8
Slide 10: San Jose Mine – Historic Production (1970-1988)
SAN JOSE MINE -– HISTORIC PRODUCTION (1970-1988) +9% Zn Avg. 6.3% Zn +3.3% Pb | ASX:VAR 9
Slide 11: San Jose Mine – Putting in Context with Today
SAN JOSE MINE – PUTTING IN CONTEXT WITH TODAY SAN JOSE COMPARABLE Zn-Pb HEAD GRADES TO WORLD CLASS CURRENT OPERATIONAL MINES Avg. 6.9% Zn Avg. 2.3% Pb Source: Company Reports, Mining Data Solutions. Some data from CY2019 | ASX:VAR 10
Slide 12: San Jose Mine – Local Infrastructure Is in Place
SAN JOSE MINE - LOCAL INFRASTRUCTURE IS IN PLACE ROAD ACCESS OFFICE CORE SHACK ELECTRIC GRID CONNECTION WORKSHOP MINE ENTRANCE ROAD ACCESS | ASX:VAR 11
Slide 13: 3D Laser Survey Showed Positive Drill Intersections Remaining
3D LASER SURVEY SHOWED POSITIVE DRILL INTERSECTIONS REMAINING | ASX:VAR ASX 23 November 2020 12
Slide 14: Drilling Campaign
DRILLING CAMPAIGN
Slide 15: Underground Drilling Results at La Caseta & 168-177 Trends
UNDERGROUND DRILLING RESULTS AT LA CASETA & 168-177 TRENDS DDH NOVDD027: 16.9m @ 12.5% Zn + 2.0% Pb DDH NOVDD028: 15.6m @ 3.2% Zn + 0.3% Pb DDH NOVDD025: 7.0m @ 8.3% Zn + 0.1% Pb DDH NOVDD017: 5.0m @ 14.2% Zn + 4.3% Pb DDH NOVDD015: 5.0m @ 11.4% Zn + 2.8% Pb DDH NOVDD018: 5.0m @ 16.5% Zn + 1.7% Pb D
Slide 16: Plan View of Selected Mineralised Intersections in La Caseta and 168-177 Trends
PLAN VIEW OF SELECTED MINERALISED INTERSECTIONS IN THE LA CASETA AND 168-177 TRENDS WITH MINERALISED TRENDS INDICATED | ASX:VAR ASX 15 June 2021 15
Slide 17: N-S Long-Section of Underground Drilling at La Caseta
N-S LONG-SECTION OF UNDERGROUND DRILLING AT LA CASETA DISCOVERY OF LOWER LENS | ASX:VAR ASX 15 June 2021 16
Slide 18: Benchmarking vs. Recent ASX Reported Zinc Drilling
BENCHMARKING VS. RECENT ASX REPORTED ZINC DRILLING | ASX:VAR Source: Company Reports 17
Slide 19: Underground Drilling Results at La Caseta
UNDERGROUND DRILLING RESULTS AT LA CASETA DDH NOVDD046: 23m @ 11.51% Zn + 3.72% Pb DDH NOVDD041: 18m @ 9.87% Zn + 3.24% Pb DDH NOVDD037: 11m @ 9.95% Zn + 5.58% Pb DDH NOVDD029: 12m @ 9.15% Zn + 4.03% Pb DDH NOVDD040: 21m @ 5.65% Zn + 0.70% Pb DDH NOVDD042: 9m @ 10.67% Zn + 1.76% Pb DDH NOVDD045: 9m
Slide 20: +400m Southward Extension of Discovery
+400M SOUTHWARD EXTENSION OF DISCOVERY | ASX:VAR ASX 15 June 2021 19
Slide 21: N-S Long Section of La Caseta – Lower Lens Strike Extended
N-S LONG SECTION OF LA CASETA – LOWER LENS STRIKE EXTENDED | ASX:VAR ASX 15 June 2021 20
Slide 22: Forthcoming Catalysts
FORTHCOMING CATALYSTS San Jose Mine • Assays pending • Follow up Underground drilling • Selected step out surface drilling • Refine mineralization model Buenahora • Surface drilling permits pending • Exploration of underground workings • Reprocess historic seismic survey data Guarajaz • Mapping • Ge
Slide 23: Stay Connected
STAY CONNECTED CONTACT THE MANAGING DIRECTOR stewart.dickson@variscan.com.au +44 7799694195 +61 8 93169100 info@variscan.com.au www.variscan.com.au Variscan Mines Limited Variscan Mines Cantabria, S.L. Suite 8, 7 The Esplanade Bo Ronaz, s/n Novales Mt Pleasant, Perth, WA 6153 39526 Alfoz de Ll
Slide 24: | ASX:VAR
| ASX:VAR 23