Slide 1: Inkerman Landfill Community Reference Group
Inkerman Landfill Community Reference Group Alternative Litter System Trial 29th November 2018
Slide 2: Alternative Litter System Trial
Alternative Litter System Trial Why change from Somernet system? • HSE risk • Mast can fall in high winds or contact with equipment • Can get bogged in wet conditions and require unsafe practices to move them • Nets cannot accommodate an increase in traffic and vehicle movements i.e. 15m separation
Slide 3: Alternative Litter System Trial
Alternative Litter System Trial • Additional control measures implemented include: • Improved primary litter net placement plan • Fill plan updated to include litter net placement • Purchased Litter Master 9000 vacuum • Increased frequency of manual litter pickers • Increased external boundary inspe
Slide 4: Daily Cover (Tarp Deployment Systems)
Alternative Litter System Trial Daily Cover (Tarp Deployment Systems) • Capital Application Approved and Purchase Order Raised • Reduced exposure to flagging • Litter in daily reclaimed cover • In use at MRL
Slide 5: Additional Litter Nets
Alternative Litter System Trial Additional Litter Nets • Seeking quotations for Capital Expenditure Application • Confident will be approved • Included in FY19 capital budget • Second line of defence • Finalising design specification with suppliers • Significant capital investment • Approximately 65
Slide 6: Alternative Litter System Trial
Alternative Litter System Trial • MRL 3.5km of nets currently being installed • Propose to use same supplier • Still to be tensioned and gaps eliminated • Semi permanent structure
Slide 7: Alternative Litter System Trial
Alternative Litter System Trial
Slide 8: Alternative Litter System Trial
Alternative Litter System Trial Prevailing wind direction & offsite litter locations used to plan net placement
Slide 9: Stage
STAGE ve | EXSTING Pad | STAGE 4 4 CELL e { EXISTING STAGE +s CELL 4 EXISTING Strom irr Peer BG tien WIN Cate de ok with Sonemats te wy ey, Are HN Me nee Gm nce ance Gn Fem amig — MAR Joa Wi wok fer @ true moe meaty, direction Com, the ball gent, LN compete PRON B& ten move into Rrex A once Paar BS
Slide 10: Summary of Trial Results
Alternative Litter System Trial Summary of Trial Results • First line of defence: Somernets • Set of 10 Somernets will be shifted to sandhill road once 6m nets installed • 2 sets of 5 nets will stay in close proximity to the active tip face • Second line of defence: 6m nets (Feb19-Mar19) • Additiona
Slide 11: Litter Collected
Alternative Litter System Trial Litter Collected
Slide 12: Summary of Trial Results
Alternative Litter System Trial Summary of Trial Results • Target Mass of litter controlled outside boundary > 1kg per week : • Extreme conditions reduce the effectiveness of the Alternative Litter System • Actual 0.45kg per week • 10 days > 1.0kg per week • Maintain current trend of litter complain