Kingsrose Mining Ltd · ASX:KRM
Kingsrose Mining — Investor Presentation (May 2018)
16 slides from Kingsrose Mining's investor presentation, May 21, 2018
Slide 1: Kingsrose Mining May 2018
For personal use only MAY 2018 | ASX: KRM
Slide 2: Disclaimer
DISCLAIMER 2 The information contained in this Presentation has been prepared by Kingsrose Mining Limited (“Kingsrose” or the “Company”). This Presentation does not constitute an offer or invitation to any person to For personal use only subscribe for or apply for any securities in the Company. Whil
Slide 3: Kingsrose at a Glance
KINGSROSE AT A GLANCE 3 High-grade, low-cost, revenue generative gold producer For personal use only Way Linggo open cut operating to plan, 85% interest in the with consistent production rates Way Linggo Project in South Sumatra, Permitting on track for open pit mining to Indonesia commence at Talan
Slide 4: Corporate Overview
CORPORATE OVERVIEW 4 Skilled board and management team with proven experience in For personal use only building and operating large scale mining operations Paul Jago Rod McIllree Key Statistics* (ASX:KRM) Managing Director Chairman • A mining engineer with more than 20 years’ • Geologist with more t
Slide 5: The Way Linggo Project
THE WAY LINGGO PROJECT 5 Prospective for low sulphidation epithermal gold deposits For personal use only Located on the Great Sumatran fault, which is part of the pacific rim of fire and highly prospective for high grade gold deposits Held under a 4th generation Contract of Work Area (‘CoW’) cov
Slide 6: 2017 Way Linggo Project Mineral Resource
2017 WAY LINGGO PROJECT MINERAL RESOURCE 6 High grade resource with significant expansion potential For personal use only Category Tonnes (Kt) Gold (Au) g/t Au Ounces Silver (Ag) g/t Ag Ounces (Koz) (Koz) Talang Santo Mine Measured 211 10.5 71 24 165 Indicated 312 11.2 112 21 207 Inferred 707 5.0 11
Slide 7: Way Linggo Mine
WAY LINGGO MINE 7 For personal use only IN First gold pour in August 2010 from underground mine – PRODUCTION operational until 2013 OPEN PIT February 2017 open cut mining commenced following approvals by the Indonesian Mines Department Mining was undertaken using a fleet of small equipment owned by
Slide 8: Talang Santo Mine
TALANG SANTO MINE 8 For personal use only PRODUCTION TO Discovered in June 2011, located 17km by an established all weather haul road from the Way Linggo processing plant COMMENCE Q3 2018 OPEN PIT Underground mining commenced July 2014 with the first gold shipment in mid-August 2014 Underground mini
Slide 9: FY2018 Production Overview
FY2018 PRODUCTION OVERVIEW 9 Ore Processed Units Sep 2017 Dec 2017 Mar 2018 Year to Quarter Quarter Quarter Date For personal use only Mine Production Way Linggo Ore Mined t 24,225 24,841 20,905 69,971 Waste bcm 121,919 120,866 353,025 595,810 Mine grade (gold) g/t 9.1 7.5 8.2 8.2 Mine grade (silver
Slide 10: FY2018 Processing Overview
FY2018 PROCESSING OVERVIEW 10 Consistently high recoveries For personal use only Ore Processed Units September 2017 December 2017 March Year to Quarter Quarter 2018 Date Quarter Tonnes Milled t 32,882 25,679 20,883 79,445 Head grade (gold) g/t 8.6 7.6 8.0 8.1 Head grade (silver) g/t 53 74 87 69 Reco
Slide 11: Development Pipeline
DEVELOPMENT PIPELINE 11 Potential for further significant gold discoveries For personal use only HIGH PRIORITY - robust short term opportunities Talang Toha Rawa Gabus Auger sampling and clay analysis completed over the two highest priority epithermal structures Results demonstrate strong si
Slide 12: Investment Case
INVESTMENT CASE 12 For personal use only High grade, revenue generative gold producer Multi-mine expansion potential Defined development plan to bring Talang Santo open pit on stream this year Established infrastructure with capacity to support future mine development Skilled board and management te
Slide 13: Contact Us
CONTACT US 13 For personal use only Kingsrose Mining Limited www.kingsrosemining.com.au + 61 8 9486 1149 info@kingsrosemining.com.au KINGSROSE MINING | MAY 2018
Slide 14: Appendix
APPENDIX 14 For personal use only KINGSROSE MINING | MAY 2018
Slide 15: A Responsible Producer
A RESPONSIBLE PRODUCER 15 For personal use only Community Environment Actively engaged with the community and Committed to minimising its environmental keep all community members and footprint through a number of initiatives, stakeholders updated as to the status of the including: Project’s oper
Slide 16: For personal use only
For personal use only