Quantum Graphite Ltd · ASX:QGL

Quantum Graphite — ShareCafe Small Cap "Hidden Gems" Webinar (February 2022)

11 slides from Quantum Graphite's conference presentation, Feb 11, 2022

  1. Slide 1: Investor Webinar Presentation

    MARKET RELEASE For Immediate Release 10 February 2022 Investor Webinar Presentation The Company is pleased to announce its participation in the ShareCafe Small Cap "Hidden Gems" Webinar, to be held Friday 11th of February 2022 from 12:30pm AEDT / 9:30am AWST. Managing Director Sal Catalano will prov

  2. Slide 2: Uley 2 Highlights

    DARY LOGO QUANTUM GRAPHITE ULEY 2 HIGHLIGHTS Q1 2022 EV Li-ion Long Batteries Duration Battery Storage Thermal Management www.quantumgraphite.com

  3. Slide 3: Quantum Graphite Limited Highlights

    Quantum Graphite Limited Highlights 560000 565000 Quantum Graphite is the ASX-listed owner of the century old 6150000 Uley graphite mine and the broader Mikkira Deposit located ML 5561 in South Australia’s Eyre Peninsula, one of the world’s largest ML 5562 natural coarse flake graphite deposits. RL

  4. Slide 4: The Uley 2 Project Overview

    The Uley 2 Project Overview Status: DFS completed for Uley 2 (Stage 1) Location: Eyre Peninsula, SA; 20km west-south-west of Port Lincoln Government approvals: All approvals obtained pursuant to Program for Environment Protection and Rehabilitation Stage 1 mine life: 12 years Mineral Resources or Re

  5. Slide 5: The Uley 2 (Stage 1) Project Technicals

    The Uley 2 (Stage 1) Project Technicals Uley 2 Mining Study and Feasibility delivers strong financial metrics Total undiscounted A$207million at a LOM TGC of cash flow 11.89% Crusher feed 500,000 tonnes per annum Graphitic carbon grade 11.89% Graphitic carbon recovery 84% Concentrate purity >97% gra

  6. Slide 6: The Uley 2 Graphite Products

    The Uley 2 Graphite Products Processing path and production profile for Uley 2 will focus on ultra high purity coarse flake of approximately 55,000 tonnes per annum, details of flake is set out below. Comprehensive met results confirm historical high quality production mix • Medium to Extra-Large Fl

  7. Slide 7: Uley 2 - A Multi Generation Project

    Uley 2 - A Multi Generation Project Excluding the other mineralised envelopes (within EL 6224) the Uley 2 Project is a multi generation project. Priority 1 Short Term Ore Reserve extension • Uley 2 South 50m • Infill drilling at Uley 3 (area bordered by blue dotted line) Priority 2 Medium Term Resou

  8. Slide 8: Sunlands Co. Joint Venture – Direct Participation in the New Energy Markets

    Sunlands Co. Joint Venture – Direct Participation in the New Energy Markets The Joint venture with Sunlands Co. has ed TES capacity projections according to IRENA’s Paris Agreement-aligned Figure 3: Installed TES capacity projections according to IRENA’s Paris Agreement-aligned transformed QGL from

  9. Slide 9: Joint Venture Delivers Massive Potential Demand for Uley Flake

    Joint Venture Delivers Massive Potential Demand for Uley Flake Key metrics • 5 tonnes of flake graphite is required for 1MWh of storage • up to 4x this tonnage may be required for a commercial installation • Sunlands Co. estimates it will require approximately “There are several options that could m

  10. Slide 10: About Quantum Graphite Limited

    About Quantum Graphite Limited Board of Directors Capital Structure Bruno Ruggiero, Chairman Shares on Issue (on a fully diluted basis post Sal Catalano, Managing Director consolidation) approx. 293 million. Bob Osmetti Top 50 Shareholders >80%. David Trimboli Board represents approximately >40% sha

  11. Slide 11: Disclaimer

    QUANTUM GRAPHITE Disclaimer This presentation includes certain statements that may be deemed forward-looking statements. All statements ln these presentation materials (other than statements of historical facts) which address future production, reserve potential, exploration activities and events or

Quantum Graphite — ShareCafe Small Cap "Hidden Gems" Webinar (February 2022) on 6ix