Bonavista Energy — Investor Day (November 2016)
91 slides from Bonavista Energy's investor day presentation, Nov 14, 2016

Slide 1: Analyst Day November 14, 2016
BONAVISTA ENERGY CORPORATION ANALYST DAY NOVEMBER 14, 2016 All together better.”

Slide 2: Advisory
Advisory Forward looking information and statements: Except for the historical and present factual information contained herein, the matters set forth in this presentation, including words such as "expects", "projects", "plans" and similar expressions, are forward-looking information that represent

Slide 3: Advisory: IFRS, BOE and drilling locations
Advisory IFRS, BOE and drilling locations: Non-IFRS Financial Measures This presentation contains non-IFRS measurements which do not have a standardized meaning prescribed by IFRS and therefore may not be comparable with the calculation of similar measures for other entities. These measures have bee

Slide 4: Agenda
Agenda 8:30 Introductions Berk Sumen Adapting and Evolving Jason Skehar Visibility to Value Creation Bruce Jensen Dean Kobelka Asset Portfolio Bruce Jensen Wayne Merkel Colin Ranger Scott Wilhelm Scott Shimek 10:00 Summary and Q&A Jason Skehar 4 All together better.®

Slide 5: Today's Objectives
Today’s Objectives 1 Illustrate the steps we have taken to adapt and evolve in this environment 2 Provide clarity with our strategy and visibility for our near term development plans 3 Demonstrate the quality of our assets and our intentions to create value 5 All together better.®

Slide 6: Identity
Identity This is Bonavista: Our leadership team is We are ALIGNED with our EXPERIENCED: shareholders: average tenure with 8% insider ownership, 4x Bonavista of 13 years our peer group average We have a FOCUSED asset base: We are EFFICIENT: >98% of net operating $5.31/boe operating costs income gener

Slide 7: Experience & Alignment: Board of Directors
Experience & Alignment Board of Directors: Keith MacPhail Jason Skehar Ian Brown Michael Kanovsky Sue Lee Executive Chairman President and Chief Executive Officer Independent Director Lead Director, Independent Director Independent Director Margaret McKenzie Robert Phillips Ronald Poelzer Christophe

Slide 8: Experience & Alignment: Leadership team
Experience & Alignment Leadership team: Jason Skehar Bruce Jensen Dean Kobelka Wayne Merkel President and Chief Executive Officer Chief Operating Officer Vice President, Finance and Vice President, Exploration Chief Financial Officer Colin Ranger Lynda Robinson Scott Shimek Scott Wilhelm Vice Presid

Slide 9: Focused on two core areas
Adapting and Evolving Focused on two core areas: Deep Basin • 23,500 boe/d production Edmonton (Q4/2016E) • 90% natural gas Deep Basin • 560 gross locations in key play inventory West Central • 45,800 boe/d production (Q4/2016E) • 60% natural gas • 856 gross locations in key play inventory West Cent

Slide 10: Concentrating portfolio through focused E&D capital programs
Adapting and Evolving Concentrating our portfolio through focused E&D capital programs: E&D Capital ($ millions) Production (boe/d) 100% 100% 90% 90% 80% 80% 70% 70% 60% 60% 50% 50% 40% 40% 30% 30% 20% 20% 10% 10% 0% 0% 2008 2009 2010 2011 2012 2013 2014 2015 2016E 2017F 2008 2009 2010 2011 2012 201

Slide 11: Concentrating portfolio through acquisitions and divestitures
Adapting and Evolving Concentrating our portfolio through acquisitions and divestitures: A&D transaction value ($ millions) A&D Production (boe/d) 300 12 $664 mm total 21,900 boe/d Acquired core assets at $30,300 200 8 100 4 /boepd $ millions 0 0 mboe/d -100 Divested non-core -4 assets at -200 -8 $5

Slide 12: Improving costs to develop and produce assets
Adapting and Evolving Improving our costs to develop and produce our assets: Finding & Development Costs ($/boe) * Production Addition Efficiency ($/boepd) $15.00 $34,000 56% $32,000 59% $30,000 $12.50 $28,000 $26,000 $24,000 $10.00 $22,000 $20,000 $18,000 $7.50 $16,000 $14,000 $12,000 $5.00 $10,000

Slide 13: Improving cost of operations with focus on margins
Adapting and Evolving Improving our cost of operations with a focus on our margins: 38% reduction in op costs Margin maintained despite 37% erosion in realized prices $14.00 80% 40 $12.00 70% 35 60% 30 $10.00 Operating Margin (%) Cash costs ($/boe) Revenue per boe 50% 25 $8.00 40% 20 $6.00 30% 15 $4

Slide 14: Proactively managing our liabilities
Adapting and Evolving Proactively managing our liabilities: Gross Operated Well Count (# wells) Liability Management Rating (LMR) 5.00 6,000 44% 5,000 4.00 4,000 3.00 44% 3,000 2.00 2,000 Regulator LMR threshold 36% 1.00 1,000 - 0.00 2012 2013 2014 2015 2016E 2012 2013 2014 2015 2016E Active Inactiv

Slide 15: Reducing our carbon footprint
Adapting and Evolving Reducing our carbon footprint: Total gas flared (mmcf/year) Total gas vented, Alberta (mmcf/year) 600 600 500 500 400 400 300 300 200 200 100 100 0 0 2012 2013 2014 2015 2012 2013 2014 2015 Flared and vented volumes represent 0.16% and 15 0.07% of natural gas produced, respecti

Slide 16: 2016 - Achieving our goals
Adapting and Evolving 2016 - Achieving our goals: Improve financial flexibility 2016E net debt reduction of $430 million Demonstrate sustainability January 2016 to January 2017 production maintained with ZERO capital spent Enhance efficiencies Continued concentration of the asset base resulting in s

Slide 17: Improved financial flexibility
2016 – Achieving our Goals Improved financial flexibility: In February, we forecasted: 4.9 Net debt / FFO * Year End Net Debt $1.20B 27% The picture today: 2.9 Net Debt / FFO * Year End Net Debt $881MM 17 * Fourth quarter funds from operations annualized All together better.®

Slide 18: 33% net debt reduction in 2016
2016 – Achieving our Goals Improved financial flexibility - 33% net debt reduction in 2016: 2016 opening net debt $430 million $1,311 Net Debt ($ millions) $105 mm of excess funds from operations* $167 mm of net asset dispositions $110 mm equity financing $48 mm foreign exchange monetization $881 $8

Slide 19: Current debt position
2016 Priorities – Financial Flexibility Current debt (total and senior) position*: Interest Rate:Senior Notes 4.1% Bank Debt 3.2% Average Term: 5.0 years Senior Notes (CDN) $20 Hedging: 74% USD notes hedged at $0.76 CDN/USD 200 Unutilized Bank Capacity $550 180 160 140 ($ millions) 120 100 80 60 40

Slide 20: Sustained production with zero capital spent
2016 – Achieving our Goals Sustained production with zero capital spent: 80,000 January YoY production within 1% 75,000 70,000 +5% Production (boe/d) 65,000 $0 capital 60,000 55,000 50,000 Jan-16 Feb-16 Mar-16 Apr-16 May-16 Jun-16 Jul-16 Aug-16 Sep-16 Oct-16 Nov-16 Dec-16 Jan-17 Actuals plus forecas

Slide 21: Enhanced well performance
2016 – Achieving our Goals Enhanced well performance - drilling better wells: 700 42% 600 improvement over Average Well Production (boe/d) 500 2015 400 300 200 100 0 1 2 3 4 5 6 7 8 9 10 11 12 Month 2015 Q3 2016 YTD 2016E 21 All together better.®

Slide 22: Well cost reductions contribute to efficiency gains
2016 – Achieving our Goals Well cost reductions contribute to efficiency gains – IP12 half cycle improves 38% in 2016: 4,500 2014 4,000 $ 15,600/boed Average Cost Per Well ($000s) 3,500 3,000 2,500 2015 2,000 14,600/boed $ 1,500 1,000 17% 2016 500 9,100/boed $ 0 2014 2015 Q3 2016 YTD Drill Complete

Slide 23: Cash cost improvements create incremental funds flow
2016 – Achieving our Goals Cash cost improvements create incremental funds flow to be deployed in 2017: $11.00 $1.38/boe x 71,500 boe/d (January 2017F) $36.0 $10.50 = mm/year $10.00 $1.38/boe Cash costs ($/boe) $36.0 mm/($9,000-$10,000/boepd)* $9.50 = 3,600 – 4,000 boe/d $9.00 $8.50 $8.00 2015 2016E

Slide 24: Sustainability – cost to maintain production
2016 – Achieving our Goals Sustainability – cost to maintain production: Minimum AECO price required 80,000 to maintain production spending 100% of funds from 70,000 operations 60,000 $2.10/GJ Production (boe/d) $1.70/GJ 50,000 $1.45/GJ 24.5% 40,000 2017 Base Decline 30,000 2017F 2018F 2019F 20,000

Slide 25: Visibility to Value Creation
BONAVISTA ENERGY CORPORATION VISIBILITY TO VALUE CREATION All together better.”

Slide 26: Strategy: the challenge
Visibility to Value Creation Strategy: the challenge Strengthen the balance sheet Advance the economic quality of our portfolio through focus and innovation Design a sustainable investment platform that will result in profitable growth at current commodity prices 26 All together better.®

Slide 27: Strategy: the solution
Visibility to Value Creation Strategy: the solution • Production CAGR of 10% from 2016 through to 2019 • 2019 Net Debt/FFO of 2.0 times * • 90%-95% payout ratio • 24% of key play inventory drilled in 3 years 27 * Assumes strip pricing as at November 1, 2016 and as illustrated on slide 32 All togethe

Slide 28: 2017 capital allocation
Visibility to Value Creation 2017 capital allocation: Wells Expenditures* Inventory Net ($ millions) Net West Central 32-37 105-110 465 Hoadley Glauconite 19-21 240 Strachan Glauconite 3-4 56 55% of Falher/Notikewin 10-12 169 value capital Deep Basin 23-28 125-135 407 directed to Wilrich 19-20 202 t

Slide 29: Budgeting for further well performance enhancements
Visibility to Value Creation Budgeting for further well performance enhancements: 800 700 7% Average Well Production (boe/d) 600 500 increase over 2016 despite 15% de-risking locations 400 300 200 100 0 1 2 3 4 5 6 7 8 9 10 11 12 Month 2015 2016E 2017F 29 All together better.®

Slide 30: Maintaining competitive efficiencies
Visibility to Value Creation Maintaining competitive efficiencies with modest increase in costs: Average Half Cycle IP-12 Flowing Efficiency 4,000 2015 3,500 14,600/boed Average Cost Per Well ($000s) $ 3,000 2,500 2016E 2,000 $9,100/boed 1,500 1,000 500 2017F 0 $ 9,500/boed 2015 2016E 2017F Drill Co

Slide 31: Portfolio consists of net key play locations
Visibility to Value Creation Portfolio consists of 951 net key play locations: Ellerslie 0 202 150 0 296 Wilrich Bluesky Glauconite Glauconite 63 296 Notikewin 73 Falher Wilrich 168 202 0 73 0 168 Notikewin Falher 31 Dials show net locations drilled in three years 2017-2019 All together better.®

Slide 32: Three year outlook
Visibility to Value Creation Three year outlook: 2017F 2018F 2019F E&D Expenditures ($ millions): Value 230-245 245-270 295-320 Support 50-55 45-50 50-55 Total 280-300 290-320 345-375 Production: Natural Gas (% of total) 71% 72% 72% Natural Gas Liquids (% of total) 26% 26% 26% Oil (% of total) 3% 2%

Slide 33: Three year outlook: funds from operations
Visibility to Value Creation Three year outlook: 2017F 2018F 2019F Funds from operations (“FFO”): $ millions 300-350 325-375 385-435 debt adjusted per share 1.44 1.49 1.72 11% CAGR*** Payout ratio (%) * 90-95 90-95 90-95 Net debt to FFO (x:1) 2.8 2.5 2.0 Realized Prices**: Natural gas ($/mcf) 3.05-3

Slide 34: Protecting future funds flow
Visibility to Value Creation Protecting future funds flow: Natural Gas* Oil** Propane 5,000 4,000 30.00 250 5.00 74.00 55% 72.00 200 4.00 4,000 70.00 Hedged volumes (thousand gj/d) Hedged volumes (bbls/d) 3,000 25.00 Hedged volumes (bbls/d) 68.00 38% 32% 66.00 CDN$/bbl CDN$/bbl 150 3.00 3,000 49% CD

Slide 35: Sensitivities to 2017 funds from operations
Visibility to Value Creation Sensitivities to 2017 funds from operations: $325 mm - $0.25 + $0.25 AECO Natural Gas -$0.25/gj +$0.25/gj - $5.00 + $5.00 WTI Oil -$5.00/bbl +$5.00/bbl -$20 -$15 -$10 -$5 $0 $5 $10 $15 $20 Change to funds from operations ($ millions) 2017F funds from operations based on

Slide 36: Production growth within funds from operations
Visibility to Value Creation Production growth within funds from operations: 100,000 90,000 80,000 70,000 60,000 50,000 40,000 30,000 20,000 10,000 0 Dec Dec Dec Jun Mar Sep Jun Jun Mar Sep Mar Sep 2016 2017F 2018F 2019F Pre-2017 Glauconite Falher Notikewin Wilrich Other * CAGR is calculated using c

Slide 37: Production by development year
Visibility to Value Creation Production by development year: 100,000 90,000 80,000 70,000 60,000 50,000 40,000 30,000 20,000 10,000 0 Dec Dec Dec Jun Jun Mar Sep Jun Mar Sep Mar Sep 2016 2017F 2018F 2019F Pre-2017 2017 2018 2019 37 All together better.®

Slide 38: Asset Portfolio
BONAVISTA ENERGY CORPORATION ASSET PORTFOLIO All together better.”

Slide 39: West Central
BONAVISTA ENERGY CORPORATION WEST CENTRAL All together better.”

Slide 40: Glauconite and Falher remain our priority
West Central Glauconite and Falher remain our priority: Glauconite • Reliable and predictable development with over 320 wells drilled • Ample infrastructure capacity to continue development at low cost • Years of drilling inventory to provide GLAUCONITE surplus funds flow while production is maintai

Slide 41: West Central: Visibility to value creation
West Central Visibility to value creation: 70,000 60,000 50,000 Production (boe/d) 40,000 30,000 20,000 10,000 0 Dec Dec Dec Jun Mar Sep Jun Mar Sep Jun Mar Sep 2016 2017F 2018F 2019F Pre-2017 Glauconite Falher Notikewin 41 * CAGR is calculated using change in annual rate between 2016E and 2019F All

Slide 42: Hoadley Glauconite: Proven track record of value creation
West Central – Hoadley Glauconite Proven track record of value creation: 30,000 R7 R6 R5 R4 R3 R2 R1W5 T46 25,000 Production (boe/d) 20,000 T45 15,000 10,000 24,600 22,700 14,500 21,600 16,200 T44 5,000 0 2012 2013 2014 2015 2016E T43 400 300 200 # of locations T42 100 0 -100 T41 -200 -300 Bonavista

Slide 43: Hoadley Glauconite: Consistent excess net operating income
West Central - Hoadley Glauconite Consistent excess net operating income: 500 450 400 350 300 ($ millions) 250 200 150 100 50 0 2013 2014 2015 Q3 YTD 2016 Net Operating Income Capital 43 All together better.®

Slide 44: Hoadley Glauconite: Efficiently managing decline
West Central – Hoadley Glauconite Efficiently managing decline and resource capture: 3,500 3,000 Foam Slickwater 2,500 Year 1 75% 34% Decline Raw Gas (mcf/d) 2,000 Year 2 45% 31% 1,500 Decline 1,000 2013 100% 0% 500 2016 40% 60% 0 1 31 61 91 121 151 181 211 241 271 301 331 361 391 Days BNP Slickwate

Slide 45: Hoadley Glauconite: Continuous improvement
West Central – Hoadley Glauconite Continuous improvement; even after 320+ wells: Year over year performance Production addition efficiency (IP12, $/boepd) * 2,500 2,000 Raw Gas (mcf/d) 1,500 $14,300 $13,300 $8,900 1,000 2014 2015 2016E 500 $3.3 $2.9 $2.5 mm/well* mm/well* mm/well* 0 1 2 3 4 5 6 7 8

Slide 46: Asset Exchange: Contiguous to existing acreage
West Central – Asset Exchange Closed Q4’16 Contiguous to existing acreage: R10 R9 R8 R7 R6 R5 R4 R3 R2 T42 T41 • Adjacent to current infrastructure and operations T40 • Added 55 Glauconite locations T39 • Expect to double production to 3,500 boe/d by Dec 2017 T38 Bonavista Lands Sept/16 Asset Exchan

Slide 47: Top tier inventory acquired within Hoadley trend
West Central – Asset Exchange Closed Q4’16 Top tier inventory acquired within greater Hoadley trend: Three year production growth 7,000 Prospect Gross Net inventory 6,000 1.0 mile 36 28.9 5,000 1.5 mile 6 4.5 Production (boe/d) 4,000 2.0 mile 13 9.5 TOTAL 55 42.9 3,000 Capital Program Net Wells $ mi

Slide 48: Enhancing efficiencies through consolidation
West Central – Asset Exchange Closed Q4’16 Enhancing efficiencies through consolidation: R7 R6 R5 Bonavista land Sept/16 asset exchange land 11-22 • Capital required to Bonavista pipeline Sept/16 Asset Exchange pipeline 6-22 redirect production is Bonavista facility T41 $900K Sep/16 asset exchange f

Slide 49: Maintaining production and providing capital for growth
West Central – Hoadley Glauconite Maintaining production and providing capital for growth assets: Capital Forecast ($ millions) Production Forecast (boe/d) 90 45 30,000 80 40 25,000 70 35 60 30 20,000 # of wells drilled 28.8 $ millions 50 25 21.9 15,000 40 20.3 20 16.7 30 15 10,000 20 10 5,000 10 5

Slide 50: Strachan Glauconite: Commercializing a significant resource
West Central – Strachan Glauconite Commercializing a significant resource: 3,000 R10 R9 R8 R7 R6 R5W5 2,500 Production (boe/d) 2,000 T39 1,500 1,000 2080 2390 1380 500 640 550 0 2012 2013 2014 2015 2016E T38 100 80 # of locations 60 T37 40 20 0 Bonavista Lands -20 2017 Locations 2012 2013 2014 2015

Slide 51: Strachan Glauconite: Economics becoming more competitive
West Central – Strachan Glauconite Economics becoming more competitive: Year over year performance Production addition efficiency (IP12, $/boepd) * 6,000 5,000 4,000 Raw Gas (mcf/d) $14,000 $16,300 $8,400 3,000 2,000 2014 2015 2016 1,000 $9.4 $6.5 $5.1 mm/well* mm/well* mm/well* 0 1 2 3 4 5 6 7 8 9

Slide 52: Strachan Glauconite: Drilling performance improved
West Central – Strachan Glauconite Drilling performance significantly improved: Days vs Depth Drilling cost per lateral meter ($/m) 0 3,000 2014 1,000 2015 2,500 2016 2,000 2,000 $ per meter 3,000 Depth 1,500 4,000 1,000 5,000 6,000 500 7,000 0 0 10 20 30 40 50 60 Days 2014 2015 2016 52 All together

Slide 53: Strachan Glauconite: Productivity improving with proppant
West Central – Strachan Glauconite Productivity improving with proppant intensity: Average Completion Costs ($000s) IP12/Lateral Meter (boe/d/m) $2,000 0.300 $1,500 0.250 +28% $1,000 $500 0.200 $0 2014 2015 2016 0.37 0.38 0.45 0.150 tonnes/metre tonnes/metre tonnes/metre 104 m spacing 85 m spacing 0

Slide 54: Strachan Glauconite: Economics improving
West Central – Strachan Glauconite Economics improving with drilling and completion innovation: 50% 45% 40% 35% Internal Rate of Return 30% 25% 20% 15% 10% 5% 0% $2.25 $2.75 $3.25 Natural gas - AECO ($/gj) Current Strachan Capital Costs Higher Historical Strachan Costs 54 * Current total capital cos

Slide 55: Opportunities to invest in stronger operating margins
West Central – Strachan Glauconite Opportunities to invest in stronger operating margins: KEYERA RIMBEY Cap: 420 mmcf/d • Current processing costly, alternatives exist • Significant pipeline cost of between $25-$30 million • Results in 40-50% reduction in operating costs Potential pipeline route • D

Slide 56: Economics become significantly more competitive
West Central – Strachan Glauconite Economics become significantly more competitive: 120% 100% 180% IRR improvement at $2.75/gj Internal Rate of Return 80% 60% 40% 20% 0% $2.25 $2.75 $3.25 Natural gas - AECO ($/gj) Current Recoveries & OPEX at Strachan Facility Enhanced Recoveries & OPEX at Rimbey Fa

Slide 57: Improved economics will accelerate development
West Central – Strachan Glauconite Improved economics will accelerate development of the resource: E&D Capital Forecast ($ millions) Production Forecast (boe/d) 50 25 9,000 45 8,000 40 20 7,000 35 6,000 # of wells drilled 30 15 $ millions 5,000 25 4,000 20 10 8.7 3,000 15 10 5 2,000 5.0 5 3.0 1,000

Slide 58: Morningside Falher: Growing a top tier opportunity
West Central – Morningside Falher Growing a top tier development opportunity: R1W5 R25W4 4,000 3,500 T44 Production (boe/d) 3,000 2,500 2,000 1,500 1,000 3,280 3,350 1,680 T43 250 500 60 0 2012 2013 2014 2015 2016E 160 140 120 T42 # of locations 100 80 60 40 20 0 -20 -40 Bonavista Lands 2012 2013 20

Slide 59: Morningside Falher: Prolific production potential at low cost
West Central – Morningside Falher Prolific production potential at low cost: Year over year performance Production addition efficiency (IP12, $/boepd) * 6,000 5,000 4,000 Raw Gas (mcf/d) $8,400 $6,400 $6,700 3,000 2,000 2014 2015 2016 1,000 $2.7 $2.4 $2.1 0 mm/well* mm/well* mm/well* 1 2 3 4 5 6 7 8

Slide 60: Designing infrastructure for profitable growth
West Central – Morningside Falher Designing the infrastructure for profitable growth: R1W5 R28 R27W4 Bonavista Ferrybank Plant: 28 mmcf/d spare processing capacity 3 mmcf/d spare compression capacity 2-1 Rimbey T43 2017: 9-1 $6.0 million for additional 17 mmcf/d capacity 11-35 2018/19: $2.0 million

Slide 61: Superior economics promote maximum capital allocation
West Central – Morningside Falher Superior economics promote maximum capital allocation: E&D Capital Forecast ($ millions) Production Forecast (boe/d) 60 25 16,000 21.8 14,000 50 20 12,000 40 16.8 # of wells drilled 10,000 15 $ millions 30 8,000 9.9 10 6,000 20 7.0 4,000 5 10 2,000 0 0 0 2016E 2017F

Slide 62: Reliable source of net operating income
West Central Reliable source of net operating income providing flexibility for growth: Production growth (boe/d) Net operating income ($ millions) Wells drilled (#) 60,000 300 70 50,000 60 250 50 40,000 200 40 30,000 150 30 20,000 100 20 10,000 10 50 0 0 0 2018F 2016E 2015 2016E 2018F 2015 2017F 201

Slide 63: Deep Basin
BONAVISTA ENERGY CORPORATION DEEP BASIN All together better.”

Slide 64: Deep Basin: Multi-zone opportunities
Deep Basin Multi-zone opportunities: R22 R18 R14 R10W5 Pine Creek Bluesky T57 • Core area loaded with multi-zone potential Marlboro T55 • Over 260,000 net acres Wilrich Falher/Notikewin • Increased our inventory by 49% to 550 T53 locations in last 12-months T51 • Operate 225 mmcf/d in processing cap

Slide 65: De-risking for growth
Deep Basin De-risking for growth: 40,000 35,000 30,000 Production (boe/d) 25,000 20,000 15,000 10,000 5,000 0 2016 Dec Dec Dec Jun Jun Jun Mar Mar Mar Sep Sep Sep 2017F 2018F 2019F Pre-2017 Falher Notikewin Wilrich Other 65 All together better.®

Slide 66: Asset Exchange: Expanding our asset base
Deep Basin – Asset Exchange Completed Q4‘16 Expanding our asset base: R21 R19 R17 R15 R13 T61 T59 T57 • Increased production by 28% T55 • Added 127 net drilling locations • Increased our proved plus probable T53 reserves by 38% Asset exchange land Bonavista land 66 All together better.®

Slide 67: Optimizing our infrastructure
Deep Basin – Asset Exchange Completed Q4‘16 Optimizing our infrastructure: R21 R19 R17 R15 R13 T61 Semcams K3 Facility T59 Consolidating pipeline • Bonavista currently owns 225 mmcf/d Pine Creek Facility T57 of processing capacity in area • $8 million required to redirect 60% of Marlboro Facility T5

Slide 68: Three year production growth
Deep Basin – Asset Exchange Completed Q4‘16 Three year production growth: Three year production growth Prospect Gross Net 10,000 inventory 9,000 Wilrich (1-mile) 13 12.0 8,000 Wilrich (1.5-mile) 6 3.0 7,000 Wilrich (2-mile) 7 5.5 Production (boe/d) 6,000 Notikewin 26 17.7 5,000 Other 133 89.0 4,000

Slide 69: Wilrich: Extensive resource
Deep Basin – Wilrich Extensive resource: R21 R20 R19 R18 R17 R16 R15 R14 R13 12,000 T53 10,000 Production (boe/d) 8,000 T52 6,000 4,000 10,300 1,051 11,290 3,836 6,626 2,000 T51 0 2012 2013 2014 2015 2016E T50 300 250 200 # of locations T49 150 100 50 T48 0 -50 Bonavista Lands -100 2017 Locations 20

Slide 70: Ansell Wilrich: Extended reach horizontals
Deep Basin – Ansell Wilrich Extended reach horizontals enhancing efficiencies: Year over year performance Production addition efficiency (IP12, $/boepd) * 5,000 4,500 4,000 3,500 Raw Gas (mcf/d) 3,000 $10,200 $15,700 $17,200 2,500 2,000 1,500 2014 2015 2016 1,000 500 $5.9 $4.8 $4.6 0 mm/well* mm/wel

Slide 71: Ansell Wilrich: Improvements in drilling performance
Deep Basin – Ansell Wilrich Significant improvements in drilling performance: Days vs Depth Drilling cost per lateral meter ($/m) 0 3,000 2014 2015 1,000 2,500 2016 2,000 2,000 Depth 1,500 3,000 1,000 4,000 500 5,000 0 0 5 10 15 20 25 30 35 Days 2014 2015 2016 71 All together better.®

Slide 72: Reducing costs through facility ownership
Deep Basin - Ansell Wilrich Reducing costs through facility ownership: Operating Costs ($/boe) 8.00 • 60 mmcf/d Ansell facility online October 2015 6.00 4.00 • Connection to both TCPL and Alliance 2.00 • Cost structure improving with operatorship 0.00 72 2013 2014 2015 2016E All together better.®

Slide 73: Cost effective facility expansion
Deep Basin - Ansell Wilrich Cost effective facility expansion: 2017 Expansion to 100 mmcf/d • Capital cost of $10 million • One new inlet compressor • Two new sales compressors New sales compressors • Connect surplus refrigeration facility 110,000 100,000 90,000 80,000 Raw Gas (mcf/d) 70,000 60,000

Slide 74: Ansell Notikewin: Prolific channel system
Deep Basin – Ansell Notikewin Prolific channel system accessible with existing Wilrich infrastructure R19 R17 R15W5 100/09-35-050-18W5/0 • Notikewin is part of an extensive fluvial system • Numerous wells drilled offsetting T51 Ansell acreage • One well planned for 2017 • 20 wells in inventory T50 •

Slide 75: Ansell Falher: Additional prolific channel system
Deep Basin – Ansell Falher Additional prolific channel system accessible with existing Wilrich infrastructure 100/09-35-050-18W5/0 T52 • Ansell Falher is part of an extensive valley system T51 • First well to be drilled in Q4 2016 • Analog in nearby Medicine Lodge • Identifiable on 3D seismic 100/08

Slide 76: Building a solid base with Spirit River development
Deep Basin – Ansell Building a solid base with Spirit River development: E&D Capital Forecast ($ millions) Production Forecast (boe/d) 120 30 25,000 100 25 20,000 80 20 # of wells drilled 19.0 15,000 $ millions 17.2 60 15.0 15 13.0 10,000 40 10 5,000 20 5 0 0 0 2016E 2017F 2018F 2019F Q1 Q2 Q3 Q4 Q1

Slide 77: Notikewin: Significant development optionality
Deep Basin - Notikewin Significant development optionality: R19 R17 R15W5 • Extensive fluvial system extending into the Rosevear, Groat and Pine creek areas T57 • 3 wells planned for 2017 • 54 locations in prospect inventory 4.5 Raw Gas (mmcf/d) T55 4.0 3.5 3.0 2.5 2.0 1.5 1.0 0.5 T53 0.0 1 2 3 4 5

Slide 78: Bluesky: Liquids rich natural gas development
Deep Basin – Bluesky Liquids rich natural gas development optimizing nearby operated facility throughput: R21 R20 R19 R18 R17 R16 T59 • Bluesky is part of an incised valley system T58 in the Pine Creek area • Drilled 35 wells to the end of 2016 • 3 gross (2.5 net) wells planned for 2017 T57 • 92 loc

Slide 79: Recent Bluesky performance
Deep Basin – Bluesky Recent Bluesky performance: 4.5 4.0 3.5 Over 50% of Bluesky liquid recoveries are condensate 3.0 Raw Gas (mmcf/d) 2.5 2.0 1.5 1.0 0.5 - 1 2 3 4 5 6 7 8 9 10 11 12 Months on Production 2014-2015 Avg. Bluesky Performance 2016 Avg. IP-1 Field Production 79 All together better.®

Slide 80: Deep Basin: Committed to profitable growth
Deep Basin Committed to profitable growth: Production growth (boe/d) Net operating income ($ millions) Wells drilled (#) 40,000 250 40 35,000 35 200 30,000 30 25,000 25 150 20,000 20 15,000 100 15 10,000 10 50 5,000 5 0 0 0 2018F 2016E 2015 2017F 2019F 2018F 2016E 2017F 2019F 2015 2015 2016F 2017F 2

Slide 81: Summary
BONAVISTA ENERGY CORPORATION SUMMARY All together better.”

Slide 82: Production growth within funds from operations
Summary: Production Growth Production growth within funds from operations: 100,000 90,000 80,000 70,000 60,000 50,000 40,000 30,000 20,000 10,000 0 Dec Dec Dec Jun Mar Sep Jun Jun Mar Sep Mar Sep 2016 2017F 2018F 2019F Pre-2017 Glauconite Falher Notikewin Wilrich Other * CAGR is calculated using cha

Slide 83: Key Play Returns: IRR sensitivities to commodity price
Summary: Key Play Returns IRR sensitivities to commodity price: LOW BASE HIGH $2.25/GJ AECO $2.75/GJ AECO $3.25/GJ AECO $40/bbl USD WTI $50/bbl USD WTI $60/bbl USD WTI Morningside Falher 30.9% 60.2% 98.4% Glauconite 18.1% 35.7% 57.8% Ansell Wilrich 17.4% 31.4% 50.2% Bluesky 15.1% 30.8% 49.3% 83 All

Slide 84: Growth Impact: Outcome of our three year plan
Growth Impact Outcome of our three year plan: 9% 2.0x Production per 2019 Net $9,000-$10,000 boe/d Debt and Debt/Funds Dividend Adjusted From Half cycle IP12 Share Operations production efficiencies CAGR 11% CAGR Debt Adjusted Funds From Operations per Share 90-95% Payout Ratio 18% Reduction in cash

Slide 85: Appendix
BONAVISTA ENERGY CORPORATION APPENDIX All together better.”

Slide 86: West Central – Hoadley Glauconite type well
West Central – Hoadley Glauconite 700 1-mile 2-mile Lateral length (miles) 1.0 2.0 600 Capital ($ millions) * 2.4 3.9 EUR (mboe) 530 797 500 F&D ($/boe) 4.43 4.83 Production (boe/d) 400 IP12 (boe/d) 257 478 $/boed 9,200 8,100 300 Netback (12-mos, $/boe) 14.75 15.44 Recycle Ratio 3.3 3.2 200 IRR (%)

Slide 87: West Central – Strachan Glauconite type well
West Central – Strachan Glauconite 900 1.5-mile 2-mile Lateral length (miles) 1.5 2.0 800 Capital ($ millions) * 4.7 5.3 700 EUR (mboe) 720 929 600 F&D ($/boe) 6.57 5.74 Production (boe/d) 500 IP12 (boe/d) 409 529 $/boed 11,550 10,100 400 Netback (12-mos, $/boe) 15.99 15.01 300 Recycle Ratio 2.4 2.6

Slide 88: West Central – Morningside Falher type well
West Central – Morningside Falher Prairie 900 Crown Sky 2-mile 800 Lateral length (miles) 1.0 1.0 2.0 Capital ($ millions) * 2.0 2.0 3.4 700 EUR (mboe) 424 450 717 600 Production (boe/d) F&D ($/boe) 4.76 4.48 4.70 500 IP12 (boe/d) 318 337 532 400 $/boed 6,350 6,000 6,350 Netback (12-mos, $/boe) 14.2

Slide 89: Deep Basin – Wilrich type well
Deep Basin – Wilrich 1,200 Ansell Marlboro Lateral length (miles) 1.5 1.0 1,000 Capital ($ millions) * 4.7 3.7 EUR (mboe) 936 538 800 F&D ($/boe) 4.97 6.88 Production (boe/d) IP12 (boe/d) 475 417 600 $/boed 9,800 8,900 Netback (12-mos, $/boe) 16.87 15.70 400 Recycle Ratio 3.4 2.3 IRR (%) 31 36 200 P

Slide 90: Deep Basin – Bluesky North Trend type well
Deep Basin - Bluesky 700 North Trend Lateral length (miles) 1.0 600 Capital ($ millions) * 3.6 EUR (mboe) 538 500 F&D ($/boe) 6.60 Production (boe/d) 400 IP12 (boe/d) 347 $/boed 10,200 300 Netback (12-mos, $/boe) 18.64 Recycle Ratio 2.8 200 IRR (%) 44 100 Payout (years) 2.0 0 bbls/mmcf 3 6 9 12 15 1

Slide 91: All together better.
All together sett 7 : All together better.”
Source: Internet Archive copy of bonavistaenergy.com
More decks from Bonavista Energy Corporation
Shareholder Meeting (May 2019)54 slides · May 2019
Investor Presentation (September 2018)39 slides · Sep 10, 2018
Investor Presentation (July 2018)43 slides · July 2018
Shareholder Meeting (May 2018)43 slides · May 3, 2018
Shareholder Meeting (May 2014)36 slides · May 1, 2014
Investor Presentation (April 2014)35 slides · April 2014