  1. Slide 1: Low-Cost Fuel for Emission-Free Electricity

    LOW-COST FUEL FOR EMISSION-FREE ELECTRICITY URANIUM ENERGY CORP | NYSE MKT: UEC | URANIUMENERGY.COM

  2. Slide 2: Disclaimer

    Disclaimer Statements contained in this presentation which are not historical facts are measured mineral resources, indicated mineral resources and inferred forward-looking statements that involve risks, uncertainties and other factors mineral resources, while recognized and required by Canadian reg

  3. Slide 3: Our Mission

    Our Mission TO EXPAND URANIUM PRODUCTION USING LOW COST IN-SITU RECOVERY(ISR) WHILE DEVELOPING A PIPELINE OF RESOURCES FOR MAJOR ONGOING GROWTH 3

  4. Slide 4: Diversified Asset Portfolio: Low-Cost ISR & Production Ready

    Diversified Asset Portfolio Low-Cost ISR & Production Ready Combined portfolio of 54Mlbs M&I and Reno Creek ISR Project (Fully Permitted) 43Mlbs Inferred U3O8 Project Name Stage Resources (M lbs) M&I Inferred Reno Creek (NT) 22.0 0.9 Infrastructure Licensed for 2M lbs/year production Hobson Processi

  5. Slide 5: UEC's Hobson ISR Processing Plant – South Texas

    UEC’s Hobson ISR Processing Plant – South Texas 5

  6. Slide 6: UEC at a Glance

    UEC at a Glance Member of the Russell 3000® Index Cash $22.6 M* Share 155.8 M 31.0 M 14.1 M 200.9 M Structure Outstanding Warrants + Options Fully Diluted** Recent $1.19 1,056,157 Activity Price as of 10/16/17 Avg. Daily Vol. (3-mo) Enterprise $185 M $20 M*** ~$183 M Value Market Cap Long-Term Debt

  7. Slide 7: Our Team

    Our Team Amir Adnani Spencer Abraham Scott Melbye President, CEO, Director Chairman, Board of Directors Executive Vice President An entrepreneur, founding CEO of UEC, Served as a U.S. Senator from 1995 to 2001, as 33 years experience with uranium majors, founder and Chairman of Brazil Resources Secr

  8. Slide 8: UEC's Three-Prong Strategy

    UEC’s Three-Prong Strategy  Keep 100% Un-Hedged Book  Align with contrarian long-term capital  Downturn Presents Acquisition Opportunities:  Best time to acquire future development pipeline  Resource Management and Production Readiness  Develop low-cost and scalable operations (ISR Hub & Spoke

  9. Slide 9: Strengthening ISR Portfolio with Accretive Acquisition of Reno Creek Project

    Strengthening ISR Portfolio with Accretive Acquisition of Reno Creek Project  Fully Permitted Construction Ready ISR Project  Permitted to produce up to 2 million lbs U3O8 per year  Strategically located within the prolific Powder River Basin in Wyoming  Nearly $60 million to date on acquisition

  10. Slide 10: Pro-Forma UEC – Reno Creek Acquisition

    Pro-Forma UEC – Reno Creek Acquisition Reno Creek UEC Pro-Forma Acquisition* Shares Outstanding 139.8M 14.4M 154.9M +10% Relative Ownership 90.7% 9.3% 100.0% Shares Fully Diluted 171.8M 25.7M 198.2M Market Cap $194M - $198M M&I Resources (Mlbs)** 32.4Mlbs 22.0Mlbs 54.4Mlbs +68% Inferred Resources (M

  11. Slide 11: Reno Creek: Project Summary

    Reno Creek: Project Summary Powder River Basin  Strategic location within the heart of the Powder River Basin, Wyoming  Large ISR resource, including 22.0 Mlbs U3O8 Measured & Indicated*  Additional geologic potential to expand resources  10-12 miles of underexplored ground, along four major fro

  12. Slide 12: Reno Creek: Project History

    Reno Creek: Project History  Significant Historic Expenditures: Nearly $60M invested in the project since 2010 including asset acquisitions, extensive development activities and royalty buybacks  Fully Permitted: Reno Creek received its final permits to produce up to 2 Mlbs per year in Feb. 2017 J

  13. Slide 13: Reno Creek Permitting Schedule

    Reno Creek Permitting Schedule Major Task Timing DDW Permit Completed – Jun 2015 Permit to Mine Completed – Jul 2015 EPA Aquifer Exemption OK Completed – Oct 2015 DEQ Air Quality Permit Completed – Oct 2016 NRC Final Environment Impact Statement, Record of Decision & Completed – Feb 2017 License  U

  14. Slide 14: Titanium Business in Paraguay

    Titanium Business in Paraguay One of the highest-grade and largest-known Ferro-Titanium deposits in the world Project Historic Operator Stage Resource (Billion Tonnes) Inferred Resource has been Alto CIC Resources inc Exploration / estimated at 4.94 billion tonnes Paraná Development grading 7.41% Ti

  15. Slide 15: UEC Acquisition of the Alto Paraná Titanium Project in Paraguay

    UEC Acquisition of the Alto Paraná Titanium Project in Paraguay  Approximately $25 million invested in the project with production process successfully pilot-tested  Mineralization occurs at the surface, with a large land package of over 70,000 hectares  Excellent infrastructure with proximity to

  16. Slide 16: Hub & Spoke Production Strategy

    Hub & Spoke Production Strategy 16

  17. Slide 17: Hobson Fully Licensed and Permitted

    Hobson is fully licensed and permitted. The Processing Plant has a 2M lb. / year physical capacity 17

  18. Slide 18: Palangana ISR Mine: First Producing Mine Proof of Concept

    Palangana ISR Mine First Producing Mine Proof of Concept $10 M 6 months construction timeline Initial CAPEX • Low cash-cost of $21.77/lb Production during operation Ready • Fully permitted including expanded mine permit Similar Costs • Goliad fully permitted • Burke Hollow final mine and for Future

  19. Slide 19: Palangana Production Area (PA-1)

    Palangana Production Area 1 (PA-1) Palangana Ion Exchange Facility 19

  20. Slide 20: Resin Hauling Truck And Trailer

    Resin Hauling Truck And Trailer 20

  21. Slide 21: Burke Hollow ISR Project Growth Ahead

    Burke Hollow ISR Project Growth Ahead  Discovery of five trends since 2012, resulting from 580 exploration/delineation  Inferred uranium resource of 5.12 million pounds in 2.9 MT grading 0.09% U3O8*  Leach amenability testing indicates recovery greater than 90%  20,000 acres located ~50 miles fr

  22. Slide 22: Burke Hollow ISR Project Advancing with Drilling and Permitting

    Burke Hollow ISR Project Advancing with Drilling and Permitting  Drilling underway to delineate and expand resource  The following final permits have been issued:  Mine Production Area. Drilling at Burke Hollow  Two Class I disposal wells.  Aquifer Exemption.  Radioactive Material License (RML

  23. Slide 23: Goliad ISR Project

    Goliad ISR Project  Fully licensed and permitted  NI 43-101 compliant resource*:  Measured & Indicated Resource: 5,475,200 lbs in 3.8 MT grading 0.05% U3O8  Inferred Resource: 1,501,400 lbs in 1.5 MT grading 0.05% U3O8 *See disclaimer on slide 2 23

  24. Slide 24: ISR District Opportunity in Paraguay

    ISR District Opportunity in Paraguay Similar geology as South Texas and leveraging ~$50M of historic exploration work by Anschutz and Cameco, including new work completed by UEC. Project Historic Operator Stage Resource (M lbs.) Yuty Cue Resources / Exploration / 8.9m lbs in 7.8 MT grading 0.052% Ca

  25. Slide 25: Anderson Project Overview

    Anderson Project Overview NI 43-101 compliant resource*:  Indicated Resource: 26.8 M tons, 17 M lbs. avg. grade A Large US of 0.029% Resource  Inferred Resource: 13 M tons, 12 M lbs. with avg. grade of 0.046% 9,852 Project located ~75 miles northwest of Phoenix, AZ Acres Historic Between 1955-1958

  26. Slide 26: Anderson Project Preliminary Economic Assessment

    Anderson Project Preliminary Economic Assessment Projected post-tax IRR of 50% and an NPV of Overview $101.1 million, based on a uranium price of $65 per pound  CAPEX is estimated at $8 million for pre-production Low costs and $43.9 million for initial capital CAPEX / OPEX  Average life of mine di

  27. Slide 27: Slick Rock Project US Project Portfolio Highlight

    Slick Rock Project US Project Portfolio Highlight NI 43-101 compliant resource:  Inferred Resource: 2.5 M tons, 11.6 M lbs. avg. Technical grade of 0.228% Report  Inferred Resource: 2.5 M tons, 69.6 M lbs. vanadium with avg. grade of 1.37%  33% pre- tax Internal Rate of Return  $43.8 million pre

  28. Slide 28: Climate Change Requires Nuclear Energy Involvement

    Climate Change Requires Nuclear Energy Involvement “There’s really only one technology that we know of that supplies carbon-free power at the scale modern civilization requires, and that is nuclear power” - Ken Caldeira of Stanford University’s Department of Global Ecology 28

  29. Slide 29: Nuclear Energy's Solid Value Proposition

    Nuclear Energy’s Solid Value Proposition SAFE, RESILIENT AND RELIABLE ELECTRICITY 24/7 Anchors the Avoids Local Contributes Carbon Community: Provides to Fuel and Emissions Jobs, Tax Base Runs When Clean Air Technology Needed Compliance Diversity Provides (Portfolio Supports Price (Fuel on Value Sit

  30. Slide 30: Nuclear Power - Growth Industry By Any Measure

    Nuclear Power - Growth Industry By Any Measure  447 operable reactors in 30 different countries  56 reactors under construction  160 reactors on order or planned  2015/2016 - the best two years in the past 25 for nuclear capacity additions 30

  31. Slide 31: Current Challenges for Nuclear Energy

    Current Challenges for Nuclear Energy  Slow Pace of Japanese Recovery  New Anti-Nuclear South Korean President  Amended French nuclear policy?  U.S. “deregulated” market pressures – cheap gas, subsidized wind  Westinghouse bankruptcy – V.C. Summer abandonment 31

  32. Slide 32: China and India Accelerating Nuclear Growth

    China and India Accelerating Nuclear Growth  China:  India: - 37 reactors operating - 22 reactors operating - 183 reactors planned and proposed - 65 reactors planned and proposed - 20 under construction - 6 under construction  Air quality imperative –moratorium on new coal plants 32

  33. Slide 33: Japanese Recovery Progressing Well in 2017

    Japanese Recovery Progressing Well in 2017  12 reactors have passed NRA Safety Review  5 reactors have started  A total of 9 reactors plan to be operating by spring 2018  Government approved plans are for 20%-22% from nuclear power 33

  34. Slide 34: Nuclear Power in the United States

    Nuclear Power in the United States  Continued Strong Reliance on Nuclear Power  99 operating reactors  20% of the nations electrical energy  60% of the nation’s carbon-free electricity  2 new reactors under construction  14 New Reactor Licenses issued or under review  Department of Energy pus

  35. Slide 35: Utilities Will Need to Purchase ~1 Billion Pounds of U3O8

    Utilities Will Need to Purchase ~ 1 Billion Pounds of U3O8 Over the Next 12 Years Data provided by Ux Consulting Company 35

  36. Slide 36: Uranium Price History

    Uranium Price History Source: Ux Consulting 36

  37. Slide 37: Uranium Prices at Current Levels are Unsustainable

    Uranium Prices at Current Levels are Unsustainable  Global production costs not covered at $20/lb spot price*  Even lowest-cost Kazakh production under pressure  Producer contracts ending will not be replaced at previous pricing  More production is likely to be shuttered with current market pric

  38. Slide 38: Investment Summary

    Investment Summary  Strengthening ISR portfolio with acquisition of fully licensed Reno Creek Project  Infrastructure advantage with Hobson Plant  Proof of concept with low-cost ISR production  5 ISR projects in Texas, with two fully permitted and a third (Burke Hollow) advanced stage permitting

  39. Slide 39: Pro-Forma Resource Summary

    Pro-Forma Resource Summary(1) Project Measured & Indicated Inferred Tons ('000) Grade (% U 3 O 8 )* Lbs U 3 O 8 ('000) Tons ('000) Grade (% U 3 O 8 )* Lbs U 3 O 8 ('000) Texas Hub & Spoke ISR Portfolio Palangana 393 0.14 1,057 328 0.18 1,154 Burke Hollow - - - 2,897 0.09 5,122 Goliad 3,790 0.05 5,47

  40. Slide 40: Uranium Energy Corp