Alterra Power Corp

Alterra Power — Q1 2015 Earnings Presentation

23 slides from Alterra Power's earnings presentation, May 13, 2015

  1. Slide 1: 2015 Q1 Results Conference Call

    Collector line trenching, Shannon wind farm (March 2015) 13|May Page 1 2015 2 0 1 5 Q 1 R E Swww.alterrapower.ca ULTS CONFERENCE CALL TSX : AXY

  2. Slide 2: Forward-Looking Information

    Forward-Looking Information This presentation contains certain “forward-looking information” within the meaning of Canadian securities laws, which may include, but is not limited to, statements with respect to future events or future performance, management’s expectations regarding Alterra’s product

  3. Slide 3: Participants

    Participants Introduction • Ross Beaty  Executive Chairman • John Carson  CEO Financials • Lynda Freeman  CFO Operations • Jay Sutton  VP Hydro Power • Paul Rapp  VP Wind and Geothermal Power Construction • Jay Sutton • Paul Rapp Growth Opportunities / Summary • John Carson  CEO Page | 3 www.a

  4. Slide 4: First Quarter Consolidated Results

    Alterra Power Q1 2015 Results Call Financials | Lynda Freeman, CFO First Quarter Consolidated Results: Consolidated Results ($MM) Q1 2015 Q1 2014 Revenue 16.4 18.9 Gross profit 5.0 6.2 Equity income (loss) (1.0) (3.7) Other income (expenses) (21.6) (12.1) Loss before tax (17.6) (9.6) Alterra Power 2

  5. Slide 5: First Quarter Comparative Information (Net Interest)

    Alterra Power Q1 2015 Results Call Financials | Lynda Freeman, CFO First Quarter Comparative Information (Net Interest) ($000) For the three months ended March 31, 2015 Toba HS Orka Montrose Dokie 1 Soda Lake Development Total (66.6%) (40%) (25.5%) (100%) (a) and head office Generation (MWh) 216,100

  6. Slide 6: First Quarter Comparative Information (Net Interest) Charts

    Alterra Power Q1 2015 Results Call Financials | Lynda Freeman, CFO First Quarter Comparative Information (Net Interest) Q1 2015 Q1 2014 Production (GWh) 250 200 150 100 50 HS Orka Toba Montrose Dokie 1 Soda Lake Revenue EBITDA 15.0 6.0 12.0 5.0 4.0 9.0 3.0 6.0 2.0 3.0 1.0 HS Orka Toba Montrose Dokie

  7. Slide 7: Balance Sheet Highlights (Consolidated Basis)

    Alterra Power Q1 2015 Results Call Financials | Lynda Freeman, CFO Balance Sheet Highlights (Consolidated Basis) Select Balance Sheet Statistics ($MM) March 31, 2015 December 31, 2014 Cash 45.7 63.2 Total assets 583.7 623.2 Total debt 274.4 290.1 Total liabilities 402.9 409.2 Net assets 180.8 214.0

  8. Slide 8: Head office liquidity and cash projections

    Alterra Power Q1 2015 Results Call Financials | Lynda Freeman, CFO Head office liquidity: • The Company currently has $20.6 million in unrestricted cash (excludes cash held at HS Orka) • Alterra will fund its remaining equity contribution for the Shannon project from existing cash-on-hand Cash Proje

  9. Slide 9: Long Term Debt (net interest)

    Alterra Power Q1 2015 Results Call Financials | Lynda Freeman, CFO Long Term Debt (net interest) • Alterra holds the following corporate debt: — $117.5 MM Bonds payable (HS Orka acquisition debt) Alterra Power Corp. — $ 68.0 MM Holding company loan facility • $260.8 MM total project debt includes: 1

  10. Slide 10: Toba Montrose – Highlights

    Alterra Power Q1 2015 Results Call Operations | Jay Sutton, VP Hydro Power Location: British Columbia Toba Montrose – Highlights Capacity: 235 MW Ownership: 40% Alterra • Generation: – 248% of plan (59.1 GWh) • Quarterly record • Higher temperatures, increased rainfall – 88% of plan in April (22.8 G

  11. Slide 11: Dokie 1 – Highlights

    Alterra Power Q1 2015 Results Call Operations | Paul Rapp, VP Wind and Geothermal Power Location: British Columbia Dokie 1 – Highlights Capacity: 144 MW Ownership: 25.5% Alterra • Generation: – 97% of plan (88.3 GWh) – 103% of plan in April (29.4 GWh) – 99% of plan YTD • Plant operating well with no

  12. Slide 12: Svartsengi / Reykjanes – Highlights

    Alterra Power Q1 2015 Results Call Operations | Paul Rapp, VP Wind and Geothermal Power Location: Iceland Svartsengi / Reykjanes – Highlights Capacity: 174 MW Ownership: 66.6% Alterra • Generation: – 98% of plan (324.5 GWh) – 96% of plan in April (106.7 GWh) • Second reinjection well (RN-34) complet

  13. Slide 13: Jimmie Creek - Highlights

    Alterra Power Q1 2015 Results Call Construction | Jay Sutton, VP Hydro Power Location: British Columbia Jimmie Creek - Highlights Capacity: 62 MW Ownership: 51% Alterra • Construction update — Intake foundation complete; structural concrete for base slab and walls commenced — 65% of penstock install

  14. Slide 14: Shannon - Highlights

    Alterra Power Q1 2015 Results Call Construction | Paul Rapp, VP Wind and Geothermal Power Location: Clay County, Texas Shannon - Highlights Capacity: 204.1 MW Ownership: 100% Alterra • Project financing expected to close 1H 2015 • Planned commencement of commercial operations in 4Q 2015 • Constructi

  15. Slide 15: Mariposa (Chile) - Highlights

    Alterra Power Q1 2015 Results Call Growth Opportunities | John Carson, CEO Mariposa (Chile) - Highlights • Primary drilling program begins in October • Summer 2014/2015 field work included: — Completing surface casing installation at three well sites — Completing civil works (roads, camp upgrades) —

  16. Slide 16: Tahumming River

    Alterra Power Q1 2015 Results Call Growth Opportunities | John Carson, CEO • Tahumming River Location Toba Valley, BC — Current work includes: • Hydrology studies and data collection Technology Hydro • Preliminary engineering Capacity 15 MW • Environmental work (fish and animal studies) Estimated 85

  17. Slide 17: Hvalá and Brúarvirkjun growth projects

    Alterra Power Q1 2015 Results Call Growth Opportunities | John Carson, CEO • Hvalá Location NW Iceland Technology Hydro Capacity 55 MW Estimated annual 320 GWh generation HS Orka Ownership 58% projected • Brúarvirkjun Location South Iceland Technology Hydro Capacity 9.3 MW Estimated annual 70 GWh ge

  18. Slide 18: Bulandsvirkjun and Skúfnavatnavirkjun growth projects

    Alterra Power Q1 2015 Results Call Growth Opportunities | John Carson, CEO • Bulandsvirkjun Location South Iceland Technology Hydro Capacity 150 MW Estimated annual 944 GWh generation HS Orka Ownership 50% • Skúfnavatnavirkjun Location West Iceland Technology Hydro Capacity 10 MW Estimated annual 60

  19. Slide 19: Other growth projects

    Alterra Power Q1 2015 Results Call Growth Opportunities | John Carson, CEO Other growth projects: Dokie 2 (BC): 156 MW permitted wind expansion / GE is 49% partner Wind BC Coastal: Four large growth projects (three are near prospective LNG facilities) Other: Other potential growth opportunities in U

  20. Slide 20: www.alterrapower.ca TSX : AXY

    Page | 20 www.alterrapower.ca TSX : AXY

  21. Slide 21: Appendix 1: Long-term debt (all non-recourse)

    APPENDIX 1: Alterra Power Q1 2015 Results Call Financials | Lynda Freeman, CFO Long-term debt (all non-recourse) • Alterra’s project debt (net interest) at March 31, 2015 was $260.8 MM, and includes: — Toba Montrose fixed rate debt (6.17% - 6.69%) with annual repayments until 2045 — Dokie 1 fixed ra

  22. Slide 22: Appendix 1: Long-Term Debt – Project Debt (cont'd)

    APPENDIX 1: Alterra Power Q1 2015 Results Call Financials | Lynda Freeman, CFO Long-Term Debt – Project Debt (cont’d) Interest Principal All values in $MM Toba Montrose (40%) HS Orka (66.6%) 12.0 18.0 10.0 15.0 8.0 12.0 6.0 9.0 4.0 6.0 2.0 3.0 0.0 0.0 2015 2016 2017 2018 2019 2020 2021 2022 2023 202

  23. Slide 23: Appendix 1: Total Debt Service

    APPENDIX 1: Alterra Power Q1 2015 Results Call Financials | Lynda Freeman, CFO Long-Term Debt – Project Debt (cont’d) Interest Principal All values in $MM Total Debt Service 36.0 30.0 24.0 18.0 12.0 6.0 0.0 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 Page | 23 www.alterrapower.ca TSX : AXY

Alterra Power — Q1 2015 Earnings Presentation on 6ix