Oil & Natural Gas Corp. Ltd. · NSE:ONGC
Oil & Natural Gas — Investor Presentation (May 2011)
59 slides from Oil & Natural Gas's investor presentation, May 31, 2011

Slide 1: Oil & Natural Gas Corporation Ltd. Investors' Meet
Oil & Natural Gas Corporation Ltd. Investors’ Meet, Mumbai, 31st May 2011 1

Slide 2: Presentation overview
Presentation overview 1 Highlights 2 Industry scenario 3 Performance FY’11 4 Initiatives 2

Slide 3: 1. Highlights
1. Highlights

Slide 4: Highlights: FY'11
Highlights: FY’11 ONGC group registers highest-ever O+OEG production 62.05 Mtoe against 60.93 Mtoe in FY’10 (up 1.83%) OVL’s contribution increases to 9.45 Mtoe against 8.87 Mtoe in FY’10 (up 6.5%) 4

Slide 5: Highlights: FY'11
Highlights: FY’11 Highest reserve accretion (3P) in last 2 decades 83.56 Mtoe Ultimate Reserve (3P) accretion in ONGC operated domestic fields 5

Slide 6: Highlights: FY'11
Highlights: FY’11 MRPL records highest-ever Thru’put Thru’put 12.64 MMT; 1.2% higher than FY’10 6

Slide 7: Highlights: FY'11
Highlights: FY’11 ONGC’s Net Profit ` 18,924 Crore; the highest-ever Despite under-recovery of ` 24,892 Crore Up 13% over ` 16,768 Crore during FY’10 7

Slide 8: Highlights: FY'11
Highlights: FY’11 Dividend 350% total payout ` 7,486 Crore The highest-ever payout Plus Dividend Tax of ` 1,241 Crore 8

Slide 9: ONGC Domestic: Q4, FY'11
ONGC Domestic: Q4, FY’11 Domestic crude oil production up by 2.1% in Q4, FY’11 Crude oil production (MMT) Gas production (BCM) 6.65 6.80 6.29 6.31 0.48 0.79 0.58 0.65 6.17 6.01 5.64 5.72 Q4 FY'10 Q4 FY'11 Q4 FY'10 Q4 FY'11 ONGC PSC-JV ONGC PSC-JV 9

Slide 10: ONGC Financials: Q4, FY'11
ONGC Financials: Q4, FY’11 Lower PAT due to higher subsidy payout Turnover PAT Subsidy ` Crore 15,554 14,794 12,136 5,169 4,999 3,776 2,791 2,182 6,967 2,817 Q4 FY'10 Q4 FY'11 Q4 FY'10 Q4 FY'11 Q4 FY'10 Q4 FY'11 Impact on PAT Balalnce pay out 10 Highest-ever subsidy payout in a single quarter

Slide 11: 2. Industry Scenario
2. Industry Scenario

Slide 12: Global Economy
Global Economy The world witnessing two speed economy World economy projected to grow 4.4% in 2011 & 4.5% in 2012 Real GDP Growth % (Y-o-Y) 12 In advanced economies growth 2010 2011 10.3 10.4 remains subdued 10 9.6 8.2 8 In contrast, emerging markets contending with problems of 6 5.0 4.8 excessive

Slide 13: Oil demand
Oil demand 2010 witnessed second strongest year of global oil demand growth in last 30 years. Absolute demand expected to surpass pre-recession highs Oil demand grew by 2.4% in 2010; 84.95 mb/d in 2010 against 82.92 mb/d in 2009) Global liquid supply (mb/d) 87.95 Projected demand Projected 2011:

Slide 14: Oil supply
Oil supply 2010: OPEC supply 29.21 mb/d (41.17%) against non-OPEC supply of 41.75 mb/d (58.83%) Gains in non-OPEC supplies & ramping up of Iraqi production sufficient to meet bulk of incremental demand Crude oil supply (mb/d) 45 46 40 45 35 44 30 43 Percentage 25 42 Mb/d 20 41.17 41 15 % share fro

Slide 15: Crude oil price
15 50 60 70 80 90 100 110 120 130 140 40 1-Apr-10 15-Apr-10 29-Apr-10 13-May-10 27-May-10 10-Jun-10 Euro-zone crisis 24-Jun-10 8-Jul-10 22-Jul-10 Crude oil price 5-Aug-10 19-Aug-10 2-Sep-10 16-Sep-10 30-Sep-10 14-Oct-10 28-Oct-10 11-Nov-10 25-Nov-10 9-Dec-10 Dated Brent (US$/bbl) 23-Dec-10 6-Jan-11

Slide 16: India: Rising consumption
India: Rising consumption Petroleum products registers 2.86% increase in consumption during FY’11. Total consumption 141.75 MMT (137.80 MMT) On Y-to-Y basis consumption increased by 2.86% MS increased by 10.78%; LPG by 9.07% & Diesel by 6.65%. FO /LSHS by (-6.45%) Products basket Consumption of

Slide 17: India: Oil & Gas production
India: Oil & Gas production Stagnant crude oil production. Gas production increased since FY’10 Gas production increases with higher contribution from East Coast India: Crude oil production (MMT) India: Natural Gas production (BCM) 40 60 33.99 34.12 33.51 33.50 33.25 35 52.22 50 47.51 30 25 40 31.

Slide 18: India: Import dependence
India: Import dependence Increasing import dependence on oil Import dependency increased from 71.85% to 76.54% in last 5 years In FY’11, net import bill for crude oil & petroleum products increases by 22% Import & Export of Crude & Petroleum Products Net import bill of Crude & Products 180 ` Cro

Slide 19: 3. Performance FY'11 ONGC Group
3. Performance FY’11 ONGC Group

Slide 20: O+OEG Production
O+OEG Production Highest ever O+OEG production Crude oil production (MMT) 60.74 61.76 61.23 60.93 62.05 FY’10 FY’11 ONGC 24.67 24.42 PSC-JV 1.79 2.86 OVL 6.49 6.76 Total 32.95 34.04 Natural gas production (BCM) FY‟10 FY‟11 ONGC 23.11 23.10 PSC-JV 2.49 2.23 FY'07 FY'08 FY'09 FY'10 FY'11 OVL 2.38 2.

Slide 21: ONGC Group: O+OEG Reserves
ONGC Group: O+OEG Reserves Total Reserves (3P): 1,688.29 MTOE 1P 2P 3P 1,688 1,426 Oil Gas Total 1,212 986 961 ONGC 552.61 659.38 1211.99 724 PSC JV 20.37 20.93 41.30 OVL 270.46 164.54 435.00 402 435 Total 843.44 844.86 1688.29 203 35 39 41 ONGC JV OVL Total As on FY’11 21

Slide 22: ONGC Group: Financials
ONGC Group: Financials Highest-ever Turnover & PAT Turnover PAT Net Worth 127,905 114,531 108,679 ` Crore 100,565 18% 12% 19,404 22,456 16% FY'10 FY'11 FY'10 FY'11 FY'10 FY'11 22

Slide 23: 3. Performance FY'11 ONGC
3. Performance FY’11 ONGC

Slide 24: ONGC: Reserve accretion (3P)
ONGC: Reserve accretion (3P) 24 hydrocarbon discoveries (15 new prospects + 9 new pool) Ultimate Reserve accretion: 83.56 Mtoe the highest in last 2 decades FY’11: Reserve Replacement Ratio (RRR) is 1.76 (with 3P) (Mtoe) 82.98 83.56 68.90 65.56 63.82 FY'07 FY'08 FY'09 FY'10 FY'11 24 Mtoe: Mill

Slide 25: ONGC: O+OEG Production
ONGC: O+OEG Production Domestic O+OEG production level maintained 52.79 52.96 52.45 52.06 52.60 Crude oil production (MMT) FY’10 FY’11 ONGC 24.67 24.42 PSC-JV 1.79 2.86 Total 26.46 27.28 Natural gas production (BCM) FY‟10 FY‟11 ONGC 23.11 23.09 PSC-JV 2.49 2.23 Total 25.60 25.32 FY'07 FY'08 FY'09

Slide 26: ONGC: O+OEG production
ONGC: O+OEG production ONGC accounted for 57% of country’s O+OEG production in FY’11 Crude oil: 82% & Natural Gas: 48% Crude oil production Natural gas production OIL 5% ONGC OIL 82% Others 11% 47% ONGC 48% Others 7% ONGC’s production includes its share in PSC JVs Source: MoP&NG 26

Slide 27: ONGC: IOR/EOR gains
ONGC: IOR/EOR gains Arresting decline rates in matured fields through IOR/EOR schemes Recovery factor increased from 28% (2000) to 33.5% (2011) 35 15 of 21 IOR/EOR/Redevelopment projects completed 30 Incremental gain in FY‟11: 8.48 MMT 25 Cumulative Gain through IOR/ EOR ~ 66 MMT 20 Offshore 15

Slide 28: 3. Performance FY'11 ONGC: Financials
3. Performance FY’11 ONGC: Financials

Slide 29: ONGC: Turnover
ONGC: Turnover Turnover up by 12% ` Crore Revenue Sources (` Crore) 69,532 45,483 46,103 FY'10 FY'11 65,049 61,543 61,983 12% 59,058 13,051 7,942 8,305 8,519 FY'07 FY'08 FY'09 FY'10 FY'11 Oil Gas VAP 29

Slide 30: ONGC: Net Profit
ONGC: Net Profit Highest-ever Net Profit; up by 13% ` Crore 18,924 Crude oil price realization (US$/bbl) 15,643 16,702 16,126 16,768 Realizable Discount Realized 13% FY’07 66.33 22.11 44.22 FY’08 85.54 32.64 52.90 FY’09 86.15 38.45 47.70 FY’10 71.65 15.71 55.94 FY’11 89.41 35.64 53.76* FY'07 FY'08

Slide 31: ONGC: Under Recovery
ONGC: Under Recovery FY’11: Total under-recovery ` 24,892.43 Crore Under Recovery (` Crore) Impact on PAT (` Crore) 28,225 24,892 22,001 15,798 14,247 17,024 13,241 10,333 11,956 11,554 7,210 6,551 4,104 2,690 2,553 1,596 FY’04 FY’05 FY’06 FY’07 FY’08 FY’09 FY’10 FY’11 FY’04 FY’05 FY’06 FY’07 FY’0

Slide 32: ONGC: Dividend
ONGC: Dividend Highest-ever Dividend payout of ` 7,486 Crore FY’11: Bonus (1:1) and Share split to ` 5 face value 7,486 Dividend payout ratio (%) 6,844 6,844 7,058 6,631 60 With tax 50 Percentage 40 350% 330% Without tax 320% 320% 30 310% 20 10 Payout in the range of 40-50% 0 FY'07 FY'08 FY'09 FY'

Slide 33: ONGC: Net worth
ONGC: Net worth Net worth up by 12% (` Crore) 96,709 86,441 78,085 69,944 61,410 FY'07 FY'08 FY'09 FY'10 FY'11 33

Slide 34: 3. Performance FY'11 ONGC Videsh Ltd.
3. Performance FY’11 ONGC Videsh Ltd.

Slide 35: ONGC Videsh Ltd. (OVL)
ONGC Videsh Ltd. (OVL) OVL wholly owned subsidiary of ONGC International E&P company operating in 14 countries with 33 projects India’s biggest MNC & second largest E&P company in India Overseas investment more than `59,000 Crore 35

Slide 36: OVL: Global footprint
OVL: Global footprint 4 Under 9 33* Projects in 14 Countries 18 Exploration Development Producing 1 Kazakhstan Venezuela 1 1 2 Russia Cuba 2 2 Myanmar Colombia 5 1 1 1 Vietnam Brazil 5 1 Libya 1 1 Iran Nigeria 2 1 Iraq 1 1 Syria Sudan 2 * 33rd Project is Sudan’s 741 km long completed Pipeline 36

Slide 37: OVL: O+OEG reserves
OVL: O+OEG reserves 435 Mtoe of ultimate reserves in 12 assets in 8 countries Geographical distribution Oil Gas Total Venezuela 15% Sudan (MMT) (BCM) (Mtoe) 10% P1 104.57 98.34 202.91 Myanmar Vietnam 9% 4% P2 151.91 46.69 198.60 Syria P3 13.98 19.51 33.49 2% Russia Brazil Total 270.46 164.55 435.0

Slide 38: OVL: O+OEG production
OVL: O+OEG production OVL registers highest-ever production: 9.45 Mtoe of O+OEG 7.95 8.80 8.78 8.87 9.45 2.69 1.96 2.22 2.38 Odoptu field in Sakhalin commenced 2.15 production from 15th Sept’2010 present production @54,000bbl/d 6.84 6.56 6.49 6.76 5.80 Gas production adds on from BC-10 Brazil FY '

Slide 39: OVL: O+OEG production
OVL: O+OEG production 9 producing assets in 7 countries Block 5A, Sudan 0.226 Gas (BCM) Oil (MMT) MECL, Colombia 0.468 BC10, Brazil 0.573 0.015 AFPC, Syria 0.647 Sancristobal, Venezuela 0.757 Imperial Russia 0.770 GNOP, Sudan 1.801 Sakhalin-1, Russia 0.415 1.474 2.249 Blcok6.1,Vietnam 0.038 39

Slide 40: OVL: Financials
OVL: Financials Highest-ever Turnover of ` 18,683; up by 21% Turnover (` Crore) PAT (` Crore) 18,424 18,683 16,866 15,383 2807 2691 11,795 2397 21% 2090 1663 29% FY'07 FY'08 FY'09 FY'10 FY'11 FY'07 FY'08 FY'09 FY'10 FY'11 40

Slide 41: Satpayev Block, Kazakhstan
Satpayev Block, Kazakhstan Acquired 25% participative interest in Satpayev exploration block in Kazakhstan, OVL signed agreement with KazMunaiGas on 16th April 2011 Satpayev: a shallow water offshore block Agreement signed on 16th April 2011 in presence of Dr. Manmohan Singh, Hon’ble Prime Min

Slide 42: OVL signs MOU with Uzbekneftegaz
OVL signs MOU with Uzbekneftega MOU for cooperation in E&P sector in Uzbekistan & third countries OVL signed MOU with Uzbekneftegaz (UNG) on 17th May, 2011 in presence of H.E. Mr. Rustam Azimov, First Deputy Prime Minister, Minister of Finance of Uzbekistan 42

Slide 43: 3. Performance FY'11 MRPL
3. Performance FY’11 MRPL

Slide 44: MRPL
MRPL 11.82 MMTPA capacity state-of-the-art Refinery Acquired majority stake & Management control on 28th March’2003 Currently holds 71.62% of equity (HPCL: 16.96% & others: 11.42%) Capacity being expanded to 15 MMTPA with estimated investment of ` 12,160 Crore Likely commissioning: Dec’201

Slide 45: MRPL: Thru'put
MRPL: Thru’put Highest-ever Refinery Thru’put FY’11: Capacity utilization 107% Thru’put (MMT) 12.53 12.55 12.59 12.50 12.64 10th May‟2011 Bagged Petrofed „Refinery of the Year‟ award for excellent performance during FY’10 FY'07 FY'08 FY'09 FY'10 FY'11 45

Slide 46: MRPL: Financials
MRPL: Financials Highest-ever Turnover; PAT up by 6% FY’11: export of product worth ` 14,604 Crore FY’11: Dividend @12% Turnover (` Crore) PAT (` Crore) 42,719 43,800 37,339 36,141 1,272 32,208 1,193 1,177 1,112 21% 6% 525 FY'07 FY'08 FY'09 FY'10 FY'11 FY'07 FY'08 FY'09 FY'10 FY'11 46

Slide 47: Initiatives
Initiatives

Slide 48: East Coast Offshore Development
East Coast Offshore Development East coast discoveries to be monetized in 3 phases KG Basin Reliance Projects RAVVA G4-2 Discovery 2002 1. G-1 & GS-15 D-1 GS-15/23/KW N-1 2. S-1 & Vashista E-1 M-1 F-1 3. KG-DWN-98/2 P-1 C-1 A-1 B-1 4. G-4-6, GS-29-1 & G-4-5 G-W R-1 G-1 Q-1 G-E H-1 R-2 VA-1 VA-2 W-1

Slide 49: Daman offshore development
Daman offshore development Fast track development of prospects around B-12 & C-24 C - 2 3 C-24 to Fields considered for development: C-39 DAMAN Daman(Main), Daman (North), C-23 102 C-24 Kms C-24 & C-23 C-26 B-12 URAN 49

Slide 50: Major projects
Major projects New field development Sl. Project Project Cost (` Crore) 1 Development of C-series Fields Phase 1 3,195 2 Development of B-22 cluster Fields 2,921 3 Development of B-46 cluster Fields 1,457 4 Development of B-193 cluster Fields 5,633 5 Additional Development of D-1 Field 2,164 6 North

Slide 51: Major Projects
Major Projects IOR/ Redevelopment projects Sl. Project Project cost (` Crore) IOR/ Redevelopment Projects 1 Heera & South Heera Redevelopment 2,305 2 MHS Redevelopment Phase-II 8,813 3 MHN Redevelopment Phase-II 7,133 4 IOR Lakwa-Lakhmani 664 5 IOR Geleki 1,674 6 IOR Rudrasagar 439 E&P Infrastructur

Slide 52: Capex
Capex ` 104,610 Crore Capex in last 5 years FY’11: 98% of Capex on core activities 28,276 Capex FY’11 (` Crore) 23,559 21,820 Capital 17,651 projects 46% 13,305 Dev. Drilling 14% Expl. Drilling R&D 30% 2% Integration 2% FY'07 FY'08 FY'09 FY'10 FY'11 Survey Provisional 6% 52

Slide 53: Shale gas
Shale gas Shale gas strikes in first R&D well in Damodar valley Shale gas integrated Pilot project to drill 4 wells, 2 in Raniganj, West Bengal and 2 wells in North Karanpura, Jharkhand to find the potential of Shale gas in India basins. First well RNSG-1 proved presence of Shale gas on 25th Jan

Slide 54: Wind Farm
Wind Farm 51 MW Wind farm commissioned in Gujarat in 2008 102 MW Wind farm planned to be set up in Rajasthan Investment ` 800 Crore Likely commissioning in FY’14 First 51 MW wind farm commissioned in Gujarat on 6th Sept 2008 54

Slide 55: Value-multiplier projects
Value-multiplier projects ONGC Petro-additions Ltd. To produce: HDPE/LLDPE, Poly Propylene, Benzene Scheduled completion Q3, FY’13 ONGC Mangalore Petrochemicals Ltd. To produce Paraxylene/ Benzene Scheduled completion Q4, FY’12 ONGC Tripura Power Company Ltd. 726.6 MW Gas based power plant

Slide 56: Corporate Social Responsibility
Corporate Social Responsibility CSR allocation 2% of the net profit CSR: Core areas Education, Health Care, Entrepreneurship development, heritage sites protection, Women empowerment, Girl child development, Water management, etc. 300 1.8 CSR (Rs. Crore) % of PAT 1.60 1.6 250 1.4 200 1.2 1.01 1.05 1

Slide 57: Carbon Management
Carbon Management 19 CDM Projects approved 6 registered with UNFCCC (accruable CERs 209,640 per annum for 10 years) 2 under registration (accruable CERs 25,000+ per annum for 10 years) 4 under development (accruable CERs 45000+ per annum for 10 years) Uran Flare Gas recovery Unit: 97,740 CER

Slide 58: Integrity Pact
Integrity Pact Transparency International recognizes ONGC’s ethical & transparent business practices ONGC occupies the Top rank in “Organizational Disclosure Practices” followed by Eni, Scores 100%, Jointly shares BP and Chevron, amongst 44 top rank with Woodside joint PDVSA, global oil & gas BG and

Slide 59: 59
59
Source: Internet Archive copy of ongcindia.com
More decks from Oil & Natural Gas Corp. Ltd.
Investor Presentation (August 2026)35 slides · Aug 31, 2026
Corporate Update (October 2025)9 slides · Oct 13, 2025
Investor Presentation (August 2025)36 slides · Aug 29, 2025
FY2024 Earnings Presentation41 slides · May 21, 2024
Investor Presentation (August 2023)44 slides · Aug 29, 2023
Investor Presentation (April 2023)40 slides · Apr 17, 2023