Alligator Energy Ltd · ASX:AGE

Alligator Energy — Red Cloud Securities Pre-PDAC (February 2025)

18 slides from Alligator Energy's conference presentation, Feb 28, 2025

  1. Slide 1: Advancing Samphire Uranium Project into Trial Production

    ASX:AGE For personal use only Advancing Samphire Uranium Project into Trial Production Red Cloud Securities Pre-PDAC Greg Hall – CEO – February 2025

  2. Slide 2: Disclaimer

    Disclaimer Forward Looking Statements This presentation contains projections and forward-looking information that involve various risks and uncertainties regarding future events. Such forward-looking information can For personal use only include without limitation statements based on current expecta

  3. Slide 3: Company Snapshot

    Company Snapshot Capital Structure (as at 29 Jan 2025) For personal use only Share Price $0.036 Ordinary Shares 3,873.6 M Perf Shares, Listed & Unlisted Options 462.2 M Cash as at 31 Dec 2024 $ 20.2 M Market Cap $140 M Top 50 Shareholders Brokers & Banks 19% Retail 45% Directors & Executives 5% Inst

  4. Slide 4: Investment Highlights – Alligator Energy Ltd

    For personal use only Investment Highlights – Alligator Energy Ltd (ASX: AGE) Tier One location Experienced Team Trial Production Samphire ISR Uranium Project in Exp ISR production team in place, ISR Field Recovery Trial planned South Australia, tier one location uranium Executives, marketing for H2

  5. Slide 5: Uranium and Nuclear Fuel market

    For personal use only Uranium and Nuclear Fuel market 5 Alligator Corporate Presentation | February 2025 | ASX:AGE

  6. Slide 6: Samphire Uranium project: South Australia – experience in uranium

    For personal use only Samphire Uranium project: South Australia – experience in uranium 6 Alligator Corporate Presentation | February 2025 | ASX:AGE

  7. Slide 7: Samphire Highlights

    For personal use only Samphire Highlights 20kms from JORC compliant Regional exploration Whyalla, SA resource opportunities Excellent regional 17.5 Mlbs uranium resource, Exploration Target infrastructure and satellite prospect to drill, with estimates additional skilled labour-force significant sco

  8. Slide 8: Samphire Uranium project: A highly competitive In-Situ Recovery project

    Samphire Uranium project: A highly competitive In-Situ Recovery project • Initial low capital cost estimate of A$131 million, despite significant contingencies totalling 35%. For personal use only • AISC at the lower end of cost curve, due to: Conceptual Model of ISR ➢ In-situ Recovery (ISR) amenabl

  9. Slide 9: Samphire Uranium Project – Dec 2023 Scoping Study: 1.2 Mlbs pa project

    Samphire Uranium Project – Dec 2023 Scoping Study† : 1.2 Mlbs pa project Study metrics* at US$75 / lb uranium price For personal use only A$131m 2.45 years 42% A$257m US$33.31/lb US$16.06/lb CAPEX Payback IRR* NPV8* AISC Cash Costs (including contingency) (post-tax, real, (post-tax, real, (A$47.58/l

  10. Slide 10: Samphire Uranium Project – Blackbush 2024 Drilling and resource update

    Samphire Uranium Project – Blackbush 2024 Drilling and resource update Significant uranium mineralisation intersections from Blackbush West uranium roll fronts has delivered further targets outside of the Inferred mineral resource. For personal use only Announced in ASX release dated 21 Nov 2024: •

  11. Slide 11: Further Extensions outside the Exploration Target Range Envelope

    Further Extensions outside the Exploration Target Range Envelope Ground Gravity Survey- April 2024 For personal use only • Exploration target range – additional 14 to 75 Mlbs • Ground gravity data shows outstanding continuity of the Samphire palaeochannel system by 34 lineal km’s. • 50% increase to

  12. Slide 12: Samphire Uranium Project – Field Recovery Trial (FRT)

    Samphire Uranium Project – Field Recovery Trial (FRT) • Field Recovery Trial (FRT) construction targeted for mid year pending PEPR (operating plan) regulatory approval. Plant fully For personal use only fabricated and delivered to AGE’s Whyalla yard. • FRT operation for 3-4 months and consists of th

  13. Slide 13: Samphire Uranium Project – Field Recovery Trial Plant

    Samphire Uranium Project – Field Recovery Trial Plant Pilot plant layout • Fabrication of the containerised FRT processing plant completed - delivered to AGE’s Whyalla For personal use only yard in July 2024. • Expressions of Interest to five Whyalla based companies for onsite civils and pilot plant

  14. Slide 14: 2025 Plans and Targets

    2025 Plans and Targets • Jan – Retention Lease approval with assigned conditions for Field Recovery Trial (FRT) • Feb – Submission of Program for Environment Performance and Rehabilitation (PEPR) – FRT operating plan For personal use only • Feb – Start of second exploration program on Big Lake Urani

  15. Slide 15: 2025 Plans and Targets

    For personal use only 2025 Plans and Targets 15 Alligator Corporate Presentation | February 2025 | ASX:AGE

  16. Slide 16: Exploration projects

    For personal use only Exploration projects NT, AUSTRALIA Alligator Rivers ITALY (ARUP) High Grade U Piedmont NW Ni-Co-Cu-Au-PGEs SA, AUSTRALIA Big Lake (Cooper Basin) ISR style U SA, AUSTRALIA Investment in EnviroCopper Ltd Copper ISR 16 Alligator Corporate Presentation | February 2025 | ASX:AGE

  17. Slide 17: Big Lake Uranium - Inaugural Drilling Program Discovery Success

    Big Lake Uranium - Inaugural Drilling Program Discovery Success • Inaugural drilling program intersected significant thicknesses of anomalous uranium mineralisation within interbedded palaeochannel sand units in the Namba Formation. For personal use only • Discovery is first proof of concept that si

  18. Slide 18: For personal use only

    For personal use only ASX:AGE Greg Hall CEO +61 (0) 7 3839 3904 gh@alligatorenergy.com.au www.alligatorenergy.com.au

Alligator Energy — Red Cloud Securities Pre-PDAC (February 2025) on 6ix