R ES O U RCES L TD AB N 3 5 0 0 0 6 8 9 2 1 6 For personal use only 2 April 2009 Manager Announcements Company Announcements Office ASX Limited 20 Bridge Street Sydney NSW 2000 Dear Sir, PRESENTATION Attached is a copy of a presentation to the Paydirt’s Gold Conference being held in Perth, WA. A cop
Slide 2: Back Into Gold Production - Corporate Profile
ALKANE RESOURCES LTD ABN 35 000 689 216 For personal use only “BACK INTO GOLD PRODUCTION” PAYDIRT’S GOLD CONFERENCE Perth 2 April 2009 www.alkane.com.au CORPORATE PROFILE ASX Code ALK (listed since 1969) Issued Capital 244.6m shares Cash (31/12/08) ~A$8.0m Investments: BC Iron ~A$4.0M Trad
Slide 3: Australia – project locations
Australia – project locations For personal use only Nullagine BC Iron 9M shares = 15% Leinster Nickel JV Central West NSW Xstrata Nickel Gold – Copper Rare metals Perth Sydney 500 km Project Central West NSW Alkane Projects TGP Gold DZP Copper - gold Newmont JV Gold - copper All Alkane projects with
Slide 4: Tomingley Gold Project Location and Geological Summary
For personal use only Tomingley Gold Project Dubbo Zirconia Project and Dubbo Zirconia Project Location Wyoming Caloma Peak Hill 153,000ozs produced 450,000oz in sulphide resource Tomingley Gold Project Geological Summary Wyoming - Caloma 60,000oz 1km 270,000oz Pelitic Sediments 3km Feldspar porphyr
Slide 5: Tomingley Gold Project Wyoming One
Tomingley Gold Project Wyoming One For personal use only North – South Section 9m @ 12.5g/t Au 614075mE 85m @ 2.15g/t Au 6m @ 9.53g/t Au Initial Pit Profile Alluvium Cotton Formation 12m @ 6.22g/t Au Feldspar porphyry Volcaniclastic sediments 18.4m @ 5.74g/t Au 12.5m @ 7.88g/t Au 7.2m @ 11.06g/t Au
Slide 6: Tomingley Gold Project Caloma
Tomingley Gold Project Caloma For personal use only East – West Section 6394140 Alluvium Cotton Formation Feldspar porphyry Volcaniclastic sediments Dolerite Volcaniclastic conglomerate Initial Pit Profile Epidote altered volcanics Chlorite-talc schist Andesitic volcanics Tomingley Gold Project Calo
Slide 7: Tomingley Gold Project Resource Summary
TOMINGLEY GOLD PROJECT Resource Summary Wyoming One and Three, Caloma March 2009 For personal use only 0.75g/t gold cut off. Measured 4.89 Mt @ 2.37g/t gold 372,000 oz 44% Indicated 1.42 Mt @ 2.70g/t gold 123,000 oz 14% Inferred 5.08 Mt @ 2.16g/t gold 353,000 oz 42% TOTAL 11.39 Mt @ 2.32g/t gold 848
Slide 8: Tomingley Gold Project Development Summary
Tomingley Gold Project For personal use only Tomingley Proposed Site Layout Wyoming Three CIL Plant Caloma Residue storage Wyoming One Underpass 500 metres Highway TOMINGLEY GOLD PROJECT Development Summary Definitive Feasibility Study program well advanced, and scheduled for mid 2009 Program includ
Slide 9: Tomingley Gold Project Possible Project Economics
40,000 For personal use only Tomingley Gold 3,500 Project Water 40km Infrastructure TGP Site Population Power 16km 1,400 14,000 TOMINGLEY GOLD PROJECT Possible Project Economics Current Concept: 0.75 to 1Mtpa open pit to produce an average 50-70,000oz pa Capital cost A$50 million+/- 20% Minimum five
Slide 10: Orange Area Regional Geology and Prospects
Orange Area Regional For personal use only Location Carlin and Ridgeway type porphyry targets Newmont Joint Venture Molong and Moorilda NMA to spend $5M before Cadia Valley Aug 2010 to earn 51% +50Moz Can go to 75% by carrying all expenditures to final BFS Orogenic (structural) gold targets ODEJV Mo
Slide 11: ODEJV Moorilda McPhillamys Drill Section
ODEJV Moorilda For personal use only McPhillamys Drill hole locations Section 600m with IP chargeability Target potential 2.5 Moz ? 200m ODEJV Moorilda McPhillamys Drill Section 6292250mN Strongly foliated dacitic schist 450m Med-coarse grained dacitic volcaniclastic Coarse grained volcaniclastic co
Slide 12: ODEJV McPhillamys Conceptual Target Size
ODEJV Moorilda McPhillamys Conceptual Target Size For personal use only Basic area currently defined at + 1g/t gold ~ 500m x 150m x 85% = 64,000m2 To vertical depth of 400m = ~25 million m3 Tonnage @ 2.8 sg = ~75 million tonnes Grade @ 1.0g/t gold = ~2.3 million oz The +0.5g/t envelope is open to th
Slide 13: Dubbo Zirconia Project Resources
ODEJV McPhillamys Project: RC Drill August 2008 For personal use only DUBBO ZIRCONIA PROJECT RESOURCES Measured Resource : 35.7 million tonnes grading 0 - 55 metres 1.96% Zr02, 0.04%HfO2, 0.14% Y2O3 0.46% Nb2O5, 0.03% Ta2O5 , 0.014% U3O8, and 0.75% REO Inferred Resource : 37.5 million tonnes at simi
Slide 14: Dubbo Zirconia Project Process Flow Sheet
DUBBO ZIRCONIA PROJECT PROCESS FLOW SHEET For personal use only DUBBO ZIRCONIA PROJECT PROCESS FLOW SHEET Base case models of 200,000 to 500,000 tonnes per year of ore processed Product 200ktpa 500ktpa ZBS, ZOH, ZCO 9,000tpa(3ktpa ZrO2) 22,500tpa(7.5ktpa ZrO2) Nb-Ta concentrate 1,000tpa(0.7ktpa Nb2O
Slide 15: Dubbo Zirconia Project Product Market Summary
DUBBO ZIRCONIA PROJECT Product market summary For personal use only Zirconium: drying agent in paints; primer coat of vehicle metalwork; ceramic pigments; engineering ceramics; catalysts; electronics; solid oxide fuel cells cladding in nuclear power plants; special alloys and glasses Hafnium: contro
Slide 16: The Project Pipeline
The Project Pipeline For personal use only PROJECT 2008 2009 2010 2011 2012 2013 TGP Wyoming Caloma Peak Hill DZP ODEJV McPhillamys ? ? ? ? ?? Wellington Galwadgere Exploration Resource Feasibility Construction Production ALKANE RESOURCES LTD ABN 35 000 689 216 Multi Commodity Development in the Cen