Truscott Mining Corporation Ltd · ASX:TRM

Truscott Mining — Investor Presentation (May 2008)

13 slides from Truscott Mining's investor presentation, May 8, 2008

  1. Slide 1: Truscott Mining Corporation Limited

    For personal use only Truscott Mining Corporation Limited ASX ASX Listed Listed Company Company (Code (Code :TRM) :TRM) The The Tennant Tennant Creek Creek Mineral Mineral Field Field prospective prospective for for gold gold and and base base me metals. tals. Truscott Truscott Mining Mining Corpora

  2. Slide 2: Tennant Creek History: High Value Past Producers

    Tennant Creek History: High Value Past Producers For personal use only Major Gold – Highest Bismuth – Significant Copper Historical Production Statistics 1 Warrego Au 1 432 000 oz @ 6.6g/t Bismuth 12 000 t @ 0.3% Copper 174 000 t @ 1.9% 2 Gecko Au 150 000 oz @ 1.6g/t Copper 119 000 t @ 3.6% 3 White

  3. Slide 3: Truscott Project Locations

    Truscott Project Locations For personal use only Mineral Occurrences Westminster Diamond Drilling Ewan Edward (South) RC Drilling Zooming into the centre of the field we locate Truscott’s project areas Westminster and Ewan Edward adjacent to a number of historical producers. The output from some of

  4. Slide 4: Conceptual Model

    Conceptual Model For personal use only Typical Mineralisation - Ore Package Nobles Nob Mine Before commencing the search for new ore bodies it is useful to understand the characteristics of our targets. The dextral shear zones contain packages of altered (green) and mineralised (blue) ironstone (mag

  5. Slide 5: Westminster Systematic Exploration – Stage One

    Westminster Systematic Exploration – Stage One For personal use only Investigating the larger shear corridors that host mineralisation mineralisation to provide a context for structural setting. Having determined that the shear corridors are important delineators for the distribution of mineralised

  6. Slide 6: Systematic Exploration – Stage Two

    Systematic Exploration – Stage 2 For personal use only Defining subsidiary zones within the constrained corridors that may host discrete high grade targets. Detailed geological mapping is now initiated across the constrained corridor prior to the commencement of structural drilling designed to ident

  7. Slide 7: Systematic Exploration – Stage Three

    Systematic Exploration – Stage 3 For personal use only Testing discrete targets within inner subsidiary zones for high grade mineralisation. Mineralisation Profile Carbonate Zone: BBDH1 23.3m @ 0.7g/t Au DH005 43.4m @ 89ppm U3O8 Copper Transition: DD003 0.35m @ 11.2% Cu, 0.3% Pb DD008 0.8m @ 0.49% C

  8. Slide 8: Ewan Edward

    Ewan Edward For personal use only Systematic exploration now at stage 2 – defining structural corridors and planned drilling to define zones that may bound mineralisation. Gravity Survey 1HD Ewan Edward is a larger exploration area at an earlier stage of development than the Westminster Project area

  9. Slide 9: Infrastructure

    Infrastructure For personal use only Tennant Creek – Darwin Corridor Peko Plant Peko Tailings Dump Tennant Creek Gas Power Plant A services corridor including road, rail and a gas pipeline exists between shipping locations at Darwin and Tennant Creek. The infrastructure associated with the town was

  10. Slide 10: Logistics

    Logistics For personal use only Product Freight Options Tennant Creek Train Station Mr Kevin Alexander, MSc (Exploration & Mining) Truscott can effectively control 100% of all output from the projects with no off take rights or clawback provisions from previous explorers existing. Production from th

  11. Slide 11: Business Statistics as of 28th April 2008

    Business Statistics as of 28th April 2008 For personal use only High leverage to success. Directors Peter N Smith Executive Chairman Michael J Povey Executive/ Company Secretary Kevin Alexander Non Executive Derrick Sufredo Non Executive Mr Peter Smith, M Min Tech, BSc (Min) Capital Overview Major S

  12. Slide 12: For personal use only

    Cu Au Bi Co U REE For personal use only • Historical High Grade - Value Production. • Highly Prospective Project Areas. • Advanced Exploration Targets. • Qualified Experienced Geologists. • Commercial Leverage on Success. We have a professional group of Geologists. - who are very excited about our o

  13. Slide 13: Disclaimer

    Disclaimer For personal use only This presentation has been prepared by Truscott Mining Corporation Limited (“Truscott” or the “Company”). It should not be considered as an offer or invitation to subscribe for or purchase of any securities in the Company or as an inducement to make an offer or invit

Truscott Mining — Investor Presentation (May 2008) on 6ix