Oriana Power Limited · NSE:ORIANA
Oriana Power — Investor Presentation (August 2024)
23 slides from Oriana Power's investor presentation, Aug 6, 2024
Slide 1: Intimation under Regulation 30 to NSE
To, Listing Department, National Stock Exchange of India Ltd Exchange Plaza, Bandra Kurla Complex, Bandra (East) Mumbai– 400051 Dear Sir Ref: Intimation under Regulation 30 of SEBI (Listing Obligations and Disclosures Requirements) Regulations,2015-Publication Symbol: ORIANA ISIN: INE0OUT01019 Accor
Slide 2: Oriana Power Announces Electrolyzer Gigafactory for Green Hydrogen and E-Fuels
Oriana Power Limited Announces Electrolyzer Gigafactory for Green Hydrogen and E-Fuels Gigawatt Scale Factory for producing Electrolyzer and BOP modules for Green Hydrogen and E- Fuels Factory to be commissioned in two phases, with the first 500 megawatts (MW) phase to be operational by 2026 C
Slide 3: About Oriana Power
About Oriana Power Oriana Power is a leading renewable energy company in India, known for its premium, affordable, and customized renewable energy solutions. As one of the leading providers of specialized floating solar solutions, agro photovoltaics, ground mounted, rooftop in the country, Oriana Po
Slide 4: Oriana Power Limited – Change is NOW
Change is NOW Oriana Power Limited Investor Presentation Aug 2024
Slide 5: Safe Harbour
Safe Harbour Certain statements in this document may be forward looking statements. Such forward looking statements are subject to certain risks and uncertainties like government actions, local, political or economic developments, technological risks, and many other factors that could cause our actu
Slide 6: Leadership Driving Innovation: Meet Our Board
Leadership Driving Innovation: Meet Our Board • 18+ years of experience • Decade of Solar Excellence: His 16-year solar industry tenure spans operational excellence, technology, business growth, financing, acquisitions and global expansions • Innovative Leadership at an International Firm: Before Or
Slide 7: Operational Excellence: Our Team Strength
Operational Excellence: Our Team Strength CA Shivam Aggarwal, Tanvi Singh, Mohit Joshi, Gaurav Ranjan CFO Compliance Officer Projects Development Business Development Vipin Duseja Kavita Gupta Narender Kumar Pravin Gupta Strategy & Growth Human Resource Design & Engg. SCM 4
Slide 8: Core Business Verticals: Oriana RE Spectrum
Core Business Verticals: Oriana RE Spectrum • EPC (Engineering, Procurement & Construction) 01 Solar • • IPP (Independent Power Producer) Solar Rooftop Compressed 02 Biogas • EPC (Engineering, Procurement & Construction) Battery • EPC (Engineering, Procurement & Construction) 03 Energy Storage • • S
Slide 9: Cumulative projects delivered
Cumulative capacity under Execution Cumulative projects Credit Rating 390+ delivered BBB* CRISIL MW 240+ Stable MW Capacity 900+ in Pipeline Team Strength MW 150+ Presence in 2 CBG: 21 TPD under execution Continents & 11+ 30 TPD in pipeline 22 Indian States Establishment years BESS: 50 MWh in pipeli
Slide 10: Strategic Initiatives: Driving Excellence and Innovation
Strategic Initiatives: Driving Excellence and Innovation Digital Transformation - Implementation of SAP and 1 other project dashboarding leading to better transparency across all operation levels Innovative Technology - Site Survey & Feasibility 2 Assessment using drone-based SaaS Platform Sustainab
Slide 11: India's Renewable Energy Market
India’s Renewable Energy Market 8
Slide 12: Key Highlights of India's RE Market
Key Highlights of India’s RE Market 1 World's third-largest market for electricity One of the world's lowest per capita usage of power 2 is expected to fuel future demand Demand for electricity to double in 12 years, 3 Renewable Energy to provide majority supply Tariffs for Renewable energy are subs
Slide 13: India's Renewable Energy Industry at a Glance
India’s Renewable Energy Industry at a Glance India’s Green Vision 2030 India's 2030 vision focuses on Renewable energy dominance and green growth to combat climate change and enable energy transition. Guided by the Panchamrit Policy, India sets ambitious targets to initiate a Renewable revolution.
Slide 14: Recent Updates from the Indian RE Industry
Recent Updates from the Indian RE Industry • Ambitious Capacity Targets: India has set an ambitious goal of achieving 500 GW of non-fossil fuel-based capacity by 2030. This target was announced at COP-26 (IISD) • National Green Hydrogen Mission: Launched in 2023, the target is to produce at least 5
Slide 15: Where We Are
iTrueRE ‘RIANA POWER LIMITED ims 1 12
Slide 16: Diverse Renewable Energy Portfolio and Nationwide Presence
Diverse Renewable Energy Portfolio and Nationwide Presence Oriana has diverse portfolio of projects spread across 22 states in India Land Bank Tied ~920 Acres across India for Renewable Energy purpose and adding more Rajasthan, UP, Maharashtra, Tamil Nadu, Haryana, Karnataka, Odisha Going ahead, we
Slide 17: Updates since March 2024
Updates since March 2024 • Strategic tie-up with US-based Green Hydrogen manufacturer, Splitwaters • Giga-factory with 500 MW capacity to be operational by 2026 and another 500 MW to be added in 2027 • Verticalization of business structures for rapid and focused growth – Green Hydrogen, BESS, CBG, S
Slide 18: What's Next
What’s Next TT iTrueRE ‘RIANA POWER LIMITED us
Slide 19: Looking Ahead: Vision 2030
Looking Ahead: Vision 2030 Solar Our aim is to achieve 6 GW+ EPC capacity & 01 (EPC & IPP) 2.5 GW+ IPP capacity Green 02 Giga factory to be set up by 2026 with 500 MW H2 Hydrogen capacity and another 500 MW capacity by 2027 Battery Our vision is to be a credible significant player in 03 Energy Stora
Slide 20: Summary: Rapidly growing TrueRE Company
Summary: Rapidly growing TrueRE Company 1 Oriana has been on a path of Multi X growth 2 Oriana is shaping the business in complete horizon of RE space 3 Verticalizing business structures for rapid and focussed growth 4 Technology tie-ups with leading global partners 5 Bullish on Green Hydrogen targe
Slide 21: Disclaimer (1/2)
Disclaimer (1/2) "This presentation and the accompanying materials (the "Presentation") are provided by Oriana Power Limited ("Company") as of the date of this presentation. This Presentation is intended to share selected information regarding the activities and financial position of the Company. It
Slide 22: Disclaimer (2/2)
Disclaimer (2/2) This Presentation may contain forward-looking statements, including statements regarding the company's business strategy, financial performance, and plans for future development. These statements are based on the current expectations and projections about future events and are subje
Slide 23: Thank You
THANK YOU www.orianapower.com 20