Eurobattery Minerals Ab · NGM:BAT

Eurobattery Minerals Ab — Investor Presentation (January 2022)

37 slides from Eurobattery Minerals Ab's investor presentation, January 2022

  1. Slide 1: Corporate presentation

    > ‘Euro: BATTERY A, MINERALS Corporate pres¢ \tation :

  2. Slide 2: Important information

    Important information The release, publication or distribution of this presentation in certain jurisdictions may be restricted by law and therefore persons in such jurisdictions into which this presentation is released, published or distributed should inform themselves about and observe such restric

  3. Slide 3: Our Universe

    Our Universe We are the foundation of the electric revolution.

  4. Slide 4: What we do

    What we do Ethical and fully traceable battery minerals from Europe.

  5. Slide 5: Market Insights

    Market Insights

  6. Slide 6: The Electric Revolution

    The Electric Revolution (a E By 2030, total EV sales will reach Battery demand will increase “a The EU climate goal says by 31.1 MILLION 14-FOLD from 2.5 million in 2020. compared to 2018 by 2030. YEAR 2050 the region will be climate neutral. EURO BATTERY “&\_ MINERALS

  7. Slide 7: The demand for battery minerals

    The demand for battery minerals • Forecast for European In tons demand for copper, cobalt and nickel • The production of electric cars and plug-in hybrids in Europe is increasing Source: Critical Materials and E-mobility, report by Aperio and Eurobattery Minerals Read the report

  8. Slide 8: Consumer behaviour

    Consumer behaviour 52% of consumers say they would refrain from 42% state that they are willing to pay more buying a car if they know the battery minerals were for a car if the battery minerals are sourced sourced in an unsustainable way. more sustainably. Not affect decision Negative 16% Affect 25%

  9. Slide 9: EU and the electric revolution

    EU and the electric revolution 1. Geopolitically important to focus on raw material sourcing from within the EU Despite the fact that Europe hosts very large automotive industry players, only 2 percent of the batteries needed in the EU are produced within the region 2. Sustainability focus driving l

  10. Slide 10: Ethical and sustainability issues

    Ethical and sustainability issues • Majority of all battery minerals extracted outside Europe • Pollutions due to lack of control and old methods • Child labour and poor working conditions • Lithium mining in Congo compared to blood diamonds

  11. Slide 11: With this in mind, our vision is very clear

    With this in mind, our vision is very clear

  12. Slide 12: Our vision

    Our vision Help Europe to become self-sufficient in ethical and fully traceable battery minerals.

  13. Slide 13: Our primary focus

    Our primary focus 28 27 Ni Co Nickel Cobalt REE Rare Earth Vanadium Elements

  14. Slide 14: The world of battery minerals mining today

    The world of battery minerals mining today ”There can be no growth and sustainability of the mining industry without human rights” Deprose Muchena, Director for East and Southern African at Amnesty International Source: Statista

  15. Slide 15: Projects

    Projects

  16. Slide 16: Europe is our focus

    Europe is our focus 28 Ni Nickel 27 Co Cobalt 29 Cu Copper 28 27 29 Ni Co Cu Nickel Cobalt Copper 29 28 23 42 Cu Ni V Mo Copper Nickel Vanadium Molybden 79 47 82 30 Au Ag Pb Zn Gold Silver Lead Zink 28 REE Nickel

  17. Slide 17: Business model

    Business model Eurobattery Minerals has several ongoing and parallel battery minerals projects in the different stages of the process. Exploration Resource definition Scoping study Feasability Study Development Production Reconnaissance drilling Infill drilling Preliminary technical study Detailed t

  18. Slide 18: Focus Hautalampi (Finland)

    Focus Hautalampi (Finland) • Located in the world famous Outokumpu Mining camp area, 345 km from Helsinki • Excellent location for mine development; strong local support for mining; municipality evolved from mining town into industrial centre • Ideally positioned for the burgeoning EV battery manufa

  19. Slide 19: Focus Hautalampi (Finland)

    Focus Hautalampi (Finland) • Over 530 drill holes completed on Project area for 80,000m of drilling • Ore body delineated over 1,000m in strike, up to 150m wide and 30m thick • Strong technical aspects to processing with commercial grades of Ni-Co and Cu concentrates being produced: • 6% Ni, 1.7% Co

  20. Slide 20: Focus Corcel Projects (Spain)

    Focus Corcel Projects (Spain) • Located ~60km from La Coruna in the Mining friendly region of Galicia, NW Spain • Three prospect zones in Corcel; active Castriz and planned Monte Mayor and Monte Castello – all in close proximity • For the entire area, Eurobattery Minerals have a full mining license

  21. Slide 21: Focus Castriz Prospects (Spain)

    Focus Castriz Prospects (Spain) • Final drilling results in Castriz shows larger prospect zone than expected and confirms high amount of nickel and cobolt • Drilling confirms maximum assay results of up to 0.69% Ni, 0.28% Cu and 0.02% Co as identified in soil sampling • Mineral analysis underway to

  22. Slide 22: Slide 22

  23. Slide 23: Exploration target Castriz

    Exploration target Castriz Case High Base Low Pit depth 250m 200m 150m Pit width 250m 250m 250m Pit length 1,400m 1,400m 1,400m Pit wall angle 70° 70° 70° Density (g/cc) 2.7 2.7 2.7 Total tonnes 150.3Mt 134.0Mt 110.8Mt Strip ratio 0.5:1 0.5:1 0.5:1 Resource 100.2Mt 89.3Mt 73.9Mt Ni grade 0.5% 0.5% 0

  24. Slide 24: Focus Sweden

    Focus Sweden • Several licences in Sweden covering a total of 25.2 km2 • Conducted metallurgical and surface evaluations to asses potential of the different licences • Collaboration with the University of Uppsala and the University of Krakow on potential for rare earth minerals in the licenced areas

  25. Slide 25: The Company

    The Company

  26. Slide 26: Timeline major events

    Timeline major events 2019 DECEMBER 4 Eurobattery Minerals enter research agreement with 2021 OCTOBER 14 2019 APRIL 19 university of 2020 JUNE 17 2020 JULY 11 2020 OCTOBER 2021 JANUARY 15 Second drilling 2014 2019 FEBRUARY 24 Listed on NGM Uppsala and Krakow Henrik Johannsson Drilling campaign Eurob

  27. Slide 27: Partners / Projects

    Partners / Projects The Initiative for Responsible Mining Assurance (IRMA) is the answer The European Raw Materials Alliance (ERMA) aims to make Europe The purpose is to ensure that all Europeans benefit from safer to a global demand for more socially and environmentally economically more resilient

  28. Slide 28: A strong team with long experience

    A strong team with long experience CORE TEAM CORCEL TEAM HAUTALAMPI TEAM Roberto García Martinez Fernando Garro Novillo Jonás Camblor Fernández Markus Ekberg Matthias Müller CEO and member of the Board Project Manager Supervisor of Geological CEO and Co-owner of Chief Geologist Research Finncobalt O

  29. Slide 29: Management and board

    Management and board Roberto García Martínez, CEO and board member Henrik Johannesson, Chairman of the board Roberto has more than 25 years’ experience in the Henrik holds more than 20 years of international mining industry at the international level. During executive leadership experience, includin

  30. Slide 30: Strong Balance Sheet

    Strong Balance Sheet BALANCE SHEET EURO 2020 2019 ASSETS Total intangible assets 3.698.988 3.286.840 Total tangible assets 1.624 1.926 Total financial assets 1.101.207 8.750 Total fixed assets 4.801.819 3.297.515 Total current receivables 87.799 99.465 Cash and bank balances 4.172.485 645.579 Total

  31. Slide 31: Deliberate use of funds

    Deliberate use of funds INCOME STATEMENT EURO 2020 2019 Total operating income 20.151 1.478 Total operating costs -1.304.170 -1.136.340 Operating profit/loss -1.284.019 -1.134.862 Total profit/loss from financial items -85.547 -18.045 Earnings before tax -1.369.567 -1.152.907 Profit/loss for the yea

  32. Slide 32: First sales of minerals planned for 2023

    First sales of minerals planned for 2023 ANNUAL CASHFLOW Ag revenues 0.48% Au revenues 4.51% Cu revenues 16.37% Ni revenues 47.34% Co revenues 31.29% CAPEX total CASH FLOW

  33. Slide 33: The Eurobattery Minerals share

    The Eurobattery Minerals share Financial Information Nordic Growth Market (NGM) BAT Börse Stuttgart (SWB) EBM Number of outstanding shares (31.12.21) 15,719,503 Number of shareholders (31.12.21) 8,823 Company registration May 2015 Share Price and Market Capitalisation available at NGM Share Price an

  34. Slide 34: Shareholders 31.12.21

    Shareholders 31.12.21 • Total amount of shares: 15,719,503 • Top 10 hold 40,97% Kimberly Wrixon: 450,000 (2.86%) Six Sis AG: 461,082 (2.92%) Swedbank Försäkring 369,641 (2.35%) Ulex Recursos S.L.: 687,471 (4.37%) Avanza Pension: 761,715 (4.85%) Andrew Randall: 985,416 (6.27%) Clearstream Banking Ger

  35. Slide 35: Business Highlights

    Business Highlights 2020 2021 Final results from drilling show larger Listed on Börse Stuttgart under prospect zone than expected in Castriz the ticker EBM Investment agreement with option to Resource evaluation and estimation acquire the Hautalampi ni-co-cu mine after summer in Hautalampi JORC will

  36. Slide 36: Investment highlights

    Investment highlights Macro highlights Internal highlights Growth of EV EUs strategic We have Promising Ethical and market focus on battery licences results from our traceable minerals minerals projects

  37. Slide 37: Get in touch!

    Get in touch! Sign up for newsletter!

Eurobattery Minerals — Investor Presentation (January 2022) on 6ix