Turquoise Hill Resources Ltd.

Turquoise Hill Resources — BMO Global Metals & Mining Conference 2016

20 slides from Turquoise Hill Resources's conference presentation, Mar 2, 2016

  1. Slide 1: Developing the third-largest copper mine

    BMO Global Metals & Mining Conference FEBRUARY 28 – MARCH 2, 2016 Developing the third-largest copper mine

  2. Slide 2: Forward-looking statements

    Forward-looking statements This presentation includes certain “forward-looking information” within the meaning of applicable Canadian securities legislation and “forward-looking statements” within the meaning of the “safe harbour” provisions of the United States Private Securities Litigation Reform

  3. Slide 3: Investment summary

    Investment summary Open pit in production • Concentrator performance improving; currently averaging above nameplate capacity • All-In Sustaining Cost of $1.29 per pound of copper (September 2015) • Cash of $1.3 billion (September 2015) • Investment to date of > $6.5 billion Strong progress toward re

  4. Slide 4: Production highlights

    Production highlights Concentrator throughput ('000 tonnes) Concentrate production and sales (‘000 tonnes) Production Sales 819.8 34,537 788.5 733.7 27,872 563.6 215.5 210.3 226.0 231.8 236.2 9,025 8,632 9,369 189.8 7,512 167.7 130.9 Q1'15 Q2'15 Q3'15 Q4'15 2015 2014 Q1'15 Q2'15 Q3'15 Q4'15 2015 201

  5. Slide 5: Financial highlights

    Financial highlights Cash position ($'000,000) Operating cash flow ($'000,000) $1,310.4 $417.5 $1,200.0 $954.2 $862.8 $239.2 $171.7 $105.3 Cu: $2.97* Cu: $2.66 Cu: $2.77 Cu: $2.39 Au: $1,200* Au: $1,219 Au: $1,194 Au: $1,124 Q4'14 Q1'15 Q2'15 Q3'15 Q4'14 Q1'15 Q2'15 Q3'15 Strong cash position Consec

  6. Slide 6: Underground: next steps

    Underground: next steps Project Finance Feasibility Study • Signed in December 2015 • Revised development schedules submitted August 2015 • Drawdown expected Q2’16 after board approvals • Updated CAPEX estimate expected Q1’16 • Low-cost financing • Incorporates productivity • Aligns stakeholders/de-

  7. Slide 7: Project financing – flow of funds

    Project financing – flow of funds Today1 At project financing drawdown Payable to Turquoise Hill* Receivable from Oyu Tolgoi* Proceeds: $4.4 billion2 $4.1 billion3,4 $4.1 billion4 Shareholder loan: $6.8 billion Shareholder loan: $6.8 billion Payable to Turquoise Hill* Receivable from Oyu Tolgoi* Dep

  8. Slide 8: Medium-term timeline

    Medium-term timeline 2015 – 2016 2016 – 2021 2021 – 2026 2026 + • Project finance • Hugo North Lift 1 • First draw bell • Hugo North Lift 2 signed Construction production • Hugo South • Complete • Additional $1.6 billion • Ramp-up to full feasibility study project financing debt production • Board •

  9. Slide 9: Highly-attractive economics

    Highly-attractive economics Reserve Case (Feasibility Study) 2014 Reserve Case Total Processed (Bt) 1.5 Plant Copper Grade (%) 0.85 Gold Grade (g/t) 0.32 Oyut Open Pit Silver Grade (g/t) 1.94 Hugo North Copper Recoverable (B lb) 24.9 Lift 1 Gold Recoverable (M oz) 11.9 Silver Recoverable (M oz) 78.0

  10. Slide 10: Multiple development options

    Multiple development options Source: 2014 Oyu Tolgoi Technical Report Production creep targeted along with expansion Actual operating performance will inform choice of expansion path A decision to expand the concentrator is not required for a couple years 10

  11. Slide 11: Copper industry overview

    Copper industry overview Post-2020 copper mine C1+sustaining normal cost curve C/lb, 2015$ 400 Third largest copper Oyu Tolgoi mine after planned Other Mines expansion1 300 Top 10 copper deposit by contained reserves 200 and resource2 One of the largest gold 100 deposits by contained reserves and re

  12. Slide 12: Long-term copper fundamentals strong

    Long-term copper fundamentals strong Copper mine supply/demand outlook Copper market likely to see small surplus in coming years. Mt Base Highly Probable Primary Demand 30 Ongoing attrition at existing Forecast mines driven by declining 25 grade 20 Continued demand growth requires new capacity in th

  13. Slide 13: Turquoise Hill – a long-term growth opportunity

    Turquoise Hill – a long-term growth opportunity Pure copper and gold exposure Positive operating cash flow and focusing on asset optimization Agreed path forward for development of the high-grade underground mine Significant growth, development and expansion opportunities Resources located near Chin

  14. Slide 14: Appendix

    Appendix

  15. Slide 15: Probable development schedule

    Probable development schedule Complete Convey to Surface Sustainable Underground Production Complete Concentrator Project Start Upgrade Complete Ramp-up 1st Draw Bell Firing 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 Set-Up Excavation (Lateral / Mass / Vertical) Undercutting Ex

  16. Slide 16: Shaft and underground development status

    Shaft and underground development status Shaft 1 completed in 2008, 1,385m Off-shaft lateral development 16km 2008 – Aug 2013 Shaft 2 currently 1,167m, ~100m left Shaft 5 currently 208m, ~1,000m left Extensive geotechnical data collection program Demonstrated performance and quality 16

  17. Slide 17: Ore flow

    Ore flow APEX LEVEL Lateral Development lg UNDERCUT LEVEL ~-@ > eC Lateral Development Undercutting Undercut Mucking & Ground Support EXTRACTION LEVEL \vaa"/ «>t PB paid: Lateral Development & Ground Support Drawpoint / Drawbell Production Construction Secondary Breaking \ rere Foe: DUMP AT Fill Tru

  18. Slide 18: Oyu Tolgoi at China’s doorstep

    Oyu Tolgoi at China’s doorstep 18

  19. Slide 19: Made in Mongolia

    Made in Mongolia Mongolians now occupy 95% of Oyu Tolgoi roles Since 2010, in-country spend of $5.1 billion (Mongolian suppliers, salaries, taxes and other Government payments) Partnered with more than 800 local suppliers in 2015, accounting for over 50% of procurement spend In April 2015, Oyu Tolgo

  20. Slide 20: Summary of Underground Development Plan

    Summary of Underground Development Plan Concludes outstanding shareholder matters Resolves initial development costs Maintains Investment Agreement tax stability principles Tax settlement of $30 million Clarifies sales royalty calculation Eliminates 2% net smelter royalty Provides path forward for r