Cerro De Pasco Resources, Inc. · TSXV:CDPR

Cerro De Pasco Resources — Investor Presentation (May 2025)

19 slides from Cerro De Pasco Resources's investor presentation, May 28, 2025

  1. Slide 1: Positioned to Unlock the Value of the World's Largest Above-Ground Metal Resource

    Positioned to Unlock the Value of the World’s Largest Above-Ground Metal Resource

  2. Slide 2: Forward Looking Statements

    01 FORWARD LOOKING STATEMENTS Certain statements contained in this presentation constitute “forward applicable law, CDPR disclaims any intention or obligation to update economic viability, but do have reasonable prospects for economic looking information” or “forward-looking statements” under Canadi

  3. Slide 3: El Metalurgista Concession & Social License

    03 EL METALURGISTA CONCESSION & SOCIAL LICENSE One of the Largest Above-Ground Metal Resources In the World TSXV: CDPR OTC: GPPRF FRA: N8HP 3

  4. Slide 4: El Metalurgista Concession & Social License

    03 EL METALURGISTA CONCESSION & SOCIAL LICENSE One of the Largest Above-Ground Metal Resources In the World Excelsior Mineral Pile PROCESSING PLANTS 18K TPD permitted Not owned by CDPR Quiulacocha Tailings TSXV: CDPR OTC: GPPRF FRA: N8HP 4

  5. Slide 5: Quiulacocha Historical - Tailings AgEq

    04 QUIULACOCHA HISTORICAL - TAILINGS AgEq AVERAGE HEAD GRADE AND RECOVERY Tonnes Price Cu Pb Zn Ag Au Mining Period (000s) Cu Pb Zn Ag Au Copper Era (1906-1965) 16,369 4.0% _ _ 200 g/t 3 g/t Price (USD) 9,000 2,000 3,000 30 2,500 Polymetallic Era (1952-1992) 58,299 _ 3.3% 8.6% 98 g/t _ Unit Tonne To

  6. Slide 6: Historic Easement

    05 HISTORIC EASEMENT Land Easement Secured In May 2024, Cerro de Pasco Resources received a Supreme Resolution granting access to the El Metalurgista Concession for a 40-hole drilling campaign. Formalities Completed On May 29, 2024, Cerro de Pasco Resources finalized necessary steps— including a pay

  7. Slide 7: Quiulacocha Tailings / Phase 1 Drilling

    06 QUIULACOCHA TAILINGS / PHASE 1 DRILLING Sonic Drill, provides continuous, high-quality samples with minimal disturbance and no water usage, reducing environmental impact, enhancing resource recovery, and improving data quality. TSXV: CDPR OTC: GPPRF FRA: N8HP 7

  8. Slide 8: Quiulacocha Tailings / Phase 1 Drilling

    07 QUIULACOCHA TAILINGS / PHASE 1 DRILLING Freezer truck on-site to preserve micro- structural integrity and prevent oxidation. TSXV: CDPR OTC: GPPRF FRA: N8HP 8

  9. Slide 9: Quiulacocha Tailings / Phase 1 Assay Results

    08 QUIULACOCHA TAILINGS / PHASE 1 ASSAY RESULTS Recent Drilling 40 out of 40 drillholes assayed. Average Grade per Metal Metal Avg. Grade Ag 1.66 oz/t Zn 1.47% Pb 0.89% 4.3 oz/t AgEq* 5.5 oz/t Cu 0.09% AgEq* Reported Drillholes Au 0.10 g/t Ag-Zn-Pb Tailings Ga 53.2 g/t Ag-Cu-Au Tailings In 19.9 g/t

  10. Slide 10: Why Gallium - Highlights

    09 WHY GALLIUM - HIGHLIGHTS A Critical Metal Powering Technology & the Energy Transition The U.S. is 100% reliant on foreign gallium imports. In 2023, China banned gallium exports, posing a serious risk to national security and U.S. economic resilience. Discovery of the largest above-ground gallium

  11. Slide 11: U.S. Department of Defense & Gallium

    10 U.S. DEPARTMENT OF DEFENSE & GALLIUM The Pentagon, which has reserves of germanium but not gallium, plans to use its authority under the Defense Production Act for “prioritizing awards” by Dec.31, “focusing on recovery of gallium from existing waste streams or other products,” spokesman Jeff Jurg

  12. Slide 12: Quiulacocha TSF – Base Case

    12 QUIULACOCHA TSF – BASE CASE Potential Economics Based on Internal Projections Quiulacocha TSF – 75 M Tonnes BASE CASE IN-SITU VALUE/TONNE 100% $169 Avg. Metal Recovery of 40% (x) 40% $68 Treatment/Refining Charges (Avg. 28%) (x) 72% $49 NSR/Tonne (=) $49 NSR/Tonne (+) $49 Metal Grade Price Value/

  13. Slide 13: Quiulacocha TSF – Upside Case

    13 QUIULACOCHA TSF – UPSIDE CASE Potential Economics Based on Internal Projections Quiulacocha TSF – 75 M Tonnes UPSIDE CASE IN-SITU VALUE/TONNE 100% $198 Avg. Metal Recovery of 70% (x) 70% $138 Treatment/Refining Charges (Avg. 28%) (x) 72% $100 NSR/Tonne (=) $100 Metal Grade Price Value/Tonne Ag 1.

  14. Slide 14: 2025 Catalysts

    14 2025 CATALYSTS 1. Phase 1 drillholes completed 2. Mineralogical studies 3. Metallurgical studies 4. Formalization of claim on surrounding tailings 5. Expanded Phase 2 drilling program on the CuAg-Au tailings 6. Completion of various site scoping studies: Geotechnical stability Hydrogeology & hydr

  15. Slide 15: Moving Quiulacocha Tailings by Pump Pontoon

    15 MOVING QUIULACOCHA TAILINGS BY PUMP PONTOON 15 / / / / / TSXV : CDPR | OTC : GPPRF | FRA : N8HP 15

  16. Slide 16: Cerro de Pasco Post Closure

    16 CERRO DE PASCO POST CLOSURE Artistic Rendering TSXV: CDPR OTC: GPPRF FRA: N8HP 16

  17. Slide 17: Corporate Overview

    17 CORPORATE OVERVIEW LEGEND SHARE STRUCTURE Shares Outstanding 512.9 M Options Outstanding 20.3 M Warrants Outstanding 145.3 M FD Shares Outstanding 678.5 M Market Capitalization* $166.7M * May 21, 2025 share price $0.325 SHARE OWNERSHIP Management & Directors 14.11% Eric Sprott 16.57% / / / / / TS

  18. Slide 18: Management Team & Board of Directors

    18 MANAGEMENT TEAM & BOARD OF DIRECTORS STEVEN ZADKA GUY GOULET MANUEL RODRIGUEZ JAMES CARDWELL EXECUTIVE CHAIRMAN EXECUTIVE DIRECTOR & CEO EXECUTIVE DIRECTOR & PRESIDENT CHIEF FINANCIAL OFFICER Founding partner of CDPR with over Over 30 years of investment More than 30 years of management CPA-crede

  19. Slide 19: www.pascoresources.com

    WA Pasco RESOURCES WWW.PASCORESOURCES.COM

Cerro de Pasco Resources — Investor Presentation (May 2025) on 6ix