Enka Insaat Ve Sanayi A.s. · BIST:ENKAI

Enka Insaat Ve Sanayi A.s — Q3 2023 Earnings Presentation

43 slides from Enka Insaat Ve Sanayi A.s's earnings presentation, November 2023

  1. Slide 1: 3Q 2023 Presentation

    3Q 2023 PRESENTATION 1 / 42

  2. Slide 2: Introduction

    INTRODUCTION Experience Synergy 66 Years of construction experience Group of companies composed of more worldwide than 50 subsidiaries operating in 7 major geographical areas: Reliability CIS, Asia, Middle East, Europe, America, Africa & Turkiye 570 projects in 52 countries have been completed or un

  3. Slide 3: Milestones 1957-1976

    M I L E S T O N E S [1957-1976] design, engineering and Contract Benghazi Cement construction activities of industrial Factory and then 4 more cement plants, buildings and infrastructure factory projects in Libya Founded The First Power Partnership Plant Focused First on International as a limited l

  4. Slide 4: Milestones 1977-1996

    M I L E S T O N E S [1977-1996] Combined Cycle Power Plant in Establishment of development Turkiye: 600 MW Trakya CCCP companies in Moscow, Russia Foundation Outstanding Oil Fields First Natural Real Estate Gas achievements with fast-track projects in ENKA Sports, education and culture Libya, Russia

  5. Slide 5: Milestones 1997-2006

    M I L E S T O N E S [1997-2006] Power Generation 790 MW Rijnmond Natural Gas Fired as Independent Power Producer (IPP) CCPP has been completed in 22 months by the ENKA Bechtel Joint Venture in the Netherlands Retail Certified World Business Record Power Gas Fired Generation CCPP ENKA set a new world

  6. Slide 6: Milestones 2007-2016

    M I L E S T O N E S [2007-2016] ENKA as a main contractor has been A contract related to South Caucasus awarded 400 MW Yajva State District Pipeline Expansion (SCPX) has been Power Plant EPC Project in Russia awarded to Bechtel-ENKA JV Iraq Power Plants Oil & Gas Re-Entry EPC in Caucasus Russia Pipe

  7. Slide 7: Milestones 2017-2023

    M I L E S T O N E S [2017-2023] ENKA with its partner General Electric, Cimtas Ningbo is Aerospace Standard 9100D designed and built the Samawa and certified. Dhi Qar CCPPs, which added 750 MW Cimtas Ningbo is amongst the first piping and each to Iraq skid fabricators certified to the AS9100D standa

  8. Slide 8: Milestones 2017-2023

    M I L E S T O N E S [2017-2023] ENKA UK Construction Ltd. is contracted The first cruise port construction project to prefabricate, install and erect all received at the Bahamas. piping systems of the power island at Hinkley Point C Nuclear Power Station. Germany Excellence Balkans England Bahamas E

  9. Slide 9: Commitments: Mission, Vision, Values

    COMMITMENTS Mission Vision Values Our Mission Our Vision Our Values to be one of the best define how we do work at ENKA. to design, build and deliver safe, and innovative We will not undertake or execute high-quality, and cost-effective engineering & a project which comprises any of construction pro

  10. Slide 10: Sustainability

    SUSTAINABILITY ENKA, which operates in different sectors such as engineering and construction, energy, real estate and trade in many different geographies, has made a commitment to serve sustainable development in all its operations. The approach which ENKA has adopted to corporate sustainability is

  11. Slide 11: Sustainability: Our Business and Principles

    SUSTAINABILITY Our Business and Principles ENKA, • Maintains an Ethics & Compliance Program to ensure open, honest and transparent communication with all stakeholders in accordance with applicable national & international laws and regulations, as well as company values and industry standards. • Adop

  12. Slide 12: Sustainability: Our People and Community

    SUSTAINABILITY Our People and Community ENKA, • Respects human rights and assesses the human rights impacts of its investments and operations as part of its social impact assessment process. • Includes its stakeholders in the decision-making mechanisms of the company and provides transparent, effect

  13. Slide 13: Sustainability: Our Planet

    SUSTAINABILITY Our Planet ENKA, • Assesses, measures and reports its environmental impacts and develops plans and procedures to reduce them. • Commits to reach net zero emissions in its operations by 2050 and takes actions to reduce direct and indirect emissions from its projects, operations and sup

  14. Slide 14: Shareholding

    SHAREHOLDING SHAREHOLDER SHARES TARA HOLDING A.Ş. 49,80% VİLDAN GÜLÇELİK 7,99% SEVDA GÜLÇELİK 6,43% 31,39% ENKA FOUNDATION 5,87% 10,12% ALİ GÜLÇELİK 4,50% 5,87% MİKADO REAL ESTATE INVESTMENT 4,37% 2,29% BİLGİ GÜLÇELİK 4,31% NURDAN GÜLÇELİK 1,56% 50,33% SELİM GÜLÇELİK 1,55% AYŞE VERDA GÜLÇELİK 0,68%

  15. Slide 15: Financial Highlights

    FINANCIAL HIGHLIGHTS 3Q 2023 2022 2021 2020 2019 TOTAL ASSETS 8.315 8.581 9.102 8.454 8.318 TOTAL EQUITY 6.418 6.471 6.675 6.694 6.568 CASH & MARKETABLE SECURITIES 4.846 4.597 5.265 4.406 3.960 REVENUE 2.509 3.731 2.859 1.659 1.893 EBITDA 489 820 686 386 436 EBITDA MARGIN 19,5% 22,0% 24,0% 23,3% 23,

  16. Slide 16: Revenues by Business Lines

    REVENUES BY BUSINESS LINES 3Q 2023 2022 2021 2020 2019 USD % USD % USD % USD % USD % CONSTRUCTION 1.490 59,4 1.933 51,8 1.569 54,9 1.263 76,1 1.147 60,6 POWER GENERATION 663 26,4 1.298 34,8 797 27,9 0 0,0 324 17,1 REAL ESTATE 238 9,5 344 9,2 304 10,6 289 17,4 346 18,3 TRADE 197 7,9 247 6,6 252 8,8 1

  17. Slide 17: EBITDA by Business Lines

    EBITDA BY BUSINESS LINES 3Q 2023 2022 2021 2020 USD % MRG USD % MRG USD % MRG USD % MRG CONSTRUCTION 247 51 17 483 59 25 385 56 25 201 52 16 POWER GENERATION 21 4 3 92 11 7 67 10 8 (17) (4) - REAL ESTATE 165 34 69 194 24 56 194 28 64 187 48 65 TRADE 56 11 28 51 6 21 40 6 16 16 4 10 ELIMINATION 0 0 0

  18. Slide 18: Share Capital Increases

    SHARE CAPITAL INCREASES DATE PREVIOUS SHARE INCREASE INCREASE (%) INCREASED SHARE CAPITAL CAPITAL 25.02.2012 2.500 300 12,00 2.800 12.06.2013 2.800 400 14,29 3.200 21.05.2014 3.200 400 12,50 3.600 06.05.2015 3.600 400 11,11 4.000 23.05.2016 4.000 200 5,00 4.200 27.04.2017 4.200 400 9,52 4.600 24.05.

  19. Slide 19: Dividend Payments

    DIVIDENT PAYMENTS CASH DIVINDEND D.P.F.S.* YEAR DATE GROSS RATE NET RATE TL USD TL USD 2022 12.04.2023 36,33% 33,24% 2.180 116,2 35,6 1,90 2022 TOTAL 2.180 116,2 35,6 1,90 05.01.2022 20,00% 18,00% 1.120 84,9 0 0 2021 13.04.2022 50,00% 45,00% 2.800 190,9 61,0 4,16 2021 TOTAL 3.920 275,9 61,0 4,16 202

  20. Slide 20: Share Buyback

    SHARE BUYBACK DECISION TAKEN ACTION SHARE AMOUNT NUMBER OF TOTAL PERCENTAGE BOUGHT SHARES JULY 2016 Share Buyback 8,4 Million 4,2 Billion 0,20% JULY 2017 Share Buyback 4,6 Million 4,6 Billion 0,10% AUGUST 2017 Share Buyback 4,6 Million 4,6 Billion 0,10% JANUARY 2018 Share Buyback 4,6 Million 4,6 Bil

  21. Slide 21: Achievements & Awards

    ACHIEVEMENTS & AWARDS YAJVA ADMIRED COMPANY ENKA’s 411 MW CCPP Yajva State District Power Plant "Most Admired Construction Company EPC Project has been awarded “the Best Project in the of Turkiye awards" for the years 2005 - 2012 by Power/Industrial Category” in 2013 Global Best Projects CAPITAL, a

  22. Slide 22: Achievements & Awards

    ACHIEVEMENTS & AWARDS RISK MANAGEMENT GLOBAL Turkish Power Company ENKA POWER has world class risk ENKA’s EPC Project, Sulaymaniyah 1.500 MW management article which praises ENKA's commitments Combined Cycle Power Plant Project was and achievements in protecting the power plant assets selected as th

  23. Slide 23: Engineering & Construction

    ENGINEERING & CONSTRUCTION The fields of Engineering & ENKA’s global solutions span Construction activities are; the entire project life cycle: Oil & Gas Facilities, Pipelines Engineering, Petrochemical Plants Fabrication, Power Plants Procurement, Industrial Plants Construction, Airports, Harbors,

  24. Slide 24: Backlog

    BACKLOG COUNTRY BACKLOG % Special Projects 1.092 25,5% North Macedonia 711 16,6% Serbia 700 16,3% United Kingdom 573 13,4% Russia 361 8,4% Germany 209 4,9% * The group «Others» consists of the following countries: USA 144 3,4% Bahamas, Belgium, Brazil, China, France, Greece, Hungary, Italy, Kazakhst

  25. Slide 25: Projects Under Construction: Tengiz, Kazakhstan

    PROJECTS UNDER CONSTRUCTION FGP 3GP Mechanical, Electrical & Instrumentation Installation Works Tengiz, Kazakhstan Job owner : Tengizchevroil Contractor : Senimdi Kurylys (Bechtel – ENKA Joint Venture with equal shares) Senimdi Kurylys LLP has been awarded a contract for mechanical, electrical and i

  26. Slide 26: Projects Under Construction: Morava Corridor Motorway

    PROJECTS UNDER CONSTRUCTION Morava Corridor Motorway Project Pojate – Preljina, Serbia Job owner : Government of the Republic of Serbia Ministry of Construction, Transport and Infrastructure ENKA and its joint venture partner Bechtel have been selected by the Government of the Republic of Serbia to

  27. Slide 27: Projects Under Construction: North Macedonia Motorway

    PROJECTS UNDER CONSTRUCTION Corridor 8 & 10d Motorway Project, North Macedonia Job owner : Public Enterprise for State Roads and the Ministry of Transport and Communications on behalf of the Government of the Republic of North Macedonia ENKA, with its joint-venture partner Bechtel, will build 109 km

  28. Slide 28: Projects Under Construction: Shotton Paper Mill

    PROJECTS UNDER CONSTRUCTION Shotton Paper Mill, United Kingdom Job owner : Shotton Mill Limited (Modern Karton/EREN Holding) ENKA signed a contract for the construction of a Paper Mill Factory on the Dee Estuary in Flintshire, North Wales for Shotton Mill Limited owned by Modern Karton/EREN Holding,

  29. Slide 29: Projects Under Construction: Nassau, Bahamas

    PROJECTS UNDER CONSTRUCTION Marine & Land Works in Prince George Wharf, Nassau, the Bahamas Job owner : Nassau Cruise Port Limited (NCPL) Contractor : ENKA Construction and Development B.V. NCPL proposes to reinvigorate the current tourism infrastructure in Nassau by boosting the cruise ship arrival

  30. Slide 30: Projects Under Construction: Hinkley Point C

    PROJECTS UNDER CONSTRUCTION Hinkley Point C Nuclear Power Plant – Prefabrication, installation & erection of piping systems of power island - England Job owner : GE Steam Power Ltd. ENKA UK Construction Ltd., a subsidiary of ENKA İnşaat ve Sanayi A.Ş., is contracted by one of the main contractors on

  31. Slide 31: Projects Under Construction: Dradenau CHP, Germany

    PROJECTS UNDER CONSTRUCTION Dradenau Combined Heat and Power Plant - Germany Job owner : Wärme Hamburg GmbH On 15 September 2021, ENKA with its JV partner Uniper signed a contract with Waerme Hamburg GmbH for the turnkey construction of approximately 180 MW electric and district heating capacity of

  32. Slide 32: Engineering Fabrication

    ENGINEERING FABRICATION ÇİMTAŞ, a subsidiary of ENKA, is a leading provider of integrated engineering, procurement, welded fabrication, assembly and installation solutions for top-tier global customers. ÇİMTAŞ was incorporated in 1973 in Turkey as a local steel fabricator and now an EPMFI group of 5

  33. Slide 33: Engineering Fabrication

    ENGINEERING FABRICATION 33 / 42

  34. Slide 34: Engineering Foundation

    ENGINEERING FOUNDATION KASKTAŞ, wholly owned subsidiary of ENKA, was established in 1957 as the piling group of ENKA. Having a vast and modern machinery and equipment fleet, KASKTAŞ has the ability to fulfill diverse requirements in the field of geotechnical engineering both in Turkiye and abroad. D

  35. Slide 35: Real Estate

    REAL ESTATE TYPE SIZE (NLA) OCCUPANCY RATE Class A Office Area 389.000 m2 92% 515 Retail Area 368.000 m2 94% 260 5 Star Hotel 235 Rooms * * All assets are located in Moscow, except 1 shopping center which is located in St.Petersburg. * Occupancy and rate of rooms of the hotel may vary daily. 35 / 42

  36. Slide 36: Real Estate

    REAL ESTATE OFFICE ( 389.000 m2 ) 1 12 Naberezhnaya Tower 13 Paveletskaya 14 Moskva Krasnye Holmy 3 15 MosENKA 16 Ochenovski Naberejnaya 12 15 RETAIL ( 368.000 m2 ) 2 16 9 1 Leningradsky 4 13-14 6 2 Kuntsevo Plaza 5 3 Maryina Roshcha 7 4 Kashirskaya 5 Sevastopolsky 6 Vernadskogo 7 Belyaevo 8 Podolsk

  37. Slide 37: Real Estate

    REAL ESTATE YEAR RENTAL REVENUE EBITDA EBITDA MARGIN 3Q 2023 238 165 69,3% 2022 344 194 56,4% 2021 304 194 63,8% 2020 289 187 64,7% 2019 346 213 61,6% 2018 329 204 62,0% 2017 319 193 60,5% 2016 319 223 69,9% All figures given above are in Million US Dollars 37 / 42

  38. Slide 38: Real Estate

    EL DSo@LL Lilly os on Alibaba.com ARCONIC pis! BVLGARI = Lye ( = ee os 4 ce <x» i 4 1 n a e rs Building a better {F} la prairie EY working world Sa wheely IATA 52) % UBS °G OZ0N QUALCOMM CMS @ic & ers law-tax-future & MITSUIS CO.,LTD. 38 / 42

  39. Slide 39: Power Generation

    POWER GENERATION 3 Gas-Fired Combined Cycle Power Plants Gebze, Adapazarı and Izmir with a total capacity of almost 4,1 Gigawatts Annual generation capacity is 32 Billion Kwh net and the annual natural gas consumption could reach 6.5 Billion CBM, Capability of meeting 10% of Turkey’s total demand, s

  40. Slide 40: Power Generation: New Investment Projects

    POWER GENERATION New Investment Projects ENKA Kırklareli Combined Cycle Power Plant The new investment project is fully owned by ENKA. It will be financed by its own sources. The power plant will be located in Kırklareli Babaeski. Approximately 200 kilometers away from Istanbul. It will have a total

  41. Slide 41: Power Generation: Turkey Consumption by Source

    POWER GENERATION 2021 2022 YEAR Million Kwh % Million Kwh % Coal 104,115 33.1 113,611 36.5 Hydro 55,473 17.6 66,606 21.4 Natural Gas 107,340 34.1 71,864 23.1 Wind 30,901 9.8 34,561 11.1 Geothermal 10,105 3.2 10,223 3.3 Others 8,607 2.7 11,721 3.8 International (Net) (1,858) (0.6) 2,704 0.9 Total Con

  42. Slide 42: Power Generation: Electricity Consumption

    POWER GENERATION BILLON KWH CHANGE 320 12% 10% 280 8% 240 6% 200 4% 2% 160 0% 120 -2% 141 150 161 175 190 198 194 210 230 242 246 255 264 275 290 292 290 291 315 311 80 -4% 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 42 / 42

  43. Slide 43: Contact

    İNŞAAT VE SANAYİ A.Ş. Balmumcu Mah., Zincirlikuyu Yolu No: 10, 34349 Beşiktaş / İstanbul Tel: +90 (212) 376 10 00 (pbx) Fax: +90 (212) 272 88 69 e-mail: enka@enka.com web: https://www.enka.com ENGINEERING FOR A BETTER FUTURE 43 / 42

ENKA İnşaat ve Sanayi A.Ş. — Q3 2023 Earnings Presentation on 6ix