Prosafe — Q4 2018 Earnings Presentation
23 slides from Prosafe's earnings presentation, Feb 5, 2019

Slide 1: Q4 2018 results and market update
5 February 2019 Q4 2018 results and market update

Slide 2: Disclaimer
Disclaimer All statements in this presentation other than statements of historical fact are forward-looking statements, which are subject to a number of risks, uncertainties, and assumptions that are difficult to predict and are based upon assumptions as to future events that may not prove accurate.

Slide 3: Agenda
Agenda Highlights Financial results Business & Operations Outlook Summary 3

Slide 4: Recent highlights – Q4 2018
Recent highlights – Q4 2018 Strong utilisation • Utilisation of 100% owned vessels in Q4 of 63% (36.1%) – the highest utilisation since Q3 2015. Utilisation for the full year 2018 was 47.3% (38.4%) Financial results • EBITDA before non-recurring items of USD 31.7 million (USD 29 million reported

Slide 5: Agenda
Agenda Highlights Financial results Business & Operations Outlook Summary 5

Slide 6: Income statement
Income statement Highest quarterly fleet utilisation since Q3 2015 at (Unaudited figures in USD million) Q4 18 Q4 17 63% (Q4 2017: 36.1%). Operating revenues 74 77 Lower operating revenues despite higher utilisation Operating expenses (45) (35) due to lower average dayrates – approx. USD 125k Op

Slide 7: Balance sheet
Balance sheet (Unaudited figures in USD million) 31.12.18 30.09.18 31.12.17 Vessels 1,423 1,451 1,527 Total assets of ca. USD 1.7 billion New builds 126 126 125 Other non-current assets 10 16 11 Reduced cash balance due to repayment of USD Total non-current assets 1,559 1,593 1,663 137 million i

Slide 8: Agenda
Agenda Highlights Financial results Business & Operations Outlook Summary 8

Slide 9: Prosafe - Transformed and repositioned
Prosafe - Transformed and repositioned o Add three versatile units with global reach 1 Modernized the fleet o 50% of the fleet will be less than 4 years old o Safe Astoria scrapped – 6th vessel scrapped since 2016 o Limited debt service and interest expenses in the years to come 2 Financing flexibil

Slide 10: Fleet status: Contracts, wins and extensions
Fleet status: Contracts, wins and extensions Contract backlog Contracting update Fixtures Q4 2018 Safe Caledonia 80 days firm award with a 30-day option with a major oil and gas operator, UKCS. Ability to substitute the vessel with another from within the fleet; Summer 2020 Regalia 60 days firm

Slide 11: Agenda
Agenda Highlights Financial results Business & Operations Outlook Summary 11

Slide 12: UKCS surge in MMO
UKCS surge in MMO High demand in recent years driven by major hook up and commissioning activity, although transition to MMO going forward Turnaround and life-time extensions expected to drive significand demand in the next 5 years 2020 Forties pipeline maintenance shutdown is triggering activ

Slide 13: Norwegian Shelf – positive activity indications
Norwegian Shelf – positive activity indications Anticipated demand driven primarily by maintenance requirements linked to lifetime extension Entrance of new operators – like in the UK – could be a positive factor supporting this type of activity Optimism warranted for the longer term 13

Slide 14: Key Brazil developments
Key Brazil developments IOC offshore spending increase Prosafe came first in Brazil auction. Will mobilize Safe Eurus if contract awarded Even upon conclusion of the tenders, contracted supply considered insufficient to meet Petrobras’ near/ medium term demand Petrobras offshore MMO spending f

Slide 15: Indicative re Prosafe’s newbuild COSCO units
Indicative re Prosafe’s newbuild COSCO units * - Very competitive cash break-even Comment Cash break even – cost per day Illustration shows minimum cash cost 100 000 elements with COSCO financing 90 000 package (assuming indicative USD 40k/day OPEX) 80 000 Significantly lower cash break even 70

Slide 16: Mexico – Indicators pointing to activity growth from 2020
Mexico – Indicators pointing to activity growth from 2020 Average age of offshore facilities in Mexico is over 25 years Offshore facilities by installation year Over 50% of infrastructure weight was installed prior to 1991 (topside weight) New President ‘AMLO’ focus on increasing production by

Slide 17: Tender activity significantly increased in 2018
Tender activity significantly increased in 2018 Number of contracts Contract months Comments Awards in 2018 offer activity rebound in to 2019: • In 2018 Prosafe saw more than a doubling in the number of new contract awards • 50% of the new contracts are for MMO work • 92% of options historically e

Slide 18: Order backlog
Order backlog Prosafe’s firm backlog was USD 209 Order Backlog (USD million) million per end Q4 2018 Awarded 41% and 76%, respectively, 1400 of global and North Sea contracts’ bid 1200 593 for last 6 years 1000 564 518 800 481 483 600 38 400 816 36 703 36 590 36 486 67 78 200 449 443 67 375 304

Slide 19: Prospects & tendering – 3 year lookout
Prospects & tendering – 3 year lookout Global opportunities Tendering activity – 3 year profile 13 tenders ongoing for 2019 through 2021 12 tenders with commencement dates in 2019 21 North Sea prospects with high probability of going to tender next 3 years 11 prospects with high probability

Slide 20: Agenda
Agenda Highlights Financial results Business & Operations Outlook Summary 20

Slide 21: Summary
Summary Highest quarterly utilisation since Q3 2015 High activity • Maintenance & Modification activity returning • Prosafe came first in Brazil auction. Will mobilize Safe Eurus if contract awarded • Safe Concordia commenced contract in Brazil • Contract wins for Regalia in 2019 and for Safe Ca

Slide 22: Appendix
Appendix @ Prosafe

Slide 23: Operating revenue
Operating revenue (USD million) Q4 18 Q3 18 Q4 17 12M 18 12M 17 2017 Charter income 59.3 54.5 70.6 260.6 256.1 256.1 Other income (incl amortization of fees) 14.8 19.1 6.1 70.2 26.9 26.9 Total 74.1 73.6 76.7 330.8 283.0 283.0 * Q4 18 other income includes IFRS 15 revenue adjustment of USD 1.8 millio
Source: Internet Archive copy of prosafe.com
More decks from Prosafe SE
Pareto Securities Energy Conference 202616 slides · September 2026
Q2 2026 Earnings Presentation35 slides · Aug 28, 2026
Q1 2026 Earnings Presentation37 slides · Jun 1, 2026
Q4 2025 Earnings Presentation35 slides · Feb 26, 2026
Investor Presentation (January 2026)38 slides · January 2026
Q3 2025 Earnings Presentation44 slides · Nov 13, 2025