Trx Gold Corporation · AMEX:TRX

Trx Gold — Tanzanian Gold — Investor Presentation (September 2021)

19 slides from Trx Gold's investor presentation, September 2021

  1. Slide 1: Corporate Presentation – Emerging Gold Producer

    Corporate Presentation Emerging Gold Producer September 2021

  2. Slide 2: Cautionary Note

    Cautionary Note Tanzanian Gold Corporation (“Tanzanian Gold” or the “Company”), has taken all reasonable care in producing and publishing information contained in this presentation. Tanzanian Gold does not warrant or make any representations regarding the use, validity, accuracy, completeness or rel

  3. Slide 3: Buckreef Project: Advancing Tanzania's Next Large Gold Mine

    Tanzanian Gold Corporation Buckreef Project: Advancing Tanzania's Next Large Gold Mine Lake Victoria Greenstone Belt Advancing on Three Straightforward Parallel Tracks • Buckreef - High grade M&I Resource of 35.88 Mt @ 1.77 g/t for 2.04 M ounces 1. Expanding Oxide Mine Production • Expansion to 15 t

  4. Slide 4: Refreshed & Experienced Leadership Team

    Refreshed & Experienced Leadership Team Credible New Team Delivering Results Stephen Mullowney – CEO Khalaf Rashid – SVP, Tanzania & MD • Former Partner & Managing Director at PwC, • Distinguished career in Tanzanian business, politics and leading Deals Mining Group Government • Vast experience in a

  5. Slide 5: Expanding Oxide Mine Production (~10% of Resources)

    Expanding Oxide Mine Production (~10% of Resources) Test Plant to 15 tph to 40+ tph Buckreef 15 tph Expansion Predominantly Complete Budgeted Capital Cost of $1.3-$1.6 Million1 and Low Total Cash Costs2 Open Pit Crush Grind CIL Tailings Buckreef Open Pit Crushed Ore at Site 15 tph Ball Mill CIL Tank

  6. Slide 6: Resource Expansion Through Exploration

    Resource Expansion Through Exploration Multiple Exploration Targets on 16 km2 Property Buckreef Main Zone - Open Buckreef West - Advanced • Open to the Northeast, South • Off-shoot of Buckreef Main Zone and at depth • Near surface mineralization • Conversion of Resources to • Oxide and sulfide mater

  7. Slide 7: Sulphide Project Development (~90% of Resources)

    Sulphide Project Development (~90% of Resources) Significant Opportunity to Expand Scope and Size Relative to the 2018 PFS Robust 2018 PFS Base Sulphide Project Development 2018 PFS Summary (US$1,300 oz. Au) Convert Validate Evaluate Increase Description Amount Resources to Metallurgical Phased Annu

  8. Slide 8: Undervalued vs. Peers

    Undervalued Undervalued vs. vs. Peers Peers Trading at Discount to Peer Group on both P/NAV and EV/M&I multiples P/NAV Average EV/M&I - Re-Rate Potential A Tanzanian Comparable Peer Average: 0.51x 0.79x 0.79x 0.65x $356 0.57x 0.59x 0.52x 0.42x 0.27x 0.29x 0.22x ~2x Higher Bluestone Tanzanian Rio2 Sa

  9. Slide 9: Buckreef Stands Out vs. Peers

    Buckreef Stands Out vs. Peers Positioned in the Higher Grade Lower Cost Quadrant vs. Peers Notes: Assets selected are gold operations mining via Open pit and recovery via CIL/CIP and/or Flotation. 1.Asset bubble size is indicative of M&I Resources (inclusive of Reserves). 2.Buckreef ‘s reported M&I

  10. Slide 10: Key Takeaways

    Key Takeaways Why Invest In Us – Accelerated Flexible Development Substantial New & Expanding Potential for Sulphide Attractive Permitted Rejuvenated Oxide Resource Project Valuation vs. Resource Management Production Expansion Development Peers M&I Resource Multi-discipline Low cost, high Numerous

  11. Slide 11: Rapid Progression

    Tanzanian Gold Corporation Rapid Progression 11

  12. Slide 12: Safety is Our Top Priority

    Safety is Our Top Priority Zero Lost Time Injuries, Zero Medical Aid Incidents, and Zero COVID-19 Cases in 2021 • Daily COVID-19 briefing • Formation of a Health/COVID-19 team under Senior Health Officer • Mandatory daily screening of all personnel and contractors • Enhanced sanitization and hand wa

  13. Slide 13: ESG: Key Focus

    ESG: Key Focus Establishing Robust Environmental Standards and Strengthening Community Relations Environment • Low carbon footprint by maximizing grid power and minimizing diesel usage • All sites and suppliers to be certified by International Cyanide Management Code • Dry stack tailing will minimiz

  14. Slide 14: Resembles Other African Operations

    Resembles Other African Operations Buckreef Similar to Wahgnion, Buzwagi and Geita Deposit Type Mining/Recovery Methods M&I Resource M&I Grade Stripping Ratio Annual Production (Gold) (Gold) (Gold) Shear zone hosted deposit in Mining: Open pit 2.04 M oz 1.77 g/t TBD2 TBD3 Buckreef mafic basalts/dole

  15. Slide 15: Capital Structure

    Capital Structure Well Positioned to Move Forward Financial Snapshot1 Share Ownership Tickers NYSE:TRX, TSX:TNX Share Price (August 31, 2021) US$0.41 (C$0.52) 52-Week Range US$0.36-US$1.91 (C$0.46-C$2.41) 15% Basic Shares Outstanding 254.9 M Retail Options 7.4 M 15% Warrants 23.7 M Institutions Mark

  16. Slide 16: Superior Liquidity vs. Peer Group

    Superior Liquidity vs. Peer Group TanGold Exhibits Significant Trading Volume Trading Volume (millions) 3.52 2.44 YTD substantially higher trading volume (~6x) than that of its next closest peer 0.78 0.64 0.61 0.59 0.53 0.39 0.35 0.30 0.26 0.22 0.15 0.14 0.15 0.13 0.15 0.15 0.11 0.12 Tanzanian Gold

  17. Slide 17: Buckreef Shear Zone Resources

    Buckreef Shear Zone Resources M&I Mineral Resources for the Buckreef Shear Zone More Than Doubled in 2020 NI 43-101 Resource Estimate for the Buckreef Shear Zone (June 2020 - 0.4 g/t Au cut-off)1 2.50 1.77 g/t Resources (mm oz) 2.00 M&I Gold 1.50 1.53 g/t 1.54 g/t 1.00 1.97 g/t 0.50 0.00 2011 2014 2

  18. Slide 18: Investor Relations

    Investor Relations Investor Relations Manager: Michael Martin Email: m.martin@tangoldcorp.com | Phone: 1-860-248-0999 | Website: www.tangoldcorp.com 18

  19. Slide 19: Endnotes

    Endnotes 1. The 15 tph Oxide Plant estimates have not been prepared in accordance with the results of the Company’s 2018 Prefeasibility Study, reflected in the Company’s May 15, 2020 Updated Mineral Resource Estimate. The 18-Month mining plan estimates are based upon an internal mine model reviewed

Tanzanian Gold — Investor Presentation (September 2021) on 6ix