  1. Slide 1: Corporate Presentation Q2 2020

    Corporate Presentation Q2 2020 TSXV: OM

  2. Slide 2: Forward-Looking Statements & Cautionary Notes Regarding Technical Information

    Forward-Looking Statements & Cautionary Notes Regarding TechnicalInformation This presentation (the "Presentation") contains ""forward-looking information" within the meaning of applicable Canadian securities legislation based on expectations, estimates and projections as at the date of this Present

  3. Slide 3: Key Take-aways

    Key Take-aways • Metal markets (excluding gold) are at 100 year lows. • Decade-long divestment from resource sector is leading to global base metal reserve depletion. • Unsustainable situation that will lead to supply deficits. • Well positioned to develop one of Canada’s largest zinc- lead projects

  4. Slide 4: Metal Mining Valuations At All-Time Lows

    Metal Mining Valuations At All-Time Lows Mining sector remains out of favor and primed to deliver sizeable gains as it returns to the average 4

  5. Slide 5: Construction And Infrastructure Will Drive The Demand For Zinc

    Construction And Infrastructure Will Drive The Demand For Zinc Constructio n And Source: Wood Mackenzie 5

  6. Slide 6: North American Zinc Supply Deficit Is Coming

    North American Zinc Supply Deficit Is Coming 1400 35% Drop in 1200 NA Zinc Production Zn in Concentrate (kT) 1000 800 600 400 200 0 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 Red Dog Pend Oreille Middle Tennessee Greens Creek Empire State (Balmat) East Tennessee Doe Run Bracemac McLeod Caribo

  7. Slide 7: The Pine Point Mining Camp

    The Pine Point Mining Camp OSISKO METALS Pine Point e@ Edmonton ° Vancouver ’ Calgary ° Quebec GenEx ° Montréal ° @ OMProject @ Corporate office Toronto ° OSISKO

  8. Slide 8: Positive PEA Outline Potential For Significant Zinc And Lead Project

    Positive PEA Outline Potential For Significant Zinc And Lead Project • After-Tax NPV of $500M and IRR of 29.6% • Potential To Be Top 10 Zinc Mine On Production Basis • Rapid Payback Of 2.8 Years Large Near Surface Resource Base • Infrastructure In Place: Exploration Upside • Hydroelectric Power Subs

  9. Slide 9: Support Infrastructure Already In Place

    Support Infrastructure Already In Place • Within 42 km of Hay River, • Paved Highway Access. • Known as the “Hub of the North”. • Low-Cost Hydro-Electric Power Available 9 • CN Rail Head From Edmonton & Airport. On Site From Taltson Dam.

  10. Slide 10: PEA Financial Overview

    PEA Financial Overview Internal Rate of Return ("IRR") After Taxes 29.6% After-tax Net Present Value ("NPV") (Discount Rate 8%) $500M After-Tax Payback Period (Years) 2.8 Pre-Production CAPEX (including $71.2M Contingency) $555M Average Annual LOM Production Zinc 327Mlb Average Annual LOM Production

  11. Slide 11: Pine Point On The Cost Curve

    Pine Point On The Cost Curve Over ~25% of the cost curve is unprofitable in this price environment Pine Point LOM PEA C1 Cost: 67¢/lb Source: SNL Pine Point is expected to be within the second cost quartile on a total cash cost basis. Profitable at ALL points in the zinc cycle. Well positioned on th

  12. Slide 12: Annual Production of Metal In Concentrates

    Annual Production of Metal In Concentrates 500 450 Zinc Lead Annual Production (Mlb) 400 350 300 250 200 150 100 50 0 1 2 3 4 5 6 7 8 9 10 Year • Sourced mainly from small, near-surface open pits with additional contributions from 8 high grade, shallow deposits mined by underground methods from the

  13. Slide 13: Potential To Be A Top 10 Zinc Producer

    Potential To Be A Top 10 Zinc Producer Global Current Controlling Production - Zinc Project Location Rank Company(s) (tonnes) 1 Red Dog USA Teck Resources Ltd. 583,200 2 Rampura Agucha India Hindustan Zinc Ltd. 572,441 Glencore Plc, BHP Group, Teck 3 Antamina Peru 409,300 Resources Ltd., Mitsubishi

  14. Slide 14: Among The Cleanest Concentrates In The World

    Among The Cleanest Concentrates In The World 18.00% 6,000 P: Above Penalty Level P: Above Penalty Level Minor Element Penalties (ppm) 16.00% 5,000 Major Element Penalties P 14.00% P Mn SiO2 P Hg 12.00% Fe 4,000 P 10.00% P Cd Pb 3,000 As 8.00% P Cu 6.00% 2,000 P P 4.00% P 1,000 2.00% P P P P 0.00% 0

  15. Slide 15: Plant Site Layout

    Plant Site Layout OSISKO METALS SCREENING SCREENING SORTING BUILDING CRUSHING BUILDING HOPPER JAW CRUSHER BUILDING CONCENTRATE Pb & Zn LOADING BUILDING rir GRINDING = ee USE WASTE HOPPER FLOTATION BUILDING fi LOADING BUILDING af mm [as RECEPTION pe BHO MINE DRY MINE OFFICE KITCHEN INFIRMARY DORMITOR

  16. Slide 16: Concentrator Layout

    Concentrator Layout OSISKO

  17. Slide 17: Access To International Concentrate Markets

    Access To International Concentrate Markets • Concentrates can be shipped to ports in Vancouver or Prince Rupert to access Asian markets or across Canada for European markets. • Rail Distances: • Edmonton to Hay River 970km • Edmonton to Prince Rupert 1,300km 17 • Edmonton to Vancouver 1,245km

  18. Slide 18: MRE Expansion In East Mill Zone

    MRE Expansion In East Mill Zone 18

  19. Slide 19: Deposit Boundary Target Areas

    Deposit Boundary Target Areas Over 11 deposits open across Pine Point 19

  20. Slide 20: Deposit Styles at Pine Point (MVT)

    Deposit Styles at Pine Point (MVT) Watt Mountain Shale Sulfur Point (Dolomitized) Pine point poorly investigated Pine Point carbonates Dolspar “B Spongy” unit alteration (base of Pine Point)

  21. Slide 21: High Grade Historical Drilling Not Included In Current Resource

    High Grade Historical Drilling Not Included In Current Resource Lead + Width Metres Lead Zinc Grade * Hole Name Trend Zinc Metres (m) % % % 1362 Main 4.88 2.49 10.75 13.24 64.6 1883 North 5.27 5.03 16.24 21.27 112.1 2952 North 7.62 2.28 4.42 6.7 51.1 3053 Main 17.07 3.73 6.88 10.62 181.3 3280 North

  22. Slide 22: Appendices

    Appendices 22

  23. Slide 23: Executive Team & BOD Have A Proven Track Record

    Executive Team & BOD Have A Proven Track Record Management Board of Directors Robert Wares, P.Geo, Chairman & CEO Independent: Jeff Hussey P.Geo, President & COO John Burzynski, P. Geo, Director Anthony Glavac CPA CA, CFO Luc Lessard, P. Eng, Director* Killian Charles, VP Corporate Development Amy S

  24. Slide 24: Project Boundary Location

    Project Boundary Location 24

  25. Slide 25: PEA CAPEX Overview

    PEA CAPEX Overview Initial Sustaining Total Owner’s Cost 17.0 - 17.0 Underground Mine - 220.7 220.7 Surface Mine 14.9 75.7 90.6 Electrical 15.5 15.5 Infrastructure 52.5 11.2 63.7 Processing 249.3 - 249.3 TMF and Water Management 67.1 85.1 152.2 Indirect Costs 68.2 - 68.2 Contingency 71.2 18.2 89.4 R

  26. Slide 26: PEA Mill Overview

    PEA Mill Overview Crushing and Pre-Concentration Circuit Throughput 11,250tpd Coarse Fraction 70% Fine Fraction 30% XRT Mass Recovery 42% Total Mass Recovery (including crusher fines) 59% Grinding and Flotation Circuit Throughput 6,700tpd XRT LOM Recoveries Zinc 93.4% Lead 99.0% Flotation LOM Recove

  27. Slide 27: Gap In Global Supply To Reappear

    Gap In Global Supply To Reappear 27

  28. Slide 28: Pine Point Collaboration Agreements Show Community Support

    Pine Point Collaboration Agreements Show Community Support • September 30th: Osisko Metals announced two separate Collaboration Agreements with: • Deninu Kue First Nation • Northwest Territory Metis Nation • Both Indigenous communities are located near the Pine Point Project. • Collaboration Agreeme

  29. Slide 29: Contacts

    Contacts 1100, av. des Canadiens-de-Montréal Investors and General Inquiries: Suite 300 info@osiskometals.com Montreal, Qc, H3B 2S2 Tel: 514-940-0670 Fax: 514-861-1333 29