Winshear Metals Corp. · TSXV:WINS

Winshear Metals — Investor Presentation (April 2024)

20 slides from Winshear Metals's investor presentation, April 2024

  1. Slide 1: Gaban Gold Project: First Ever Drill Programme Q3, 2024

    TSX-V:WINS www.winshear.com April 2024 GABAN GOLD PROJECT FIRST EVER DRILL PROGRAMME Q3, 2024

  2. Slide 2: Forward Looking Statement

    FORWARD LOOKING STATEMENT This presentation may contain forward-looking statements which involve known and unknown risks, uncertainties and other factors which may cause the actual results, performance, or achievements to be materially different from any future results, performance or achievements e

  3. Slide 3: Introducing Winshear

    INTRODUCING WINSHEAR PREVIOUSLY HELIO RESOURCE MANAGEMENT AND DIRECTORS Chairman Stephen Leahy CEO and Director Richard Williams President Patricio Varas Director Mark Sander Director Andrew Thomson Director Daniele Spethmann CFO Krysta Chapman TSX-V:WINS 3

  4. Slide 4: Recent Winshear News

    RECENT WINSHEAR NEWS • US $30 million settlement in Tanzanian expropriation case • Company paid C$0.25 / share Return of Capital to shareholders in Q4, 2023 • C$3M in Treasury to fully fund Gaban Round 1 drilling TSX-V:WINS 4

  5. Slide 5: Current Winshear Status

    CURRENT WINSHEAR STATUS CORPORATE INFORMATION (As of April1, 2024) • Fully diluted share count of Listing / Symbol TSX-V: WINS 31,423,632 Issued & Outstanding 31,423,632 • Cash in the bank of about $3 million Warrants 5,000 @CAD0.60 • Fully permitted and funded to drill Fully Diluted 31,423,632 firs

  6. Slide 6: Gold on the East Side of the Andes

    GOLD ON THE EAST SIDE OF THE ANDES • Prolific Madre de Dios alluvial goldfield in the Amazon basin • Fed by drainages eroding the Puno Orogenic Gold Belt cropping out on the east slope of the Andes TSX-V:WINS 5

  7. Slide 7: Introducing the Gaban Project in the Puno Orogenic Gold Belt

    INTRODUCING THE GABAN PROJECT IN THE PUNO OROGENIC GOLD BELT • The Gaban and Inambari Rivers drain the Puno Orogenic Gold Belt into the giant Madre de Dios alluvial goldfields to the north • The Gaban Project is the closest bed rock target upstream from Madre de Dios • One significant past producer–

  8. Slide 8: Regional Infrastructure Is Excellent

    REGIONAL INFRASTRUCTURE IS EXCELLENT “Last Mile” is currently accessible only during dry season and on foot TSX-V:WINS 7

  9. Slide 9: Informal Alluvial Miners Are Working Creeks in the Gaban Area

    INFORMAL ALLUVIAL MINERS ARE WORKING CREEKS IN THE GABAN AREA TSX-V:WINS 8

  10. Slide 10: Evidence of Historic Vein Mining at Gaban

    EVIDENCE OF HISTORIC VEIN MINING AT GABAN Abandoned Adit Ruins of Plant Parts of Stamp Mill TSX-V:WINS 9

  11. Slide 11: Exploration Gold Panning

    EXPLORATION GOLD PANNING Outcropping veins at Gaban are crushed and panned to reveal fine gold (or not!), yielding real-time indication of mineralization In-place Veins Panned Gold Manual Crushing TSX-V:WINS 10

  12. Slide 12: Palamina's Pioneering Work

    PALAMINA’S PIONEERING WORK 1. AEROMAGNETIC SURVEY 3. BEDROCK CHANNEL SAMPLING 2. CONCESSIONS & STREAM SEDIMENT SAMPLING TSX-V:WINS 11

  13. Slide 13: Winshear Sampling 2019-2021 Defines Coritiri Au Anomaly

    WINSHEAR SAMPLING 2019-2021 DEFINES CORITIRI AU ANOMALY • 1120 channel samples in 2019-2021 define main Coritiri Au anomaly and satellites • Sample values up to 32.35 g/t Au, in veins and veinlets • Mineralized veins extend over an area 1,000 m by 2,200 m, currently open, especially to east and sout

  14. Slide 14: Fully Funded to Drill

    FULLY FUNDED TO DRILL • Up to 20 drill diamond drill platforms • Helicopter-supported to minimize surface disturbance • Much easier to permit in a first drill test • Cheaper and quicker than permitting and constructing 10 km of road access • Test the length and width of the best anomaly TSX-V:WINS 1

  15. Slide 15: Winshear Sampling 2019-2021 Defines Drill Target

    WINSHEAR SAMPLING 2019-2021 DEFINES DRILL TARGET WINSHEAR ROCK CHIP SAMPLING AU VALUES DIA PERMITTED DRILL SITES Other targets not well- sampled till after permit submitted Best-defined Au-bearing structure selected for drill target TSX-V:WINS 12

  16. Slide 16: Planned Holes vs Sample Assays

    PLANNED HOLES VS SAMPLE ASSAYS TSX-V:WINS 13

  17. Slide 17: Gaban Logistics

    GABAN LOGISTICS Heliport on Transoceanic Highway Ground +/- air --$1,428,000 total cost • Helicopter mob to first drill site San Gaban • Break down rig- hand carry to next Artisinal Trail to site- reconstruct rig (2 day move) Helicopter Route upgrade for moto • Helicopter demob from last site • Reha

  18. Slide 18: Gaban Drilling Rough Gantt Chart

    Gaban Drilling Rough Gantt Chart 2024 Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan-Dec– offsite prep work Office preparation Travel- Lima-San Gaban and travel; compile reports Health Safety & Insurance Community Relations Rehab paths, zip line Construct heliport Feb- Commence health, safety,

  19. Slide 19: Coming Catalysts

    COMING CATALYSTS 0 10km First drill results at Gaban in Q3, 2024 TSX-V:WINS 14

  20. Slide 20: Thank-You

    THANK-YOU 0 10km If you have questions, please send them to: Patricio Varas pat.varas@winshear.com TSX-V:WINS

Winshear Metals — Investor Presentation (April 2024) on 6ix