Enertopia Corp. · CSE:ENRT

Enertopia — Investor Presentation (June 2023)

19 slides from Enertopia's investor presentation, June 2023

  1. Slide 1: June 2023 West Tonopah (WT) Lithium Presentation

    June 2023 West Tonopah (WT) Lithium Presentation 1

  2. Slide 2: Disclaimer

    Disclaimer This presentation includes forward-looking statements within the meaning of Section 27A of the Securities Act of 1933, as amended, and Section 21E of the Securities Exchange Act of 1934, as amended. Statements which are not historical facts are forward-looking statements. The Company make

  3. Slide 3: Project Location Nevada State Map

    Project Location Nevada State Map Enertopia currently controls 100% of 88 royalty free lode claims covering approximately 1,760 acres in Big Smoky Valley four miles west of Tonopah, Nevada. The project area is adjacent to paved highways and grid power access as well as nearby local sources of water.

  4. Slide 4: Table of June 2022 Drill Assay Results

    Table of June 2022 Drill Assay Results HOLE # From ft To ft PPM Li Avg PPMLi high Assay Claystone Horizons Comments DH22-01 13 120 738 1,120 107 feet open to depth DH22-04 30 190 408 630 160 feet open to depth DH22-05 32.5 120 799 1,140 87.5 feet open to depth DH22-06 47.5 120 843 1,290 72.5 feet op

  5. Slide 5: Table of May 2023 Drill Assay Results (Page 1)

    Table of May 2023 Drill Assay Results (Page 1) 5

  6. Slide 6: Table of May 2023 Drill Assay Results (Page 2)

    Table of May 2023 Drill Assay Results (Page 2) 6

  7. Slide 7: Table of May 2023 Drill Assay Results (Page 3)

    Table of May 2023 Drill Assay Results (Page 3) 7

  8. Slide 8: Drill core photo

    Drill core photo Photo shows the high grade 1,520 ppm Li Claystone intersected in hole DH23-01 from 349-353 feet. Within a larger mineralized interval of 1,029 ppm Li over 110 feet. 8

  9. Slide 9: Drill core photo

    Drill core photo This photo shows one of the high grade Li horizons 1,070 ppm Li at a depth of 235-240 feet from DH23-09. Within a larger zone of 977 ppm Li over 35 feet and 841 ppm Li over 105 feet. 9

  10. Slide 10: Enertopia West Tonopah (WT) Lithium Project

    Enertopia West Tonopah (WT) Lithium Project Photo looking southwest from DH22-07 location which intersected 80 feet of 772 PPM Li. The bottom 20 feet of DH- 07 assayed 905 ppm and is open at depth. 10

  11. Slide 11: Enertopia West Tonopah Lithium Project: Next Steps 2023 Drill Program

    Enertopia West Tonopah Lithium Project NEXT STEPS “2023 Drill Program” The Company was able to complete the 2023 WT drill program in less than two months from the granting of the NOI from the BLM. The program got off to a slow start with two major snowstorms during the first drilling stand. But we wer

  12. Slide 12: EV Wars for Battery Grade Lithium Supply!

    EV Wars for Battery Grade Lithium Supply! If EV growth continues at its current pace, the potential new mine supply will simply not be able to keep pace with demand. From 2023-2028 an estimated $45B will need to be invested in lithium mining projects & battery infrastructure to reach the projected d

  13. Slide 13: Lithium Demand from 2021 to 2040 estimated to grow 40x

    Lithium Demand from 2021 to 2040 estimated to grow 40x 13

  14. Slide 14: Li-ion battery prices per watt expected to fall by over 60% by 2040

    Li-ion battery prices per watt expected to fall by over 60% by 2040 from 2022 levels 14

  15. Slide 15: Management

    MANAGEMENT President, CEO and Director: Robert McAllister Mr. McAllister has served as President of Enertopia since November 2007 and as a Director since April 2008. Mr. McAllister was responsible for Investor Relations and Corporate Communications for publicly traded mining and oil & gas listed com

  16. Slide 16: Board of Directors

    Board of Directors Director: Kevin Brown Mr. Brown brings over 18 years of diversified financial and business management experience in private companies, covering the high-tech, mining, and the health and wellness industries. Director: Robert McAllister Mr. McAllister has served as President of Ener

  17. Slide 17: Advisory Consultants

    ADVISORY CONSULTANTS Dr. John Thomas - Technical Advisor Dr. Thomas is a professional engineer, and holds a B.Sc., an M.Sc., and a Ph.D. in chemical engineering from the University of Manchester in the United Kingdom. He also received a diploma in accounting and finance from the U.K. Association of

  18. Slide 18: President's Message

    President’s Message “We are very happy with our accomplishments thus far in 2023 as we moved the WT lithium project from concept to proving a lithium claystone deposit appears to underlie our entire project area. We look forward to bigger steps as the project advances including the commissioning of

  19. Slide 19: Contact Information

    CONTACT INFORMATION President & CEO Robert McAllister Phone: 250-870-2219 Share Structure May 2023 Email: mcallister@enertopia.com Issued and Outstanding 155,166,088 Head Office Address: 1873 Spall Road # 18 Kelowna, BC Options 8,150,000 V1Y 4R2 Fully Diluted 163,316,088 19

Enertopia — Investor Presentation (June 2023) on 6ix