Sun Summit Minerals Corp. · TSXV:SMN
Sun Summit Minerals — Conference Presentation (January 2024)
20 slides from Sun Summit Minerals's conference presentation, Jan 17, 2024
Slide 1: Focused on Expansion and Discovery of District-Scale Gold and Copper Assets in British Columbia
Focused on Expansion and Discovery of District-Scale Gold and Copper Assets in British Columbia JANUARY 2024| SUNSUMMITMINERALS.COM | TSX-V: SMN | OTCQB: SMREF
Slide 2: Forward Looking Statements
FORWARD LOOKING STATEMENTS Forward-Looking Information Statements contained in this presentation that are not historical facts may be forward-looking statements, which involve risks, uncertainties and other factors that could cause actual results to differ materially from those expressed or implied
Slide 3: Company Highlights
Company Highlights JD PROJECT Metal endowed Toodoggone gold-copper mining district High-grade epithermal Au-Ag mineralization: 35.7 m @ 7.3 g/t Au incl. 1 m @ 215.4 g/t Au (JD95-047) 77 m @ 2.4 g/t Au incl. 12.6 m @ 10.8 g/t Au (JD12-003) 22 m @ 11.7 g/t Au incl. 4.0 m @ 61.2 g/t Au (CZ97-
Slide 4: JD Project Highlights
JD Project Highlights PROLIFIC REGION IN BRITISH COLUMBIA Metal endowed Toodoggone Mining District World class Stikine Terrane, similar to Golden Triangle Renewal of historic mining camp: Kemess South Au-Cu Mine, Kemess East/North UG advanced exploration Emerging district: Lawyers, Ranch (Th
Slide 5: JD Project Emerging Mining District
JD PROJECT Emerging Mining District Ranch (Thesis) 19.56 g/t Au over 34m 17.5 g/t Au over 33.1 m1 TOODOGGONE MINERAL BELT Historically significant region, existing mining camp Adjacent to high-grade epithermal gold systems: Lawyers (Thesis Gold): 3.5 Moz AuEq (3.14 M&I, 0.4 I)1 Ranch (Thesis
Slide 6: JD Project - Multiple Gold and Copper Targets
JD PROJECT - Multiple Gold and Copper Targets Oxide and Fericrete Porphyry Cu-Au OXIDE Finn to Creek FERICRETE Epithermal Au-Ag East McClair FINN Porphyry and Skarn Cu-Au CREEK McCLAIR Moosehorn Porphyry Cu-Mo-Au BELLE MOOSEHORN McClair Belle Porphyry Cu-Au Epithermal Au-Ag Map Source: AR 39106 (Gal
Slide 7: JD Project Epithermal Gold Targets
JD PROJECT Epithermal Gold Targets Finn to Creek Epithermal Au-Ag High-Grade Epithermal Gold-Silver FINN CREEK Drilling confirmed continuous nature of high-grade near-surface Au-Ag mineralization Belle Structurally controlled mineralization Epithermal Au-Ag BELLE Historical drill core only sel
Slide 8: JD Project Surface Mineralization
JD PROJECT Surface Mineralization Rock samples 35.4 g/t Au, 1500 g/t Ag 18.5 g/t Au, 300 g/t Ag 14.8 g/t Au 910 g/t Ag Broad zones of strong Au + Ag soil anomalism 1.5 km FINN Underexplored, CREEK untested targets, significant discovery potential Up to 7.5 g/t Au in soil samples (Creek Zone) 1 k
Slide 9: JD Project Porphyry Targets
JD PROJECT Oxide and Fericrete Porphyry Cu-Au OXIDE Porphyry Targets FERICRETE East McClair Porphyry and Skarn Cu-Au Porphyry Copper-Gold Potential Numerous poorly tested porphyry-related Moosehorn McCLAIR copper targets that warrant significant Porphyry Cu-Mo-Au exploration Strong porphyry-rela
Slide 10: Buck Project District Scale Potential
BUCK PROJECT District Scale Potential Large 52,000 ha / 520 km2 property Equity (Newmont) 34 Mt @ 65 g/t Ag (Mined)3 Near Houston, B.C., 100% controlled Houston 20 min drive Smithers 1 hr drive Emerging mineralized belt Mining friendly jurisdiction, close proximity to former and developing mines: Hu
Slide 11: Buck Main Drilling and Initial MRE
BUCK MAIN Drilling and Initial MRE BUCK MAIN Initial Mineral Resource Estimate (MRE): Expected completion Q1 2024 Over 34,000 m drilled in 98 drill holes Open in all directions and at depth: Results indicate significant mineralization extends laterally beyond limits of previous drilling and de
Slide 12: Buck Main Progression from 2020 to 2023
BUCK MAIN ~400% expansion of mineralized envelope over 4 yrs Progression from 2020 to 2023 Based on Sun Summit’s drill programs 2020 Drilling 2021 Drilling 2022 Drilling 2023 Drilling 15 holes for 6,000 m 66 holes for 23,500 m 84 holes for 30,600 m 98 holes for 34,500 m (total drilling) (total drill
Slide 13: Buck Project Potential for Discovery
BCGS Regional Geology (250k) BUCK PROJECT Dungate Potential for Discovery Buck South North Multiple under-explored targets within recently Cabin Silverthorne expanded 52,000 ha tenure package (CC, Gossan West, Buck West) BUCK MAIN Acquisition of the CR property from Teck, a drill- Au / Ag / Zn C
Slide 14: Buck Project CR and Mount Morice
BUCK PROJECT CR and Mount Morice BUCK MAIN New zone of strong copper mineralization: Rock samples returned anomalous results in a new zone that has seen limited exploration: 1.00% Cu and 3.2 g/t Ag 0.94% Cu and 4.1 g/t Ag Target areas show strong porphyry-related mineralization and alteratio
Slide 15: Share Structure
Share Structure Outstanding Shares 105,601,688 52 week high/low $0.19/$0.03 Warrants 32,280,102 Market Capitalization ~$5 Million CAD Options 5,795,000 Working Capital ~$1.0 Million CAD Fully Diluted 143,676,790 ~6.3M warrants expiring March 25, 2024 ($0.70) ~26M warrants expiring May 10, 2025 ($0.1
Slide 16: Sun Summit Minerals Management & Advisors
Sun Summit Minerals Management & Advisors Proven Track Record Over 100 Years A Modern Approach in shareholder wealth creation collective mining experience to mineral discovery through innovative exploration methods Directors Management & Advisors Brian Lock | Executive Chairman Sharyn Alexander, M.S
Slide 17: Why Invest? Upcoming Catalysts Value Proposition
Sun Summit Minerals Why Invest? Upcoming Catalysts Value Proposition JD PROJECT GOLD-SILVER-COPPER PROJECTS IN BRITISH COLUMBIA Buck Project (Epithermal Au-Ag, Porphyry Cu-Mo) EXTENSIVE HISTORIC DATA REVIEW AND JD Project (Epithermal Au-Ag, Porphyry Cu-Au) COMPILATION UNDERWAY; Q4 2023 / Q1 2024
Slide 18: Sunsummitminerals.com contact
SUNSUMMITMINERALS.COM TSX-V: SMN | OTCQB: SMREF Sharyn Alexander, M.Sc. Corporate Office President Suite 800 – 889 West Pender Street salexander@sunsummitminerals.com Vancouver, BC V6C 3B2 Canada
Slide 19: JD Property Acquisition Terms to Earn 100%
JD Property Acquisition Terms to Earn 100% This acquisition is subject to Exchange approval Upon signing formal agreement and Exchange approval: $175,000 cash | 2,000,000 shares • 2% net smelter return (NSR) royalty on the JD claims, which can First Anniversary Dec 2024: be reduced to 1% NSR wit
Slide 20: Buck Property Acquisition Terms to Earn 100%
Buck Property Acquisition Terms to Earn 100% On track to acquire 100% ownership Upon signing at Exchange approval (October 2019): Currently in 5th year of option agreement $25,000 cash | 250,000 shares First Anniversary October 2020: • Sun Summit has paid $150,000 cash and 2,900,000 $25,000 cash
Sun Summit Minerals — Conference Presentation (January 2024) on 6ix