North Arrow Minerals Inc. · TSXV:NAR
North Arrow Minerals — Investor Presentation (July 2021)
19 slides from North Arrow Minerals's investor presentation, Jul 26, 2021
Slide 1: Canada's Future in Diamonds
TSXV: NAR CANADA’S FUTURE I N D I A M O N D S Corporate Overview – July 26, 2021
Slide 2: Cautionary Statement
CAUTIONARY STATEMENT This presentation contains projections and forward-looking information that involve various risks and FORWARD- uncertainties, including, without limitation, statements regarding the potential extent of mineralization, LOOKING resources, reserves, exploration results and plans an
Slide 3: Corporate Overview – as of June 28, 2021
CORPORATE OVERVIEW – as of June 28, 2021 12 MONTH CHART CORPORATE HIGHLIGHTS MAIN SHAREHOLDERS Management/ Directors/ CAPITALIZATION Advisors 29% TSX Venture NAR Float 43% Issued: 120.9 M Options: 11.4 M Warrants: 49.0 M Zebra Holdings and (25 M @ $0.225, 17.9 M @ $0.10) Investments 9% Fully diluted
Slide 4: Corporate Profile – as of June 17, 2021
CORPORATE PROFILE – as of June 17, 2021 D. Grenville Thomas (Chairman) Founder of Aber Resources, discoverer of the Diavik Diamond Mine; Canadian Mining Hall of Fame inductee. MANAGEMENT HIGHLIGHTS Ken Armstrong P.Geo. (President, CEO, Director and Qualified Person under NI 43-101) Diamond explorati
Slide 5: Corporate Overview – Projects
CORPORATE OVERVIEW – PROJECTS PROJECT Advanced Stage Assessing a known kimberlite or diamond deposit 1. Naujaat (100%) Significant diamond inventory; PIPELINE potential value upside: fancy orange-yellow diamonds New partner earning 40% Next stage of diamond exploration Discovery Stage could lead to
Slide 6: Corporate Overview – Naujaat Diamond Project
CORPORATE OVERVIEW – NAUJAAT DIAMOND PROJECT PROJECT Advanced Stage Assessing a known kimberlite or diamond deposit PIPELINE Naujaat (100%) • Largest Canadian diamond resource 100% owned by a junior company • New partnership with Burgundy Diamond 1 Mines (BDM – ASX) • BDM funding a $5.6M 1500-2000 t
Slide 7: Naujaat Project – Ticks All the Boxes
NAUJAAT PROJECT – TICKS ALL THE BOXES ✓ Jurisdiction Clear permitting path in Nunavut GIA certified 0.13 carat fancy vivid orangey ✓ Near tide water yellow brilliant cut Freight costs 50% of NWT diamond mines diamond from Q1-4 ✓ Large tonnage ~48 Mt down to 205m below surface ✓ Low strip ratio <3:1
Slide 8: Naujaat Project – Ticks All the Boxes
NAUJAAT PROJECT – TICKS ALL THE BOXES Q1-4 Kimberlite ✓ Jurisdiction Clear permitting path in Nunavut ✓ Near tide water Freight costs 50% of NWT diamond mines NAR Laydown Area * CAUTION – Inferred Mineral Resources are not Mineral Reserves and do not have demonstrated economic viability 8
Slide 9: Naujaat Project – Ticks All the Boxes
NAUJAAT PROJECT – TICKS ALL THE BOXES ✓ Jurisdiction Clear permitting path in Nunavut ✓ Near tide water Freight costs 50% of NWT diamond mines ✓ Large tonnage ~48 Mt down to 205m below surface ✓ Low strip ratio <3:1 vs >10:1 for NWT diamond mines ~700m ✓ Significant diamond inventory* ~26M contained
Slide 10: Naujaat Project – Ticks All the Boxes
NAUJAAT PROJECT – TICKS ALL THE BOXES ✓ Jurisdiction Clear permitting path in Nunavut A34 ✓ Near tide water A94 Freight costs 50% of NWT diamond mines ✓ Large tonnage ~48 Mt down to 205m below surface A76 A152 ✓ Low strip ratio A59 <3:1 vs >10:1 for NWT diamond mines ✓ Significant diamond inventory*
Slide 11: Naujaat Project – Deal with Burgundy
NAUJAAT PROJECT – DEAL WITH BURGUNDY • Burgundy funding the current C$5.6 million, Phase 1 bulk sample to earn 40% of project Australian listed • Letter of Intent (LOI) in place for Phase 2 (results dependent), where Burgundy can earn company newly additional 20% in Q1-4 by funding 10,000 tonne bulk
Slide 12: 2000 T Sample >50% Complete
2000 T SAMPLE >50% COMPLETE • Sampling started June 29th, 2021. As of July 21, 2021 • Two excavators, two helicopters and three active pits. • Over 1,000 tonnes delivered to Laydown Area near town. PIT D • On track for delivery of 2000 tonnes to Laydown by mid-August. PIT B 12
Slide 13: Q1-4 Sample: 3 Pits, 2 Phases Sampled Thus Far
Q1-4 SAMPLE: 3 PITS, 2 PHASES SAMPLED THUS FAR PIT B & D Sampling the Unit A28 PIT E Sampling Unit A88, may extend into Unit A61 Approximate surface trace of the Q1-4 kimberlite (~12 ha) Image view: Looking northwest 13
Slide 14: Purpose of the 2000 Tonne Q1-4 Sample
PURPOSE OF THE 2000 TONNE Q1-4 SAMPLE 1. Polished Yellow Diamonds: Q1-4 Grade/Size Curve • Certified by GIA as fancy vivid orangey yellow diamonds Comparative Curves • Desirable to the gem/jewelry trade 2. Nitrogen aggregation studies show the yellow and white diamonds have distinct populations Pote
Slide 15: Pikoo Diamond Project, SK
PIKOO DIAMOND PROJECT, SK Next stage of diamond exploration Discovery Stage could lead to discovery PROJECT 5. Pikoo (100%) Kimberlite Field discovered by North Arrow PIPELINE EKATI DIAVIK GAHCHO KUE Excellent diamond potential 5 RENARD VICTOR EXISTING DIAMOND MINE 15
Slide 16: Pikoo Project, SK
PIKOO PROJECT, SK ▪ Good local infrastructure; within 10 km of SK Hwy 911. PROJECT PIPELINE ▪ 10 discrete kimberlites discovered PK314 & PK346 PK150 ▪ 5 tested and proven diamondiferous PK312 PK311 ▪ PK150 – most significant discovery: 1,232 diamonds > 0.106 mm from 531 kg. (100% NAR) 916
Slide 17: Pikoo Project, SK
PIKOO PROJECT, SK PK346 PK314 (100% NAR) &“North Pikoo PK347 Dykes” • Till sampling suggests additional, PROJECT unique and unsourced KIM trains ? ? PK312 PK150 PIPELINE (plus PK151 ? • More kimberlites discoveries to be made. and another PK311 dyke) ? • Autumn 2021 till sampling program ? ? planned
Slide 18: Diamond Discoveries: A Canadian Leader
DIAMOND DISCOVERIES: A CANADIAN LEADER NAR: • One of Canada’s largest under-evaluated diamond inventories Canadian at Naujaat’s Q1-4 kimberlite (~26 million carats) diamond sector’s • Has discovered two new diamondiferous kimberlite fields – most active Mel & Pikoo & successful explorer • 6 drill-re
Slide 19: TSXV: NAR
TSXV: NAR Ken Armstrong President & CEO Nick Thomas Community and Investor Relations Manager Suite 960-789 West Pender Street Vancouver, BC Canada V6C 1H2 Tel: +1.604.668.8354 info@northarrowminerals.com @narminerals northarrowminerals www.northarrowminerals.com
North Arrow Minerals — Investor Presentation (July 2021) on 6ix