Metals Exploration Plc · LSE:MTL

Metals Exploration — Corporate Update (April 2013)

29 slides from Metals Exploration's corporate update, April 2013

  1. Slide 1: Corporate Update April 2013

    CORPORATE UPDATE April 2013 This presentation should be read in conjunction with information provided on the Company’s website at www.metalsexploration.com

  2. Slide 2: Important Notice

    IMPORTANT NOTICE This presentation has been prepared by the management of Metals Exploration Plc for the benefit of the investing community including, brokers, fund managers, investors and analysts and not for the benefit of any particular person. It should be read in conjunction with information pr

  3. Slide 3: Gold Project – In Development

    GOLD PROJECT – IN DEVELOPMENT  Philippine focussed mining development company  100% owned Runruno Gold Project being developed  Robust funding model, 70% equity 30% debt  Strong major shareholder support - Solomon Capital, Baker Steel, Runruno Holdings, Investec  Runruno is secured by a Financi

  4. Slide 4: Company Information

    COMPANY INFORMATION KEY SHAREHOLDERS - % HOLDING (31 March 2013) SHARE CAPITAL (31 March 2013)  Solomon & related parties 47.28%  Issued ordinary shares 824,743,103  Baker Steel 24.00%  Unlisted options and warrants 19,785,000  Runruno Holdings & related parties 18.26%  Market Capitalisation (

  5. Slide 5: Runruno Gold Project

    RUNRUNO GOLD PROJECT Status: In development – infrastructure work well advanced, Mine life: 10.3 years Payable Production: 1,006,000 ozs Annual Production (aver.): 96,700 ozs (101,800 ozs Au years 1-5, 92,700 ozs Au years 6-10.3) Capital Cost: US$182.5m (inc. mining fleet) Cash Cost (Ave): US$ 442 /

  6. Slide 6: Construction Philosophy

    CONSTRUCTION PHILOSOPHY Strong experienced owners team Self execute strategy using experienced consultants and sub contractors experienced in the Philippines including:  PAIE – project control  Contromation Energy Services – design and schedule  Goldfields – Biox® process expertise Develop sup

  7. Slide 7: Runruno Construction Timeline

    RUNRUNO CONSTRUCTION TIMELINE Q1, 2013 Q2, 2013 Q3, 2013 Q4, 2013 Q1, 2014 Q2, 2014 H2, 2014 Infrastructure Commence Mine pre-stripping Commence Construction Construction First production Development mine stripping Construct TSF mining Pit development Ore production Ramp up Equity fundin

  8. Slide 8: Site Works

    SITE WORKS  Program of work to support full construction activities  Includes: • General site earthworks – 75% complete • Processing plant pad earthworks – complete and within budget • Project access road – substantially upgraded • Establishment of site roads – 80% complete • Erection of construct

  9. Slide 9: Site Layout

    . a S . SITE LAYOUT expioration \

  10. Slide 10: Processing Plant Pad - Completed

    PROCESSING PLANT PAD - Completed 10

  11. Slide 11: Process Plant Contract

    PROCESS PLANT CONTRACT  To be constructed using a self execute strategy  Team being assembled  Design and layout finalised  Detailed engineering design 50% complete – will support for quick construction  15 month on the ground construction timetable  Process plant construction to commence in s

  12. Slide 12: Camp Site and Batch Plant Area

    CAMP SITE and BATCH PLANT AREA Office Camp Mess Concrete Batch Plant 12

  13. Slide 13: Mine Pit Access

    MINE PIT ACCESS Mine Haul Road from Starter Pit Mine Haul Road to Starter Pit Mine Pit Design Mine Haul Road 13

  14. Slide 14: Infrastructure

    INFRASTRUCTURE Potable Water System Grid Power Connection – 69kV Solano – Runruno Access Road 14

  15. Slide 15: Resources and Reserves March 2011 & April 2013

    RESOURCES AND RESERVES March 2011 & April 2013 Runruno Main Ore Gold Molybdenum Reserve Category Mt g/t M Oz ppm M lbs Proven 10.2 1.90 0.62 616 13.9 Probable 4.8 1.77 0.27 414 4.4 2P Reserves 15.0 1.85 0.90 603 18.3 Additional Inferred 2.9 1.73 0.16 258 1.7 Resource in-pit Ore Gold Molybdenum Resou

  16. Slide 16: Regional Location

    REGIONAL LOCATION Airfield – Bagabag airfield 5 kms north of Solano •Solano Road – upgrade allowed along parts of the road. Currently passable all year. •Bayombong “Project is well served by existing infrastructure.” Power supply – switch yard in Bayombong will be the origin for the new 69Kv line to

  17. Slide 17: Project Description

    PROJECT DESCRIPTION Five key components:  Mine Open Pit and Run of Mine (ROM) Pad  Process Plant facility consisting of conventional crushing, grinding, flotation, along with BIOX® and gravity recovery  Tailings Storage Facility (TSF): to ensure materials are properly managed and to reclaim water

  18. Slide 18: Mining

    MINING  Open pit area - 600m x 1,500m  1.75 Mtpa ore - transported by conveyor to the Process Plant  9.1 Mtpa overburden - used for the construction of the Tailings Storage Facility and in-pit backfill  During the first three years, waste material will be used in the construction of the Tailings

  19. Slide 19: Gold Processing

    GOLD PROCESSING Pressure Oxidation, & BIOX® processes tested Ore contains free and refractory gold BIOX® offers: and molybdenite  Reduced capital intensity  Lower operating costs Gold circuit demonstrated by extensive  Proven process testwork including 20t pilot plant  Ease of operation  Gra

  20. Slide 20: Molybdenum Opportunity

    MOLYBDENUM OPPORTUNITY Molybdenite occurs at Runruno as very fine 10-20 µm grains with pyrite and silicate minerals  Hydrometurgical Mo recovery circuit in development – Electrometals Laboratory Queensland  Modular add-on to gold circuit  Mo solubilised in the BIOX process with no additional proc

  21. Slide 21: Tailing Disposal

    TAILING DISPOSAL Tailing Storage Facility (TSF)  Permanent storage of treated tailings in valley adjacent to the Process Plant  2 year starter embankment established using pit pre-strip  Dam lifted to final height during initial 3 years of production  Designed to national and international stand

  22. Slide 22: Current Activities

    CURRENT ACTIVITIES  Finalise funding package, equity in place debt by end of year  Infrastructure development  Commissioning mining fleet  Award process plant construction package  Finalise land acquisition – 85% completed  Decommissioning small scale mining operations  Environmental manageme

  23. Slide 23: Regional Exploration - Activities

    REGIONAL EXPLORATION - ACTIVITIES Active systematic exploration underway Diamond drilling IP and resistivity survey Aeromagnetic survey Ground mapping Geochemistry Remote sensing Early drilling results encouraging  Identification of Runruno styled •Southern Extension mineralisation south of

  24. Slide 24: Southern Extension Area

    SOUTHERN EXTENSION AREA  Potential gold / molybdenum zone outlined south of the Runruno pit;  Initial inferred resource 7.55 million tonnes @ 1.4 g.t Au containing 340,000 ozs Au • Flat dipping zone • Indicated grades 2-3 g/t Au in continuous lenses • 8-12 m thick  Zone open to the south and west

  25. Slide 25: Corporate Social Responsibility

    CORPORATE SOCIAL RESPONSIBILITY Education & Training Scholarships and assistance Adopt a school programme Out of work youth skills training programmes Teachers salaries Mature age learning programmes Multiple award winner Health & Nutrition Provision of a professionally staffed clinic inclu

  26. Slide 26: Corporate Social Responsibility

    CORPORATE SOCIAL RESPONSIBILITY  Environment Protection and Enhancement  Environmental monitoring  Slope stabilisation and rehabilitation of disturbed areas  Forest regeneration  Multiple award winner  Communication Information and Education  To shape desirable social opinion about the compan

  27. Slide 27: Environment

    ENVIRONMENT Air quality monitoring at Runruno Barangay Hall and Elementary School. Water quality monitoring at Dawson Creek and upstream Sulong River. 27

  28. Slide 28: Rehabilitation & Slope Stabilisation

    REHABILIATION & SLOPE STABILISATION 28

  29. Slide 29: Extensively Awarded for Excellence in Environment, Social and Safety Programs

    EXTENSIVELY AWARDED for EXCELLENCE IN ENVIRONMENT, SOCIAL and SAFETY PROGRAMS 29