Kingsgate Consolidated Limited · ASX:KCN
Kingsgate Consolidated — Q3 2012 Earnings Presentation
17 slides from Kingsgate Consolidated's earnings presentation, October 2012
Slide 1: Kingsgate Consolidated Limited September Quarter 2012
Kingsgate Consolidated Limited September Quarter 2012
Slide 2: Disclaimer
Disclaimer Forward Looking Statements: These materials include forward looking statements. Forward looking statements inherently involve subjective judgment & analysis & are subject to significant uncertainties, risks & contingencies, many of which are outside of the control of, & may be unknown to,
Slide 3: September Quarter Highlights
September Quarter Highlights • Group gold production of 44,264oz, up 2% at total cash cost of US$712/oz. • Metallurgical licence granted for Chatree North (Plant 2). • Chatree gold production of 26,627oz with Plant 2 off-line in September for final plant verification and testing. • Challenger gold p
Slide 4: Chatree
Chatree Plant 2 offline during Sept for final Reduced verification by Thai authorities. Operational 984Kt @ 0.91g/t for 26,627oz. Performance Higher grade with lower recovery Total cash costs US$626/oz (incl. Total Cash Costs US$163/oz royalty). Higher by-product credits. Low capex incre
Slide 5: Chatree Underground Targets
Chatree Underground Targets Long sections for A Pit and C Pit
Slide 6: Challenger
Challenger 150Kt @ 3.89g/t for 17,637oz Production Reflects Focus on u/g development to Development Focus establish new mining fronts at Challenger West & Challenger Deeps Total cash costs US$843/oz (incl. US$65/oz royalty). Total cash Costs Costs reflect shift from production to development
Slide 7: Challenger Operations
Challenger Operations Challenger decline planned development Challenger West Pit Challenger Pit Surface 1193mRL 1000mRL Vent Shaft CW 79 Fault 800mRL Challenger West CW 600mRL 400mRL Challenger Deeps 280 Exploration drive AMINUS/M1/M2 200mRL 95mRL
Slide 8: Nueva Esperanza
Nueva Esperanza Draft feasibility confirms viability. Work continuing to optimise capital & Feasibility Study operating costs and development route. Feasibility identified lack of certainty in power costs as a key issue. Power Supply Trade-off study to determine optimum power supply incl. on
Slide 9: Bowdens Upside Potential
Bowdens Upside Potential Resource to grow and option for one large pit Resource drilling continued to intersect mineralisation outside current resource. Metallurgical test results deliver improved recovery over previous met. work. Assays include 28m @ 111.7 AgEq and 9m @ 104.3 AgEq. Feasibil
Slide 10: Akara Loan Re-financed
Akara Loan Re-financed • Six year amortising multi currency loan facility with CIMB. • Equivalent to US$125 million plus Thai Baht working capital facility equivalent to US$15 million. • Improved terms from existing facility due to more favourable market conditions and strong cash flow generation fr
Slide 11: Outlook
Outlook • Group gold production for FY13 expected to be 200,000 to 220,000oz. • Chatree gold production between 120,000 to 130,000oz. • Challenger gold production between 80,000 and 90,000oz. • Nueva Esperanza feasibility evaluating power supply options and development route. • Bowdens updated resou
Slide 12: Kingsgate Consolidated Limited
Kingsgate Consolidated Limited Shares: 151 Million Market Cap: ~A$850 Million ASX: KCN www.kingsgate.com.au
Slide 13: Appendix: General Disclaimer
Appendix General Disclaimer: The information contained in this presentation is for informational purposes only and does not constitute an offer to issue, or arrange to issue securities or other financial products. The information contained in this presentation is not investment or financial product
Slide 14: Chatree
Chatree Chatree Ore Reserves as at 30 June 2012 (>0.3g/t gold cut-off grade) Gold Silver Gold Silver Grade Tonnes Grade Contained Contained AuEq Source Category (millions) (g/t) (g/t) (Moz) (Moz) (Moz) From Pits Proven 46.2 0.79 7.9 1.17 11.7 1.30 Probable 16.7 0.72 5.9 0.39 3.2 0.42 Stockpiles 8.4
Slide 15: Challenger
Challenger Challenger Ore Reserves as at 30 June 2012 Tonnes Gold Gold Source Category Grade Contained (million) (g/t) (‘000 oz) From Mine Proven 0.64 4.32 90 Probable 2.61 6.61 550 Challenger Total Total 3.25 6.16 640 Challenger Mineral Resources as at 30 June 2012 Tonnes Gold Gold Source Category
Slide 16: Nueva Esperanza
Nueva Esperanza Nueva Esperanza Mineral Resources as at 30 June 2012 (0.5g/t AuEq cut-off grade) Gold Silver Gold Silver AgEq AuEq Tonnes Grade Grade Contained Contained Contained Contained Category (millions) (g/t) (g/t) (Moz) (Moz) (Moz) (Moz) Measured 1.8 0.01 90 0.00 5.1 5.2 0.12 Indicated 20.2
Slide 17: Bowdens
Bowdens Bowdens Mineral Resources as at 30 June 2012 (30g/t AgEq cut-off grade) Grade Contained Metal Category Tonnes (t) Silver Lead Zinc AgEq Silver AgEq AuEq g/t % % g/t (Moz) (Moz) (Moz) Indicated 31.2 60.6 0.30 0.40 77.5 60.8 77.8 1.73 Inferred 27.0 44.0 0.30 0.40 61.0 38.2 53.0 1.18 Indicated