Elixir Energy Limited · ASX:EXR

Elixir Energy — Elixir Petroleum — Investor Presentation (January 2018)

15 slides from Elixir Energy's investor presentation, Jan 23, 2018

  1. Slide 1: Elixir Petroleum – Mongolian CBM PSC: Delivery of Project Khiimori

    Elixir Petroleum – Mongolian CBM PSC For personal use only Delivery of “Project Khiimori” (ASX:EXR) January 2018

  2. Slide 2: Elixir Investment Highlights

    Elixir Investment Highlights For personal use only  Golden Horde Ltd (GOH) was established in 2011 as a pure play Mongolian CBM gas (coal-bed methane – CSG in Australia) exploration venture  Elixir has an exclusive option to 30 September 2018 to acquire GOH for 79M shares in Elixir  GOH has advis

  3. Slide 3: Project milestones progressing

    Project milestones progressing For personal use only  Deadline now passed for superior offer for GOH providing Elixir with exclusivity to acquire all of the shares of GOH on or before 30 September 2018  GOH Managing Director recently visited Ulaanbaatar to progress discussions with the Mongolian a

  4. Slide 4: Technical Workshop Outcomes – Brisbane 2018

    Technical Workshop Outcomes – Brisbane 2018 For personal use only  Technical workshop held on Friday 19 January 2018 at Siecap offices in Brisbane  CSG/CBM experts in geology, engineering, operations and commercial development met to discuss and opine on Project Khiimori and the forward exploitati

  5. Slide 5: Project Area Key Facts

    Project Area Key Facts For personal use only  Large 7 million acre project area – 100% ownership  World class producing thermal coal deposits within project area in South Gobi coal basin  Close to border of world’s 3rd largest gas user in Northern China  Will be first unconventional hydrocarbon

  6. Slide 6: Project Area Key Facts (cont.)

    Project Area Key Facts (cont.) For personal use only Large 7 million acre project area – 100% ownership World class producing thermal coal deposit within project area (South Gobi basin) China/Mongolia Southern Border  Technical studies indicate South Gobi Basin most prospective basin in Mongolia fo

  7. Slide 7: Key Technical Components for CBM

    Key Technical Components for CBM For personal use only Properties Bowen Basin Block IX Comments (Queensland) (South Gobi Basin) World class seam thickness –  Seam Maximum single seam > 55m found in multiple thickness thickness 30m occurrences very high GIP per acre 7-14 m3/tonne in most Up to 15 m3

  8. Slide 8: GOH's road to a CBM PSC

    GOH’s road to a CBM PSC For personal use only  GOH executed a CBM Prospecting Contract with the Petroleum Authority of Mongolia (PAM) in January 2016  Work under that Contract was finalised in 2016:  Data gathering and field prospecting – summarised in a formal Prospecting Report delivered to the

  9. Slide 9: Project Khiimori Milestones

    Project Khiimori Milestones Two Year Programme required to deliver key Milestones For personal use only Completed 2018 Programme 2019 Programme Initial Second 2019 Drilling 2018 Drilling Prospective CBM Technical Prospective 2D Seismic Programme (2 Programme (2 Workshop Resource Acquisition* Resourc

  10. Slide 10: 2018 Project Khiimori Milestones

    2018 Project Khiimori Milestones EXR has commenced exploration activity pre PSC award date For personal use only Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Operational Field Season CBM Workshop Field Mapping – commencement imminent Completion of Technical Studies Exploration Program Finalisatio

  11. Slide 11: Pro Forma Capital Structure

    Elixir Petroleum Limited (ASX:EXR) Pro Forma Capital Structure For personal use only Pre Acquisition Post Acquisition Current (million) Current (million) Ordinary Shares (ASX:EXR) 221.4 Ordinary Shares (ASX:EXR) 300.4 Unlisted Options (ex 4.0 – 4.5 cents) 11.0 Unlisted Options (ex 4.0 – 4.5 cents) 1

  12. Slide 12: Investment Summary

    Investment Summary For personal use only  Modest total investment with long activity timeline and significant upside potential  First mover status on ASX in Mongolian CBM space  100% ownership and control over project – essential for small company  GOH has extensive relationships in Mongolia at

  13. Slide 13: Important Notice & Disclaimer

    Important Notice & Disclaimer For personal use only This document has been prepared by Elixir Petroleum Limited (ABN 51 108 230 995) (“Elixir”) in connection with providing an overview of its business to interested analysts/investors. This presentation is being provided for the sole purpose of provi

  14. Slide 14: Contact Information

    Contact Information For personal use only Dougal Ferguson Managing Director +61 (08) 9226 2111 dferguson@elixirpetroleum.com 14

  15. Slide 15: Appendix: Peer Companies in China and Mongolia

    Appendix: Peer Companies in China and Mongolia For personal use only Company Summary of operations Market Capitalisation G3 Exploration • China CBM play (previously • 60/40 Joint Venture with Petro China GBP 99 Million Green Dragon • 3P reserves of 2.4 Tcf ~A$173 Million Gas) • 2P reserves of 549Bcf

Elixir Petroleum — Investor Presentation (January 2018) on 6ix